Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Theory and Technology of Mining Subsidence Control by Grouting the Overlying Strata Separations with Fine-Coal Ash

    By Yanfa Gao

    Abstract In order to control and reduce ground subsidence due to coal mining, and to protect building, railway and other surface construction, a new subsidence control method is proposed. Ground subsi

    Jan 1, 2002

  • SME-ICGCM
    Ground Control Practice at Leeville Underground Mine

    By Changshou Sun

    The geotechnical properties of mining zones at Leeville Underground mine (or simply called Leeville mine through this paper) are different from one zone to another. The typical ground condition is poo

    Jan 1, 2013

  • SME-ICGCM
    Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated Floor

    By Weidong Pan, Yinchao Yang, Baodong Zuo

    Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining

    Jan 1, 2017

  • SME-ICGCM
    Time Dependent Mining Induced Subsidence Measured by Differential Interferometric Synthetic Aperture Radar

    By Jessica M. Wempen

    Differential Interferometric Synthetic Aperture Radar (DInSAR), a satellite-based remote sensing technique, has been demonstrated as a potentially practical method for measuring mining induced surface

    Jan 1, 2014

  • SME-ICGCM
    Numerical Analysis of the Effect of Coal Seam Characteristics on the Longwall Top Coal Cavability

    By Rudrajit Mitra, Tien Dung Le, Chengguo Zhang, Bruce Hebblewhite, Joung Oh

    "Geomechanical and geotechnical characteristics of coal seam are important parameters that directly affect the cavability of top coal in the longwall top-coal caving (LTCC) method. The impact of these

    Jan 1, 2017

  • SME-ICGCM
    Development of Road Header Roof Bolting Module

    By Sean C. Farrell

    In underground mining and tunneling, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Australian companies WDS Limited and Cram Fluid P

    Jan 1, 2014

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden

    By Guy Reed, Russell Frith, Kent Mctyer

    "Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l

    Jan 1, 2016

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Tekcrete Fast®: Fiber-Reinforced, Rapid-Setting Sprayed Concrete for Rib and Surface Control

    By Stephen C. Tadolini, Minova USA Inc., Peter S. Mills, David R. Burkhard

    "Fiber-reinforced spayed concrete has been used for several years in civil and tunneling operations. Research conducted to reduce cure times and increase compressive and flexural strengths resulted in

    Jan 1, 2017

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    Development of a New Roof Bolt Technology to Improve Gate- Road Performance

    By Vince Caggiano

    The newly developed Hilti OneStep roof bolt combines the standard 5-step anchoring process (i.e. drilling, transfer of drill steel, insertion of resin, insertion of rod and tightening) into one easy o

    Jan 1, 2005

  • SME-ICGCM
    Volumetric Measurement of Rock Movement Using Photogrammetry

    By Stephen R. Iverson, Jeffrey C. Johnson, Donovan J. Benton, Michael J. Raffaldi, Lewis A. Martin

    "The NIOSH ground control safety research program at Spokane, Washington, is exploring applications of photogrammetry to rock mass and support monitoring. This paper describes two ways photogrammetric

    Jan 1, 2015

  • SME-ICGCM
    How to Mitigate Coal Mine Bumps Through Understanding of the Violent Failure of Coal Specimens

    By Gamal Rashed

    This research is divided into two parts: the first part of this research focuses on understanding coal mine bump mechanisms, and the second part focuses on mitigating the violent failure associated wi

    Jan 1, 2013

  • SME-ICGCM
    Evaluation Of Mobile Roof Support Technologies

    By Hamid Maleki

    This study presents a historic overview of the role of mobile roof support (MRS) technologies in improving stability and worker safety and presents the results of recent field evaluations of the MRS l

    Jan 1, 2001

  • SME-ICGCM
    Eclipse Bolting System

    By Alan Campoli

    The Eclipse System was developed by Minova USA Inc. formerly Fosroc Inc. to improve the performance of 5/8-inch deformed rebar fully grouted into a one inch borehole. An 1/8-inch offset bolt head comb

    Jan 1, 2003

  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    A New Combination Friction-Suspension Support System Scott Cable Slings

    By James J. Scott

    Over the past two years research, development ad field tests have been conducted on a new product called the "Scott Cable Sling". This work resulted in the awarding of U.S. Patent No. 4265571 on May 5

    Jan 1, 1981

  • SME-ICGCM
    Analysis Of Practical Ground Control Issues In Highwall Mining

    By R. Karl Zipf

    Highwall mining is an important coal mining method. Upwards of 60 highwall miners are presently in operation, and they may account for approximately 4% of total U.S. coal production. A review of the M

    Jan 1, 2004