    Automatic Control of a High Tension Roll Separator

    By F. E. du Plessis, P. De Waal

    Through the development of innovative in-line mineral quantification sensors, the possibility has arisen to apply modern control theory to implement automatic process control for electrostatic high te

    Jan 1, 2005

  • SME
    Stochastic Continuous Modeling for Pillar Stress Estimation and Comparison with 2D Numerical, and Analytical Solutions in an Underground Stone Mine

    By Juan J. Monsalve, Mario Karfakis, AMAN SONI, Nino Ripepi, Jim Hazzard

    Pillar collapses are events that due to their severe consequences can be classified as high risk. The design of pillars in underground room-and-pillar operations should migrate to risk-based design ap

    Sep 24, 2022

  • SME
    Northern Ontario Pushes to Expand Mining Investment

    By Steve Kral

    The mining industry in northern Ontario is known mostly for its huge nickel deposits. Inco’s and Falconbridge’s nickel mines in the Sudbury Basin are the best known. And with nickel prices being wha

    Jan 1, 2006

  • SME
    Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBM

    By Martin Herrenknecht

    After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between

  • SME
    Assessing Ground Ahead Of TBm Tunnel Using Low-Interruption Wireless Seismic Reflector Tracing System

    By Takuji Yamamoto

    High-speed TBM excavation requires rapid ground assessment ahead of excavation, particularly in complex grounds. The Tunnel Reflector Tracing technology (TRT) developed by authors, uses seismic reflec

  • SME
    Equitable Contracting And Risk-Sharing

    By J. K. Lemley

    The human element in large measure dictates success in contracting relationships. Because of our professional backgrounds, we view contracts primarily as either engineers, contractors or owners. A ben

    Jan 1, 1983

  • SME
    Robbins 10M Double Shield Tunnel Boring Machines On Srisailam Left Bank Canal Tunnel Scheme, Alimineti Madhava Reddy Project, Andhra Pradesh, India

    By William Brundan

    INTRODUCTION The Srisailam Left Bank Canal (SLBC) Tunnel Scheme is part of the Alimineti Madhava Reddy Project in Andhra Pradesh, South India. This scheme has been planned since 1983 and will provide

  • SME
    Federal Cooperation To Protect Watersheds Degraded By Coal Mine Drainage From Abandoned Mine Lands

    By B. Samoski

    In late 1994, EPA and OSM acknowledged that efforts by any one agency or by the many different agencies to remedy the water quality impacts of decades of contamination from abandoned coal mine lands

    Jan 1, 2002

  • SME
    Initial Support Design for Tunnels in Horizontally Bedded Sedimentary Rock

    By Irwan S. Halim

    For tunnels in horizontally bedded rock, geologic factors affect the selection and design of the initial supports, including the rock propensity toward parting along bedding and the resulting high pot

    Jan 1, 2008

  • SME
    Coal Resources For The Future: Summary Results Of The Us Geological Survey National Coal Resource Assessment

    By B. S. Pierce

    The National Coal Resource Assessment – 2000 project was a multi-year effort by the U.S. Geological Survey to identify, characterize, and assess the coal resources that will supply a major part of the

    Jan 1, 2001

  • SME
    EPB TBM Tunnelling in Singapore Old Alluvium

    By N. Loganathan, Tan Boon Tee, Joe O’Carroll, Richard Flanagan

    In recent years, tunnelling activities in Singapore have increased considerably with the construction of extensions to the existing sub-surface transport system, a deep tunnel sewerage disposal system

    Jan 1, 2005

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • SME
    The Economics of Silver and the Miner

    By Hugh Douglas

    In the past two years recent increases in silver prices over levels that prevailed for many years have changed supply/demand patterns. On the supply side, a silver mining boom is in progress in the Un

    Jan 1, 1981

  • SME
    Leaching And Electrochemical Behavior Of Gold In Iodide Solutions Part I: Dissolution Kinetics

    By J. B. Hiskey

    Of the halogens, the gold iodide complexes are the most stable in aqueous solutions. A series of experiments were performed to investigate the kinetics and mechanism of the leaching reaction between g

    Jan 1, 1990

  • SME
    U. S. Coal Producers Have Reason to Take Heart

    By Steve Kral

    For an industry that provides more than half of the nation’s energy needs, the U.S. coal industry still attracts negative publicity. However, the nation’s energy appetite continues to increase. And

    Jan 1, 2002

  • SME
    Discussion - Some New Findings From Surface Subsidence Monitoring Over Longwall Panels - Luo, Y., Peng, S. S.

    By E. Arioglu

    Discussion by E. Arioglu Y. Luo and S.S. Peng are to be congratulated for their outstanding paper providing new results from surface subsidence monitoring over longwall panels under different condi

    Jan 1, 1993

  • SME
    Project Management For Dummies, Or “How To Improve Your Project Success Ratio In the New Millenium”

    By R. J. Hickson

    From 1993 through 1999 Cyprus Amax Minerals Company successfully completed eight major construction projects around the world. Six greenfield mines were brought into production, an ongoing operation w

    Jan 1, 2000

  • SME
    Los Angeles Metro Gold Line Eastside Extension—Tunnel Construction Case History

    By Christophe Bragard, Brett Robinson

    This paper reflects the challenges encountered during the construction of the light rail tunnels under Boyle Heights, in Los Angeles, California. Equipped with two state-of-the-art EPB TBMs, the c

    Jan 1, 2007

  • SME
    Rheology of ore suspensions with fibrous minerals and its impact on flotation performance Mining, Metallurgy and Exploration

    By P. Somasundaran, D. R. Nagaraj, Tarun Bhambani, P. Patra

    Flotation separation and recovery of value minerals from ores containing fibrous silicate minerals are known to be quite challenging. Earlier studies have established that the metallurgical challenges

  • SME
    High Throughput, High Solids Flotation Of 20 X 200 Mesh North Carolina Phosphate In A Short Column Cell

    By Louis M. Schlesinger, Michael J. Garska, Joel F. Hutwelker, James T. Jr. Tanner

    A pilot plant was constructed and operated to investigate the column flotation of 20 x 200 mesh North Carolina phosphate ore, using high throughput, high solids operating conditions developed at the N

    Jan 1, 1993