Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Bucket Wheel Excavators for Latrobe Valley

    The paper describes the development leading to the bucket wheel excavator systems now used in the Latrobe Valley and refers in particular to the new S.E.C.V. dredgers Nos. 14 and 15 which will be

    Jan 1, 1982

  • AUSIMM
    The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

    By Matsuo T, Uga Y

    The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec

    Jan 1, 1987

  • AUSIMM
    From Databases to Visualisation - Data Transfer Standards and Data Structures for 3D Geological Modelling

    By Horowitz F. G, Lamb P

    As mining operations become larger and more complex, larger volumes of geological, geophysical, and production data must be manipulated and interpreted on a day-to-day basis. Because of the large vo

    Jan 1, 1995

  • AUSIMM
    Automating Hoist Rope Inspection Processes

    By B Delaney

    For worker safety, mining companies are required to stop production and inspect hoist ropes. Visual inspection is generally done daily and EM inspection occurs every three to four months. During visua

    Jan 1, 2005

  • AUSIMM
    Catacylsmic Emission Controlled by Organic Residues During Mineralisation of Upper Devonian Extinction Envrironments

    Cataclysmic or flood-like release of gas-charged brines, hydrocarbons and slurries accompanied widespread mineralisation of Upper Devonian environments. These are well represented in the Canning and B

    Jan 1, 1990

  • AUSIMM
    Winder Drum Design

    Introduction The mine winder is an essential element in the mining of ore in deep level mines and therefore requires a high degree of reliability to avoid interruption of production. Failure of any

    Jan 1, 1987

  • AUSIMM
    Limits Excavation at Mt Whaleback

    Within the Mt Whaleback open cut mine the integrity of the final pit wall is achieved through careful rock slope design, use of rock reinforecement technology where marginal stability exists and u

    Jan 1, 1986

  • AUSIMM
    The Role of Strategic Planning During the Establishment of Syferfontein Colliery

    Syferfontein Colliery, part of the Sasol group of companies which specialises in the field of petro-chemical production, was established in 1990. The mine is situated about 150 km east of Johannesburg

    Jan 1, 1992

  • AUSIMM
    An Alternative to the Barrovian Interpretation? Evidence from Stratiform Ores

    Recent work has shown that, in at least some instances of regional metamorphism, metamorphic diffusion has been restricted to such relatively minute distances (of the order of 1.0 mm and much less), t

    Jan 1, 1982

  • AUSIMM
    Blind Shaft Drilling of the Agnew Mine No. 1 Ventilation Shaft

    The Agnew Mine No. 1 Ventilation Shaft is the largest diameter shaft blind drilled in a hard rock mining environment. The selection of this method of shaft development was based on achieving an a

    Jan 1, 1983

  • AUSIMM
    Sustainable Use of Bauxite Residue Sand (Red Sand) in Concrete

    By H Nikraz, E Jamieson, D Cooling

    The use of red sand as fine aggregate in concrete manufacture has been investigated as well as the use of fly ash as a cement replacement. The experimental work consisted of casting various concrete m

    Jan 1, 2006

  • AUSIMM
    Sampling of the Perseverance Nickel Deposit

    By Allchurch P. D

    At Perseverance a reserve of 45 million tonnes at 2% Ni was indicated by drilling. Holes were drilled in trellis pattern on section lines 61m apart to assess shallow mineralization. To explore at

    Jan 1, 1976

  • AUSIMM
    Computer and Open Pit Mining : Out of the Iron Age

    By Neto J. A N

    Usually there are organisational interfaces between each stage - companies or departments. Each organisation will have different ideas about "optimum" operation. These ideas will be driven by how th

    Jan 1, 1991

  • AUSIMM
    Mining and Treament of Gold Bearing Clayey Ores at Golden Ridges, new Guinea

    The extraction of the values from gold bearing clay or clayey ores has always presented difficulties. A description of the successful operation of a mill working on material of this nature is here giv

    Jan 1, 1951

  • AUSIMM
    Impact of Blast Fragmentation on Crushing and Screening Operations in Quarrying

    By McKenzie C, Michaux S

    Modern quarrying operations focus attention on blasting operations as a critical component in the overall cost-effectiveness of quarrying. Generally, optimisation of blasting has been linked to the

    Jan 1, 1995

  • AUSIMM
    Adopting Quality Systems to Train Blast Crews and Control the Use of Explosives at Gunpowder Copper

    While, in the past, a great deal of attention has been focussed on technical issues and the performance of explosives in rock, the explosive user, an essential link in the chain, has often been negl

    Jan 1, 1995

  • AUSIMM
    Progress in Aluminum Therapy

    The prevention of silicosis by metallic aluminium has been reported by Denny, Robson, and Irwin in two papers. The first was published in 1937; the second, in 1939. The results definitely established

    Jan 1, 1944

  • AUSIMM
    Recent Developments in Strata Bolting in National Coal Board Mines in the United Kingdom

    Strata bolting/dowelling reinforcement techniques are being reintroduced into the mines of the National Coal Board. There are strong reasons for the selection of the full hole anchorage principle o

    Jan 1, 1971

  • AUSIMM
    Dewatering and Depressurization of a Multi-Aquifer Groundwater System at Loy Yang Open Cut, Victoria, Australia

    By Gibson I, Somerville J

    Three main confined aquifers occur in interseam sediments beneath the planned excavation for the Loy Yang Brown Coal Open Cut. Sub-artesian groundwater pressures occur in all aquifers necessitating

    Jan 1, 1988

  • AUSIMM
    Ulan Highwall Project

    HIGHWALL MINING - DECISION TO MINEUlan had completed operations in the first Open Cut area due to high stripping ratios and the presence of geological features which destroyed a significant portion of

    Jan 1, 1998