Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Extractive Metallurgy Of Rhenium: A Review

    By C. D. Anderson

    A variety of processing technologies exist for recovery from both primary and secondary sources of rhenium. Currently, there are no known primary rhenium deposits, thus, the method in which primary rh

    Feb 27, 2013

  • SME
    BlastingTechniques and Modern Explosives Allow More Efficient Coal Mining

    The first of this three part series examines he history and some of the properties and characteristics of explosives. Use of explosives is discussed for underground and surface coal operations—the la

    Jan 7, 1981

  • SME
    Hydrologic and Environmental Behavior of GeoWaste and Waste Rock in Field Experimental Piles - Mining, Metallurgy & Exploration (2021)

    By MOHAMMAD R. H. GORAKHKI, Christopher A. Bareither, MANUEL APARICIO, Joseph Scalia IV

    The focus of this study was on the evaluation of hydrologic and environmental behavior observed in GeoWaste and waste rock test piles. GeoWaste is a mixture of fast-filtered tailings and waste rock pr

    Mar 31, 2021

  • SME
    Mechanical Mining In Hard Rock: A Glimpse Into The Future

    By R. J. Robbins

    The mechanization of hard rock underground mines offers a large potential for reducing cost, improving efficiency, and increasing profitability. However, in spite of serious efforts by quite a number

    Jan 1, 2001

  • SME
    Tonnage Factor – A Matter of Some Gravity

    By I. S. Parrish

    One of the most common errors uncovered while performing a reserve, or resource, audit is not in the geological modeling or grade problems due to poor sampling, prepartion or assaying. The error most

    Jan 1, 1993

  • SME
    Quantifying and Monitoring Control Room Protection Factors against Respirable Dust at an Underground Crusher Booth

    By J. R. Patts, J. P. Rider, J. A. Organiscak, A. B. Cecala

    "NIOSH recently completed a 15-month study at an underground limestone mine crusher booth which evaluated three research parameters: (1) the effectiveness of a single-filter filtration and pressurizat

    Jan 1, 2017

  • SME
    T& UC Tunnel Demand

    TABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study

    Sep 1, 2013

  • SME
    Magnetic Field Application In Cationic Silica Flotation Of Magnetic Taconite Concentrates (e19dde4c-abfd-4256-888b-d05febe2f23a)

    By S. Ersayin, I. Iwasaki

    Application of a magnetic field was shown to be effective in controlling iron losses in pilot-scale cationic silica flotation in the processing of magnetic taconite concentrates. The design of a magne

    Jan 1, 2002

  • SME
    Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, Arizona

    By William D. Leech, Ronald E. Romley, Gary N. Sheppard

    The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The

    Jan 1, 1991

  • SME
    Designing, Scheduling And Managing Waste Rock Facilities - A Case Study On The Waste Rock Facilities At The Phoenix Mine, Nevada.

    By V. Galla

    Waste rock facilities (WRF) generally have a large footprint depending on the strip ratio the mine plan provides. Considerable planning is involved during the initial phase of the mine plan regarding

    Jan 1, 2011

  • SME
    Geotechnical Design of Devil’s Slide Tunnel

    By Y. Nien Wang, Moe Amini, Heiner Sander, Max John

    INTRODUCTION As the population increased along the coast route (California Route 1), and the people’s need to have guaranteed access increased, the landslides and related road closures began to ha

    Jan 1, 2005

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005

  • SME
    Optimization Of Shovel Dipper-Formation Interactions In Excavation

    By S. Frimpong

    Shovel excavation constitutes a significant component of production costs in any surface mining operation. This makes shovel loading an important cost center that needs to be improved to lower product

    Jan 1, 2011

  • SME
    Chambers Creek Interceptor Sewer Tunnel

    By J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass

    The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll

    Jan 1, 1985

  • SME
    Caterpillar With Tunnel Boom Boosts Productivity On Swiss Project

    A dedicated tunnel construction version of the Caterpillar 328D LCR compact radius excavator is proving highly productive on the A9 Autoroute construction project near Visp, in Switzerland. It is the

    Jan 1, 2009

  • SME
    New Approach Of ASFINAG For Tunnel Construction Monitoring Of The Tauern Tunnel Project In Austria

    By Robert Schnab

    ASFINAG is responsible for the construction and operation of the Austrian highway system. It is approx. 2,400 km of highways and 65 tunnels with a total length of 200 km including the Tauern Tunnel.

  • SME
    Recovering Gold From Carbon Fines By Gold Transfer Process

    By E. M. Hill, H. K. Lin, J. L. Oleson

    When activated carbon is used for recovering gold in gold industry, carbon fine materials are generated in stripping, acid-washing and kiln regeneration circuits. The carbon fines at the Fort Knox mi

    Jan 1, 2002

  • SME
    Tailings Transport System Design Using Probabilistic Methods - Mining, Metallurgy & Exploration (2021)

    By Ian Farrell, Josh Stowe, Eric Wingeard

    Tailings transport system design is generally based on identifying the minimum and maximum process boundary conditions for pump selection and pipeline sizing. The approach is robust and well-proven. H

    Mar 31, 2021

  • SME
    Wastewater Remediation With Collophane (314ec19b-a061-40af-a337-ceb44bfd8995)

    By M. C. Fuerstenau

    Collophane, cryptocrystalline fluor-apatite, is examined as a substrate for plant water and wastewater remediation. The attenuation of Fe3+, Fe2+, Hg2+, Pb2+, and Cd2+ is presented as a function of me

    Jan 1, 2001

  • SME
    Sodium Sulfate – 5,000 Years of Mining and Processing Salt Cake

    By Donald E. Garrett

    Sodium sulfate is one of the larger tonnage industrial minerals. A little more than half of this tonnage — 3 Mt/a (3.3 million stpy) of natural product— is recovered from ore deposits. Most of the r

    Jan 1, 2002