Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Fatty acid separation of siliceous carbonate phosphatesBy J. Hanna
The University of Alabama Mineral Resources Institute (MRI) has developed a unique process for selective fatty acid flotation of carbonate gangue from sedimentary apatites (francolite) in the pH range
Jan 1, 1991
-
Water Jet Channeling In A Mountain Granite QuarryBy M. J. Liesveld, D. Liesveld
For a Colorado mountain quarry, the Water Jet Channeling Method is far superior to Burning, Sawing, Drilling, or Shooting with Primer Cord, Water, or Black Powder. Throughout the life of our quarry, w
Jan 1, 2004
-
Asbestos Industry at the Crossroads : Current Position and OutlookBy Jean Dupéré
Introduction Before examining the current position of the asbestos industry and its market outlook, it is important to describe the product itself. If we are to understand the problems besetting th
Jan 7, 1984
-
Recent Developments in Pressure Oxidation Treatment for Cannon Mine Concentrates (fc120084-4689-4c9e-b23e-9e33ffcd7654)By D. M. Larsen
Since start-up in 1985, the Cannon Mine has produced and shipped a 170-g/ton (5 oz/ton) gold flotation concentrate to various smelters for gold and silver recovery. Several processes have been investi
Jan 1, 1993
-
Technical Review Of Mine DevelopmentBy D. Tolgyesi, L. P. Gignac
Mine development has evolved in the past 15 years from a human-paced system using hand-held drills and track-bound equipment to a mechanized system using specialized equipment for each component of th
Jan 1, 1983
-
The Geotechnical Aspects Of The Shaft And Outfall Tunnel - Boston Harbor ProjectBy Sarah Vest, Richard Sherman, Leo Martin
In 1988 a major exploration program was undertaken to determine the characteristics of the rock and soil for a 7.6 m diameter sea outfall tunnel beneath Boston Harbor out into Massachusetts Bay. The d
Jan 1, 1991
-
A Blending-Based Approach to Mine Planning and Production Scheduling - I. IntroductionBy Mark Gershon
Most recent work in the field of mine production scheduling has focused on either the computerization of the traditional methods or the development of sophisticated mathematical optimization models. Y
Jan 1, 1986
-
The Role of Participatory Environmental Monitoring Committees in Mining Regions in PeruBy Manuel Bernales, Aldo Leon, Alexandra Carlier, Bern Klein, Andre Xavier
Mining companies and governments at both the local and national levels recognize that Participatory Environmental Monitoring and Surveillance Committees (PEMSC) are necessary mechanisms for meaningful
Jan 1, 2017
-
Thiourea Leaching Of Gold And Silver -Technology Update And Additional ApplicationsBy J. B. Hiskey
INTRODUCTION The extraction of gold and silver from ores, concentrates, and various metallurgical products can be achieved by a number of hydrometallurgical techniques. The solvation properties of al
Jan 1, 1984
-
Subsidence Control by BackfillingBy Alice S. Allen, James Paone
SURFACE SUBSIDENCE IN MINING The consequences of subsidence are becoming progressively more serious as the consumption of an ever- increasing quantity of minerals conflicts with the needs of an exp
Jan 1, 1982
-
Variable speed drives for semiautogenous millsBy J. H. Bassarear, P. F. Thomas
Large-scale equipment can reduce both capital and operating costs for concentrators. Large semiautogemus (SAG) mills can be effectively utilized in big mills but they must be kept fully loaded to tab
Jan 1, 1987
-
Westerschelde TunnelBy Otto Braach, Wolfgang Frietzsche, Erdogan Gürkan
The Westerschelde Tunnel is located in the south of the Netherlands and links the two parts of the Provinces of Zeeland, Zeeuws-Vlaanderen and Zuid-Beveland, which are separated by the Westerschelde.
Jan 1, 2003
-
Kidston - Discovery of the Kidston Deposit, Queensland, AustraliaBy D. C. Rotherham
The Kidston gold discoveries were originally made about 1907, and by 1934, 1.76 Mg (62,000 oz) of gold had been produced from placer and lode mining of higher grade, most¬ly oxidized gold ore. As mini
Jan 1, 1990
-
Probability-Assigned Constrained Kriging For Precious Metal Reserve ModelingBy G. Pan
The production data of many mines have not reconciled geostatistical estimations based on exploration and development drilling. The discrepancies in recovered metals are sometimes as large as 30%. A n
Jan 1, 1995
-
Optimization of Cut-off Grades for Molybdenum and Tungsten Open-pit MinesBy Qiong Wu, Qinghua Gu, Yichuan Lv, Jin Yuan, Caiwu Lu
"The cut-off grade is one of the important parameters of mining production. Different material cut-off grade is directed to different destinations. Based on reasonable and optimal cut-off grade, long
Jan 1, 2017
-
Rapid Open Pit Design System - New System of Open Pit Design.By John McMorran
An open pit mine design system should have the characteristics of being flexible, versatile, and simple. All of these characteristics are necessary for producing a dynamic mine design. In other words,
Jan 1, 1982
-
Continuous Respirable Mine Dust Monitor DevelopmentBy Bruce K. Cantrell, Stephen W. Stein, Kenneth L. Williams, David Hassel, Harvey Patashnick
In June 1992, the Mine Safety and Health Administration (MSHA) published the 'Report of the Coal Mine Respirable Dust Task Group; Review of the Program to Control Respirable Coal Mine Dust in the
Jan 1, 1997
-
Monitoring And Prediction Of Longwall Instability Using Artificial Intelligence Techniques (71cec1e3-30ef-49d7-b2d0-d17a952611b4)By D. W. Park
Artificial intelligence has emerged over the past two decades as an important problem-solving tool including techniques such as expert systems, neural networks, tree classification, fuzzy logic, genet
Jan 1, 1995
-
Design And Construction Of Minghu Power CavernBy C. Y. Kao, Roger Y. Cheng, C. S. Hsieh
The mushroom-shaped Minghu power cavern located in central Taiwan is 21.2 m (W) by 40.5 m (H) by 127.2 m (L) and is designed to house 4 units of power generating-pumping equipment with a total capacit
Jan 1, 1983
-
Construction Of The South Interceptor Montreal, Quebec, CanadaBy Jacques Mongrain, Serge Barbeau, Gary Brierley
The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels
Jan 1, 1987