Search Documents

  • CIM
    Continuous Process for the Production of Lithium Carbonateq

    By C. A. Olivier

    Le Ministère des Richesses naturelles du Québec has continued development work on the process/or direct reaction 0/sodium carbonate with lithium-bearing silicates(Canadian Patent No. 643,843). Recent

    Jan 1, 1979

  • SME
    29. Golden Grove Discovery Case Histories ? Introduction

    The Golden Grove Project area is located 220 km (137 miles) east of Geraldton in Western Australia (Fig. 1). The project is a joint venture involving Amax Exploration (Australia) Inc. (Amax), Electrol

    Jan 1, 1991

  • CIM
    Flotation of Different Particle Sizes as a Function of Bubble Surface Area Flux

    By K. Honkivaara, S. Junnikkala, J. Aho, K. Föhr, P. Lampinen

    "Bubble area flux has been claimed to be a major tool to dimension flotation equipment. The paper describes laboratory scale (batch and 301 continuous cell using plant feed) and small-scale (1 ,8m3) i

    Jan 1, 2000

  • NIOSH
    RI 7432 Rock Noise Source Location Techniques

    By Fred Leighton

    The Bureau of Mines has developed rock noise source location techniques that may be used to obtain precise and practical source locations from micro-seismic field data. These techniques enable one to

    Jan 1, 1970

  • AUSIMM
    Structure and Sedimentation in the Western Coalfield of New South Wales

    The stratigraphy of the Western Coalfield is briefly reviewed and the important units of the Lithgow Coal Measures, particularly the coal seams, are defined. The possibility of coal measures of Tomago

    Jan 1, 1960

  • NIOSH
    OFR-24(6)-84 Mining And Rock Mechanics Research In Oil Shale And Nahcolite, Horse Draw Shaft, Colorado - Appendix Volume A-4 Surface Testing

    During the period 1979 thru 1982, Multi Mineral Corporation conducted a mining research program at the United States Department of the Interior's Bureau of Mines Oil Shale Mining Environmental Re

    Jan 1, 1983

  • AUSIMM
    Geological Structure and Ore Occurrence at Norseman, Western Australia

    The Phoenix mine on the Mararoa Reef at Norseman, Western Australia, provides an outstanding: AUstralian instance of the recurrence of payable ore beneath the bottom of an abandoned mine, and an inter

    Jan 1, 1950

  • AUSIMM
    Computer-Based Design of Open Cut Mines

    Three stages are involved in the complete design and evaluation of an open cut mine. These are:1. design of the optimu,m ultimate pit, and selectionof the optimum mill capacity,2. development of produ

    Jan 1, 1970

  • AUSIMM
    Recovery of Precious Metals from Chloride Solution by Magnetite

    Recovery of Precious Metals from Chloride Solution by Magnetite The development of environmental-friendly lixiviants as alternatives to cyanide and the increasing recycling activities to recover prec

    Sep 13, 2010

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • IOM3
    Extension of mathematical model of a crusher to an impactor

    By M. R. Smith, H. Kanli

    The impact crusher is a popular device for producing crushed aggregates from non-abrasive rocks such as limestones, offering the advantages of high reduction ratios and relatively low installed costs.

    Aug 1, 1995

  • SME
    The Route To More Efficient Blind Shaft Drilling?

    By Colin P. Pigott

    The paper describes a variety of existing techniques and equipment which when combined together permit faster and cheaper drilling of shafts in soft to medium strength formations. Drilling fluid circu

    Jan 1, 1985

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • AUSIMM
    Recovery of Rhenium from Mineral Raw Materials of Kazakhstan

    Recovery of Rhenium from Mineral Raw Materials of Kazakhstan

    Sep 13, 2010

  • SME
    Case study ? ventilation planning for Bog Zone, Lisheen Mine

    By K. Hopperstead

    Ventilation planning in trackless metal mining is often taken for granted. This paper highlights the trials of planning and executing the ventilation design for Bog Zone at the Lisheen Mine. Ventilati

    Jan 1, 2009

  • TMS
    Effect of Normality, Temperature and Time on the Tungsten Losses in the ResidueSeparated from Diluted Scheelite-Slurry-in-NaOH after Digestion

    By Raj P. Singh Gaur

    Due to high concentration of NaOH in the digested slurry after scheelite digestion, it is diluted to about 4N before filtration to separate sodium tungstate solution from the sludge (residue). Howeve

    Jan 1, 2006

  • SME
    Excess Spoil Minimization And Fill Stability

    By M. Superfesky, P. Michael

    Introduction The US Office of Surface Mining (OSM) is proposing changes to the Code of Federal Regulations in the interest of minimizing the adverse effects of excess-spoil-fill construction on the

    Jan 1, 2007

  • NIOSH
    Use of Rocsil® Foam to Remotely Construct Mine Seals

    By Cliff McCartney, Michael A. Trevits

    The National Institute for Occupational Safety and Health (NIOSH) is conducting a program of research to evaluate and improve remote mine seal construction technology for mine fire control and suppres

  • AUSIMM
    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits

    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits With increased emphasis on reducing costs and carbon emissions in mineral processing, it is becoming essential to

    Sep 13, 2010