Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West Queensland

    By K George

    The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The

    Sep 20, 2017

  • AUSIMM
    On the Use of Mechanistic Blast-Outcome Measurement and Modelling for Optimisation of Explosive Selection in Underground Mining

    By A S. Lund

    Optimisation of the underground mining production process benefits from informed decision making during the process of explosive rock fragmentation. Selection of the most appropriate bulk explosive pr

    Jan 1, 2001

  • AUSIMM
    A HPGR pseudo-dynamic model approach integrated with real-time information for pressing iron ore concentrates in industrial-scale

    By T M. Campos, H A. Petit, L M. Tavares, R Olympio

    Much practical experience has been gathered in the last 30 years of application of high-pressure grinding rolls (HPGR) integrated with ball milling in size reduction of fine iron ore concentrates. The

    Aug 24, 2022

  • AUSIMM
    KEYNOTE: Using Metallurgical Data to Drive Continuous Improvement

    By R Dunne

    "Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi

    Oct 10, 2016

  • AUSIMM
    Real-time Methane Detection – Modern Digital Laser Spectroscopy for Hostile Environments

    By D Chalmers, C C. Harb

    The detection and control of gas levels in mining is a continuing challenge for the industry. Standard detectors have many problems that could be overcome with laser based spectroscopic instruments, b

    Aug 31, 2015

  • AUSIMM
    Structuring Meaningful Mentoring

    By J Coombes

    Within the mining industry there is a growing trend of placing inexperienced technical people into positions of responsibility beyond their readiness. Their responsibilities often include providing th

    Nov 20, 2012

  • AUSIMM
    Preparation of Mine Fill from Process Plant Tailings

    This paper reports the advances made during the development of underground mine fill technology from circa 1960 to the present and, in particular, indicates where increased input from process plant me

    Jan 1, 2006

  • AUSIMM
    Assigning Value to a Drill and Blast Wall Control Program Through Reduction in the Risk Profile

    By S B. Sheldon

    Wall control programs tend to be expensive and consequently require financial justification in order to get approval for the expenditure required. The difficulty faced in getting this approval is that

    Nov 8, 2011

  • AUSIMM
    Fully Integrated Distributed Sensor System for Self-Awareness

    By M Ahler

    Future developments in the mining sector will be driven by the need to increase safety, ecological sustainability and efficiency. Autonomous systems represent a huge step towards achieving these goals

    Nov 22, 2011

  • AUSIMM
    Re-defining Compliance Planning through data integration and ultra-short-term scheduling

    By C Fong

    Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i

    Jun 22, 2022

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Technological Characterisation of West African Iron Ores in Order to Predict their Performance in the Beneficiation Process

    By L Dubron

    This study details a mineralogical and textural characterisation of West African iron ores with an emphasis on their behaviour during mineral processing. By means of both qualitative and quantitative

    Jul 11, 2011

  • AUSIMM
    Evaluation of Heavy Medium Cyclone Performance at the Hamersley Iron Mount Tom Price Concentrator

    By Gomm SA

    The Mount Tom Price Concentrator, which contains a heavy medium cyclone plant for beneficiation of the -6+0.5mm fraction of low grade iron ore, is described. Testwork was carried out on an opportun

    Jan 1, 1987

  • AUSIMM
    Underground Quarrying - A Challenge for the Next Millennium

    By M A. Ohsberg, A C. Robertson

    Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and

    Jan 1, 1999

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986

  • AUSIMM
    Recovery of Gold from Refractory Ores and Concentrates Using the Sirosmelt Reactor

    By Floyd J. M

    The recovery of gold from refractory ores and concentrates can be achieved in a number of ways using roasting and leaching procedures. The Sirosmelt system introduces a new approach to the recover

    Jan 1, 1987

  • AUSIMM
    Process design and commissioning of the Goedehoop coal processing plant

    By Swann CA

    In order to meet export sales requirements from 1983 onwards, Amcoal developed a new underground mine in the Witbank area of the Transvaal. The mine was required to produce 5 million tons of run o

    Jan 1, 1986

  • AUSIMM
    Coals to Newcastle the PWCS Ship Unloading System

    The design and construction of a 2.5 million tonne per annum ship unloading system at the PWCS export coal terminal in Newcastle, NSW, has further increased the flexibility and sophistication of A

    Jan 1, 1987