Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Newly Developed Shield Tunnelling Machine for Intensive Curve

    By Yoshii Y

    Many kinds of shield machines are being driven in the soft ground of Tokyo metropolitan area. Tunnel alignments for underground power transmission lines are generally planned to pass under public r

    Jan 1, 1987

  • AUSIMM
    Improving the Energy Efficiency of a Rotary Kiln

    The Rotary Kiln at TeKumi was commissioned in February 2002. The process involves burning limestone at 1000 - 11 000¦C to produce a burnt lime (CaO) product. This paper describes the design and instal

    Jan 1, 2003

  • AUSIMM
    A guide to reporting Mineral Resource exclusive of Mineral Reserve

    By H Arvidson, V Chamberlain, R Marinho, B Parsons, T Rowl, M Noppé, M Mattera

    With the introduction of CRIRSCO (2019) based mineral asset disclosure, Regulation S-K part 1300, 2019 (S-K1300) by the United States (US) Securities and Exchange Commission (SEC), applicable to compa

    May 24, 2023

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Mechanism analysis and particle flow simulation of water-sand inrush in thin bedrock working face

    By S Li, Y Lei, X Wu, C Ma, W Q. Zhang

    The failure of roof of thin bedrock working face under loose aquifer in a coalmine can lead to water-sand inrush disaster. Based on the accident of water-sand inrush in 30108 working face of a mine in

    Nov 29, 2022

  • AUSIMM
    A geotechnical risk assessment tool for underground mine drives

    By H Esterhuizen, W Hartman

    Rockfalls or significant deterioration of mine openings can have significant safety and financial impacts for mining operations. The failure of drives in underground mines sometimes highlight deficien

    Nov 30, 2018

  • AUSIMM
    A review of dynamic energy-absorbing cable bolts

    By P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag

    High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s

    Nov 29, 2022

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Geometallurgy Data Management – A Significant Consideration

    By V Liebezeit

    Data management is a significant, but perhaps unrecognised, consideration for any organisation embarking on a geometallurgy program. While resource geologists are accustomed to dealing with thousands

    Sep 5, 2011

  • AUSIMM
    Lithium ore processing – an overview of the current and new processes

    By N Setoudeh, A Nosrati, N J. Welham

    The current surge of interest in lithium (Li) is due to the anticipated demand for electric vehicles and small scale power storage. Brine deposits contain most of the global Li resource, however hard

    Sep 11, 2017

  • AUSIMM
    Investigation of silica removal by reverse flotation to improve quality of mixture concentrates produced through spiral gravity separation and Slon-VPHGMS process

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    This research was done to reduce silica from mixed hematite concentrate of Barfkar Iron Ore Sample and increase Fe grade using reverse flotation method (Depressing Hematite and floating Silica). The u

    Aug 24, 2022

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    Mine reconciliation standardisation – R Factor Series

    By R Hargreaves, T Elkington, W J. Shaw, G W. Booth

    Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions

    Mar 22, 2022

  • AUSIMM
    On equitable distribution of mining wealth and the social licence to operate imperative – an African case study

    By S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield

    The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect

    Nov 21, 2018

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    Increasing production systems availability through remote support discipline

    By A Innis, A Bye, B McCarthy, S Glover

    Technology adoption in the mining industry has been steadily increasing over the past decade, driven by the need to improve operational efficiency, safety, sustainability, and profitability. As mining

    Sep 1, 2024

  • AUSIMM
    Diavik Diamond Mine north country rock pile – an example of integrated mine planning for successful progressive reclamation

    By G Stephenson, G MacDonald, A Yeomans, S Sinclair, V Knott

    Rio Tinto has actively committed to progressive reclamation, concurrent with commercial operations, at its Diavik Diamond Mine. The most significant piece of progressive reclamation undertaken at Diav

    Aug 2, 2023