Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Industrial Minerals 2004 - TitaniumThe market for titanium feedstocks (ilmenite, rutile,synthetic rutile and slag) is driven primarily by offtake from the titanium dioxide (TiO2) pigment industry. The pigment sector depends on the per
Jan 1, 2005
-
Raw Ore Selection By Artificial Vision (cc61426b-f93b-4b6c-89d5-720512c7133c)By P. Massacci, F. La Marca, G. Bonifazi
Certain deposits of incoherent materials which are near the surface and exploitable by open-pit mining may be characterized in real time before they are mined through an analysis of ground-surface ima
Jan 1, 1999
-
Influence Of Environmental Regulations On The Design Of Barrick Goldstrike’s Roaster Off-Gas Cleaning Circuit (59b0e343-de58-4518-9d0e-e7d0bcede677)By A. Cole, F. Porretta
Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean
Jan 1, 2002
-
An Early Warning Slope Monitoring System For Local Work Areas In MinesBy D. Noon
Mine production crews and drill-and-blast crews may be exposed to unexpected movement of ground when working under pit slopes. Without specialist geotechnical advice and appropriate measurement system
Jan 1, 2012
-
Upside Down Concrete Accelerates Large Tunnel ProjectBy George Joseph Malina
Contractor chose and Owner allowed concrete to be placed using the arch first principle while excavating the 35'-3" O.D. rock tunnel. The contract included excavating and lining 26,000 L.F. of ro
Jan 1, 1981
-
Innovative NATM Technology for Suburban Tunnelling Metro Section 306, Bochum, GermanyBy Axel Nitschke, Josef Arnold
Bochum’s Underground Lot 306 was characterised by a confined site and unique tunnelling methods. A highly mechanized construction concept was developed to achieve high progress rates. Bespoke backup s
Jan 1, 2005
-
Drilling And Lining Of The Ocean Shafts - Seabrook Power ProjectBy B. J. Dave, Ashok J. Desai, Allen J. Hulshizer
This paper presents various design and construction considerations involved in developing an underwater installation of lined, large diameter shafts not known to have been previously accomplished for
Jan 1, 1976
-
Pre-Failure Pillar YieldingBy J. F. T. Agapito, R. R. Goodrich
Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual
Jan 1, 2001
-
Mining Foundation of the Southwest Honors 2002 InducteesThe 20th annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Westin La Paloma in Tucson, AZ, on Saturday, Dec. 7, 2002. This y
Jan 1, 2002
-
Measurement and Analysis of Ground Movement and Load Redistribution at a Longwall Mine in Central UtahTo gather additional field data from the western United States, researchers from the National Institute for Occupational Safety and Health (NIOSH) installed an array of field instrumentation at a long
Jan 7, 2020
-
Use of Seismic Tomography in Mining – Preprint 97-42By D. K. Denton, M. J. Friedel, D. F. Scott, T. J. Williams
Spokane Research Center personnel have been investigating the use of seismic tomography to monitor the behavior of a rock mass, detect hazardous ground conditions, and assess the mechanical integrity
Feb 24, 1997
-
Availability Of Coal For Efficient, Low-Cost Underground Mining In Illinois – Preprint 97-162By C. Treworgy, C. Chenoworth
Geologic and technical factors such as coal seam thickness, stripping ratios, roof conditions, partings, faults, and size and geometry of the reserve block greatly impact the availability of Illinois
Feb 24, 1997
-
Statistical Evaluation Of The Effect Of Conditioning Time And Slurry Concentration On The Flotation Performance Of Siliceous PhosphateBy S. Al-Thyabat
Conditioning of flotation feed is an important prerequisite for efficient flotation. This process depends on parameters such as conditioning time, slurry concentration and slurry pH. The objective of
Jan 1, 2008
-
Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
Government: Legislation, Regulations, & Court Rulings - The Year That Minerals Policy Wasn’tThe administration came on as a strong supporter of the mining industry in April of 1982 when President Reagan delivered his long-awaited minerals policy statement. He promised to reduce America'
Jan 5, 1983
-
Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern PennsylvaniaBy A. Iannacchione
Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where
Feb 27, 2013
-
Design Considerations And Evaluation Process For A New Tunnel And Ocean Outfall ProjectBy Steve Dubnewych
The Joint Water Pollution Control Plant, operated by the Sanitation Districts of Los Angeles County, treats wastewater generated by over three million people. A new tunnel and ocean outfall is being c
-
METSI - Innovative solutions and technologies for management of mining related water in South AfricaBy R. Schwarz, E. Pusch, A. Juch
"The paper describes in general the objectives, goals as well as theoretical background of "METSI"-project proposal submitted to German BMBF (Federal Ministry of Education and Research). The METSI pro
Jan 1, 2011
-
Automating Modeling Of Operational Data To Identify The Most Important FactorsBy S. Agarwal
The mining industry collects a significant amount of operational data. However, gleaning useful information from the terabytes of data is difficult, and not just because of the sheer volume of the da
Jan 1, 2011
-
Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and TunnelsBy Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister
The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe
Jan 1, 2005