Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Characterisation of pore pressure in tailings dams and the implications for design

    By D Johns, L Murray

    This paper discusses pore pressures in the embankments of tailings dams by comparing real world data with common design assumptions. Assessment of pore pressures has implications on material behaviour

    Jul 23, 2018

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Lump Ore Properties and Their Impact on Value-in-use in Ironmaking

    By T Honeyands, L Jelenich

    We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation

    Jul 13, 2015

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

    By H Kurth

    Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine

    Mar 22, 2022

  • AUSIMM
    Unmanned aerial vehicle observation technology of coal mininginduced surface movement and fissures

    By J Zhang, B Wei, T Zhao, K Wang

    Understanding mining-induced surface movement and fissures is critical for environmental protection and geological prevention. In this study, image recognition algorithms, satellite remote sensing and

    Sep 1, 2024

  • AUSIMM
    Phreatic uncertainty in the unsaturated zone of tailings storage facilities: an examination of two Australian case studies

    By E J. Coyle, L A. Millington

    Tailings storage facilities are geotechnically complicated structures that develop heterogeneous strength profiles and varied porewater conditions. The monitoring of porewater pressures is one of the

    Jul 1, 2021

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    Smoothed Particle Hydrodynamics Modelling of Blast-induced Fracture Processes in Naturally Jointed Rock Medium

    By D Deb, R Pramanik

    This paper presents a generalised methodology in smoothed particle hydrodynamics (SPH) framework to analyse dynamic failure process of rock mass having natural joint under blast-induced stress wave an

    Aug 24, 2015

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011