Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Heavy mineral by-products from Athabasca tar sands

    By Lloyd W. Trevoy

    Syncrude Canada Limited is presently studying commercial production of heavy minerals from plant tailings of the openpit A lhabasca tar sands operation. When tar sands are processed and upgraded to sy

    Jan 1, 1984

  • CIM
    The ACACIA Reactor Improving Gravity Recovery!

    By Ish Grewal

    The ACACIA Reactor - Introduction What is it? The Acacia Reactor is a fluidized bed high intensity cyanide leaching system. Purpose for its existence? The Acacia Reactor was developed to treat hig

    May 1, 2002

  • CIM
    Terrestrial Heat Flow in the St. Lawrence Lowland of Quebec_

    By T H. Clark, R P. Doig, V. A. Saull, R B. Butler

    Terrestrial heat flow has been determined for four boreholes in the Montreal area. The mean value of the results (uncorrected for glacial effects) is 0.790 ± 0.053 x 10-6 cal/ cm2/sec (95 per cent con

    Jan 1, 1962

  • CIM
    Framework for optimizing components in an oilwell cement slurry design

    By D. Getzlaf

    "Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s

    Jan 1, 2004

  • CIM
    Improving Ground Support Design by Historical Ground Fall Analysis at HBMS

    By X. (Mike) Yao

    Rock mechanics engineers must provide ground support designs that ensure a safe underground working environment. Unexpected falls of ground are unacceptable while ground support systems must be adequa

    May 1, 2002

  • CIM
    Operational Data and Maintenance Reliability

    By Justin S. Johnsen

    As OEM sensors and interfaces have grown in number, the available data from equipment in the mining environment has continued to multiply. This equates to an increased visibility of operating performa

    Nov 1, 2011

  • CIM
    Noranda's Bell Allard pastefill plant: commissioning and beyond

    By Maureen McGuiness

    "The pastefill circuit at the Bell Allard Mine in Matagami, Quebec started up in August 1999. The surface pastefill plant produces a cemented paste which is sent underground by gravity through a verti

    Jan 1, 2002

  • CIM
    Complex Networks on a Rock Joint

    By H. O. Ghaffari

    A complex network approach on a rough fracture is developed. In this manner, some hidden metric spaces (similarity measurements) between apertures profiles are set up and a general evolutionary networ

    May 1, 2009

  • CIM
    Haile Gold Mine Metallurgy and Flowsheet Review

    By P. Tittes, M. Deal, M. Spicher, S. McDaniel, J. Wickens

    "Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through se

    Jan 1, 2013

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Case Studies with the Falcon Concentrator

    By G. Naud, J. Robitaille, M. Buonvino, A. Veltmeyer, A. R. Laplante

    "A B6 Falcon concentrator was tested on several systems: a synthetic magnetite-silica ore, a massive sulphide gold-copper ore, a fine gold-pyrite-silica flotation tail, and a high grade gold ore in a

    Jan 1, 1993

  • CIM
    Seismic Risk Management at LaRonde Mine

    By Frederic M. Langevin

    ?? Introduction ?? LaRonde ?? History of Seismicity and Rockbursting ?? November 27th 2002 Rockburst ?? April 1st 2006 Rockburst ?? December 11th 2006 & January 11th 2007 Rockbursts ?? Seismic R

    Feb 1, 2008

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • CIM
    Effects of the Type of Water on the Selective Flotation of Pyrochlore from Niobec

    By E. Esponosa-Gomez, J. A. Finch, A. R. Laplante

    "Water quality plays an important role in oxide flotation. The effects on selective flotation of fine (1-16 um) pyrochlore of two types of water used at the Niobec concentrator, potable and plant recy

    Jan 1, 1986

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and Design

    By Fidelis T. Suorineni

    Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories

    May 1, 2011

  • CIM
    Chapter 7. The Joint Venture Relation

    By Karl J. C. Harries

    "7.1. INTRODUCTIONThis chapter addresses the joint venture and examines a number of general concepts of the joint venture relationship. Chapter 8 looks at some specific concepts related to the provisi

    Jan 1, 2003