Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    Leucoxene Study: A Mineral Liberation Analysis (MLA) Investigation

    Determination of mineral composition is of significant importance for the mineral sands industry as this information is required for orebody evaluation, the control of mineral processing plants and th

    Jan 1, 2007

  • SAIMM
    Process Design Of A Regrind Facility At The Leinster Nickel Operations To Improve Concentrator Recovery (730f9c77-ea3f-4530-b6a8-5498efccd480)

    This paper presents the development of a regrind facility design at BHP Billiton's Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis

    Jan 1, 2007

  • SAIMM
    Design Constraints On Trackless Mining Equipment In Low And Extra Low Stope Hard Rock Mining

    By S. C. Thorley, J. R. Menasce

    Trackless mining in low profile (LP) and extra low profile (XLP) platinum stopes has forced equipment designers to re-evaluate their equipment profiles to match the undulating reef. Low profile equipm

    Jan 1, 2004

  • SAIMM
    A Review Of Backfilling At Black Mountain Mine

    By P. J. Kinver

    This paper deals with the development of backfilling methods and systems at the Broken Hill orebody of Black Mountain Mineral Development Company (Pty) Limited, at Aggeneys in the north-western Cape P

    Jan 1, 1988

  • SAIMM
    Xanthate Chemisorption at Copper and Chalcopyrite Surfaces

    By C. A. Young, J. L. Bowden

    "Cyclic voltammetry experiments were conducted on copper and chalcopyrite (CuFeS2) in the absence and presence of ethyl xanthate, and compared to mass-balanced EH–pH diagrams. The results for copper d

    Jan 1, 2016

  • SAIMM
    Design?a strategic issue - Synopsis

    A set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and c

    Jan 1, 2009

  • SAIMM
    Modern Practices Of Post Taphole Operation In Ferro Chrome Production And Its Advantages

    By S. K. Mahata, P. G. Suresh Kumar, B. B. Singh

    Improvement of post tap hole practices is achievable by mechanized handling of melt during the production of Ferro Chrome, resulting in higher recovery of chromium. The paper deals with modern practi

    Jan 1, 2007

  • SAIMM
    The Implementation Of Nos. 16 And 20 Shaft Projects

    By L. A. Jagger

    The world?s second largest producer of platinum, Impala Platinum Ltd, approved two new twin shaft projects at the end of September 2004, Nos. 16 and 20 Shafts. Both shaft projects are stand-alone enti

    Jan 1, 2006

  • SAIMM
    Bias testing of cross-belt samplers

    By G. Lyman

    The cross-belt sampler is a device that is very widely used even though it has not been ratified by the Standards associations. This paper is concerned with the bias testing of two cross-belt sampler

    Jan 1, 2009

  • SAIMM
    The Continuous Improvement Of Mining Operations Via Transformational Leadership

    By Mike Stanley

    This is a case study of an opencast coal mining operation where the physical and financial performance was improved via applying a process of transformational leadership development. [ ]

    Jan 1, 2008

  • SAIMM
    Modelling And Optimization Of Clean Chromite Production From Fine Chromite Tailings By A Combination Of Multigravity Separator And Hydrocyclone ? Synopsis

    By S. Özgen

    In this study, the possibility of beneficiation of chromite tailings in the Uckopru/Fethiye-Turkey region by a combination of hydrocyclone and multigravity separator (MGS) was investigated. The two si

    Jan 1, 2012

  • SAIMM
    Business improvement in the mining and metals industry - Synopsis

    By A. O. Filmer

    In the mining and metals industry, business strategy demands that leaders extract more from any set of capital assets. This improvement is achieved through a combination of continuous improvement and

    Jan 1, 2009

  • SAIMM
    Biosorption of cobalt and copper from hydrometallurgical solutions mediated by Pseudomona spp

    By A. F. Mulaba-Bafubiandi

    Pseudomonas spp was isolated from mine water and tailings samples collected from mining effluents and mine dumps in the Gauteng and Northern provinces of South Africa respectively. Adsorption properti

    Jan 1, 2009

  • SAIMM
    An Integrated Mineral Processing Pilot Plant Practical Programme Designed For Heavy Mineral Sands Beneficiation

    By E. L. Thyse, P. Bepswa

    The Western Cape Mineral Processing Facility (WCMPF) is a collaborative educational initiative between the Department of Process Engineering at the University of Stellenbosch and the Chemical Engineer

    Jan 1, 2007

  • SAIMM
    Increasing the capacity of existing and new exothermic autoclave circuits (cb3a9a5e-99b3-409a-bbbf-2daa43eaba4a)

    By G. M. Dunn

    Pressure leach autoclave circuits are employed in the leaching of ores, concentrates, mattes, alloys and intermediates for the recovery of metals into solution. Once the metals are extracted into solu

    Jan 1, 2009

  • SAIMM
    Evaluation of Iyoni II methanometers (567d462a-c8c7-4da5-8e49-14e8ecc75dfb)

    By J. E. Chilton

    No regular monitoring of methane is required in areas of gassy coal mines outby the mining face. Methane ignitions that have occurred in mine outby areas indicate the need to provide better protectio

    Jan 1, 2003

  • SAIMM
    Analysis of the correlation between bending phenomena and physical-mechanical and petrographic parameters of Carrara marble slabs

    By C. A. Garzonio, A. M. G. Affuso

    The paper describes the analyses and the tests carried out on representative slabs of white Carrara marble which have highlighted the correlation between the micro fabrics and physical and mechanical

    Jan 1, 2003

  • SAIMM
    Ilmenite Smelting At Ticor SA

    By D. Bessinger, H. Kotzé, J. Beukes

    Keywords: Pyrometallurgy, furnace, ilmenite, smelting, Ticor Ticor SA began with a detailed feasibility study in 1995. The Hillendale mine (situated between Richards Bay and Empangeni) and Minera

    Jan 1, 2006

  • SAIMM
    Modelling financial risk in open pit mine projects: implications for strategic decision-making - Synopsis

    By S. A. Abdel Sabour

    Strategic decisions in the mining industry are made under multiple technical and market uncertainties. Therefore, to reach the best possible decision, based on information available, it is necessary t

    Jan 1, 2009

  • SAIMM
    Qualitative And Quantitative Determination Of Inclusions In High-Carbon Steel Alloy (Class B) For Rail Wheel Application By SEM/EDS Analysis - Synopsis

    It is well understood that to develop wagon wheels with higher abrasion resistance, fracture toughness, and fatigue resistance, steels with lower amounts of inclusions need to be used. Clean steels ar

    Jan 1, 2013