    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • SME
    Crud Processing Improvements Using ACORGA® CB - 1000 Crud Busting Reagent

    By T. McCallum

    Crud is a common concern in SX processes and is formed as a complex solid stabilized emulsion of aqueous and organic.1,3 Crud formation is highly dependent on the amount of solids entering the circuit

    Feb 27, 2013

  • SME
    Design And Development Of The Northeast Layback Of The Betze-Post Open Pit

    By Nick Rose, Robert Sharon, Mark Rantapaa

    Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio

    Jan 1, 2005

  • SME
    Correct Identification Of Chrysotile Asbestos In Ores

    By Allison

    During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the

    Jan 1, 2005

  • SME
    The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction

    By Faruk Oksuz

    The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a

    Jan 1, 2008

  • SME
    Mechanized Ground Support System Design Using Safety Factor Analysis at the Turquoise Ridge Joint Venture, Nevada

    By L. Sandbak

    The Turquoise Ridge Joint Venture (TRJV) is located in northern central Nevada, and is situated within the Basin and Range province, near the northeast end of the Osgood Mountains (see Figure 1). The

    Feb 23, 2014

  • SME
    Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)

    By K. Severin, B. Flanigan, P. Marion

    “Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta

    Jan 1, 2000

  • SME
    Signal Processing With Wavelet Transform For In-Seam Seismic Based Mine Void Detection Technique

    By M. Ge

    Signal processing is a major challenge for In-Seam Seismic (ISS) technique. Fourier Transform is an important tool for signal processing such as frequency analysis. However, for ISS signal, localized

    Jan 1, 2007

  • SME
    Some Mitigative Measures for Protection of Surface Structures Affected by Ground Subsidence

    By L. You

    Theoretical and analytical analyses of three mitigative measures- plane fitting method, trenching, and tension cable led to the development of a total protection plan to eliminate or reduce damages to

    Jan 1, 1986

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • SME
    Ground Treatment for Tunnel Construction of Line 10 Extension to the Madrid Metro Under Difficult Ground Water Conditions

    By Manuel Arnáiz, Pedro R. Sola, Rogelio Baudot, Manuel Herrera, Carlos S. Oteo

    The aim of this paper is to describe and analyze the ground treatment performed between January and May 2002 in order to increase safety during excavation and reduce instability problems along 180 m o

    Jan 1, 2003

  • SME
    Shield Tunneling in Pure Sands - Merging the Application Fields of EPB and Slurry Shield Technologies

    By Carlos Henrique Turolla Maia, Ulrich Maidl, Marc Comulada, Julio Claudio Di Dio Pierri

    "Pure sands are typically the domain of slurry shields due to their high permeability and their granular characteristics. However, the Earth Pressure Balanced (EPB) shield machine technology has advan

    Jan 1, 2016

  • SME
    Tailings Paste Disposal ? More Than Water Recovery

    By S. Slottee

    The technology of making and using ?paste? from mine tailings is increasingly well known by the minerals industry. The primary applications are water recovery and ?stacking? of tailings with minimal

    Jan 1, 2011

  • SME
    Design And Construction Of The Lafayette Bluff Tunnel

    By D. L. Petersen, C. R. Nelson, B. K. Nelson, B. D. Wagener

    The Lafayette Bluff tunnel, currently under construction for the Minnesota Department of Transportation (MnDOT), will be among the widest highway tunnels in the United States. The 199-meter tunnel is

    Jan 1, 1991

  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010

  • SME
    Mountaintop Removal Controversy Slows West Virginia Coal Mining

    By Syd S. Peng

    Mountaintop removal (MTR) mining started in West Virginia nearly 30 years ago. This surface mining method can extract multiple coal seams as thin as a few inches in whole and minimum rock dilution in

    Jan 1, 2000

  • SME
    Tunneling Toronto Canada 1970

    By G. F. Jenkins, P. S. Hobden

    Toronto as a geographical area provides an exceptionally wide variety of subsoil stratiphication. Tunneling consequently required a very wide range of adaptabilities to meet its changing conditions. T

    Jan 1, 1997

  • SME
    Cable Shovel Dynamic Modeling For Determining Component Cycle Stress - Preprint 09-121

    This paper presents a virtual prototype for the stress analysis of cable shovel components based on combination of flexible and rigid body approach. The general mechanical system of the cable shovel i

    Jan 1, 2009

  • SME
    Annual Review 2006 – Mining Review

    By Staff

    The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages—basic (mining), intermediate processing, manufacturing of finish

    Jan 1, 2007

  • SME
    Borehole Hoisting For Shaft Sinking And Development At Brunswick Mining And Smelting Corporation Limited, Bathurst, New Brunswick

    By W. R. Dengler, R. S. Brown

    In 1974, Brunswick Mining and Smelting Corporation Limited started a 48 million dollar expansion programme at their property in Bathurst, New Brunswick. A portion of the expansion plans includes a 26

    Jan 1, 1976