    Design of the Lift-in Dam at Olmsted on the Ohio River

    By Dale E. Berner

    A new navigation dam at Olmsted on the Ohio River will be built "in-the-wet" using a lift-in construction method by the Washington Group/Alberici Joint Venture for the U.S. Army Corps of Engineers, Lo

    May 11, 2007

  • DFI
    Hybrid Energy System Installed on Deep Mixing Barge

    By Kento Miyamoto, Kazuki Imamura, Takayuki Tanaka

    "Global economic development has drastically increased energy consumption in various fields, and CO2 emissions, which are a prime cause of global warming, have continued to increase. Therefore, measur

    Jan 1, 2015

  • DFI
    Experimental Study on the Bending Failure Properties of Cement-Treated Soil

    By Takeru Fukaya, Tsutomu Namikawa

    "The bending tensile stress occurs in the ground improvements when external forces are applied to the column and wall shaped ground improvements. Therefore, in the design of the column and wall shaped

    Jan 1, 2015

  • DFI
    Hammer-Grout Piles At The Bronx-Whitestone Bridge

    By Ameir Altaee

    Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho

    Jan 1, 2010

  • DFI
    Micropiles In Soft Florida Limestone

    By James D. Hussin

    The Florida limestone is a relatively soft rock which presents many challenges to engineers when designing deep foundations. One alternative is micropiles which have grown significantly from their ear

    Jan 1, 2003

  • DFI
    Numerical Study on the Behavior of Inclined Micropile (60b065bc-a615-421d-afa1-47c19339c8cb)

    By Sepideh Damavandinejad Monfared

    "In recognition of the practicality of using inclined micropiles as elements for foundation support to resist static and seismic loading conditions, specifically in retrofitting projects, this study p

    Jan 1, 2017

  • DFI
    Skin Friction Of Excavated Piles In Weathered Granite - Synopsis

    By K. K. S. Ho

    In Hong Kong the design of excavated piles in weathered granite has conventionally been based on a rule-of-thumb which relates the allowable base bearing capacity to the SPT N value, with no allowance

    Jan 1, 1996

  • DFI
    Load Tests Of Bored Piles In Weathered Bedrock

    By James C. Scott

    Compression and tension load testing were performed on bored concrete piles installed to depths of 18 to 34 meters below excavation levels for a large mixed-use development in Kuala Lumpur, Malaysia.

    Jan 1, 2007

  • DFI
    A Coupled FE-BE Formulation For The Prediction Of Vibrations Due To Vibratory And Impact Pile Driving

    By H. R. Masoumi

    This paper presents a numerical model for the prediction of free field vibrations due to vibratory and impact driving. As the focus is on the response in the far field, where deformations are relative

    Jan 1, 2006

  • DFI
    Comparison of 2D and 3D Anchor Analysis Methodologies

    By Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu

    The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on

    Jan 1, 2019

  • DFI
    Design And Construction Of The Rion Antirion Bridge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2013

  • DFI
    Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern Vietnam

    By Masakazu Takano, Koji Suzuki, Naotoshi Shinkawa

    "Cement deep mixing (CDM) method successfully applied to a marine construction project in northern Vietnam is reported. The method is classified as wet method, in which cement slurry is injected into

    Jan 1, 2015

  • DFI
    High Capacity Minicaissons In NYC

    By Lawrence F. Johnsen

    Six case histories are presented in which tall, slender high rises are supported on high capacity minicaissons. The recent development of a high strength rebar cage has resulted in compressive loads o

    Jan 1, 2007

  • DFI
    The Secret to Dewatering

    By Gregory M. Landry

    "There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al

    Jan 1, 2017

  • DFI
    New Double-Walled Pile Technology for Noise Attenuation

    By Julie Hampden, Tim Dardis, Per Reinhall

    "Noise from impact pile driving can harm fish, marine mammals and other sensitive wildlife over large areas. Marine pile driving is highly regulated, and regulators require sound levels to be below ce

    Jan 1, 2017

  • DFI
    Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?

    By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina

    Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no

  • DFI
    Design & Installation of Offshore Driven Piles – A Gulf of Thailand Regional Perspective

    By Kaushik Mukherjee

    "Malaysian offshore and surrounding region are favorable to the installation of driven piles. During the design phase, pile driveability analysis plays a major role in pile make-up design to suit and

    Jan 1, 2015

  • DFI
    Energy Geostructures: Analysis from Research and Systems Installed Around the World

    By Tony Amis, Marco Barla, Alice Di Donna

    "Energy geostructures are becoming an increasingly popular solution around the world for Developers looking to reduce CO2 and system running costs. Energy geostructures are geotechnical structures tha

    Jan 1, 2017

  • DFI
    Replacement Bored Piles for the Houphouet-Boigny Bridge, Cote D'ivoire

    By Adrian Mercer, Ashkan Ameri

    Due to general degradation, increased traffic levels, and historical ground movement, this road and rail bridge which provides an essential link between the interior of the country and the Port of Abi

    Sep 8, 2021

  • DFI
    Numerical Analysis Of Mono And Group Suction Piles Under Lateral Loadings In Layered Deposits

    By Juhyung Lee

    Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silty