Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
On the Influence of Fundamental Detonics on Blasting PracticeBy A Minchinton
With blasting, all far-field phenomena including, but not limited to, stress wave propagation, fracture, vibration and muck pile formation are intrinsically and irrevocably dependent upon near-field p
Aug 24, 2015
-
PC-BC: A Block Cave Design and Draw Control SystemThis paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the
Jan 1, 2000
-
Using Process Safety Management to Manage Risk in Mineral and Metals FacilitiesThis paper explores the use of a Process Safety Management (PSM) system to manage risk in the mineral processing and metallurgical refining industries. Important elements of a PSM system are described
Jan 1, 2003
-
Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan
Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho
Mar 15, 2021
-
Evaluation of sustainability of copper production value chain from ore to metal using advanced simulationBy A Remes, A Dennis, M Talikka, T Kotiranta, S Horn
A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan
Jul 25, 2018
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level caveBy P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018
-
The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air CoolerThe 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral
Jan 1, 2002
-
The HydroFloat Separator ù A New Technology for Recovering Coarse Phosphate SandsBy T C. Westerfield, G, M J. Mankosa
An innovative separator known as the HydroFloat cell has been developed specifically for the upgrading of coarse particles that are difficult to recover using conventional flotation cells. The novel c
Jan 1, 2005
-
Transforming dust control – lessons from tunnellingBy A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Receiving Environment Monitoring Programs - Making the Most out of Biological Indicators and Direct Toxicity Assessments for Monitoring of Aquatic EcosystemsBy L Thorburn
In 2009, the Queensland Government developed a series of amendments to environmental authorities (EAs) for mines throughout the Fitzroy Basin in response to studies that assessed the cumulative impact
Nov 26, 2013
-
Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley CoalminesBy M L. Cramer, N P. Wines
"On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a
Jun 28, 2016
-
Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining LandformBy G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu
An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which
Jul 10, 2012
-
Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technologyBy P Jere
Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons
Mar 29, 2023
-
Carbon kiln selection, operation and maintenanceBy J K. Claflin, S R. La Brooy, A M. Claflin
Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad
Aug 29, 2018
-
Outlook for Oil Demand in the Pacific Basin Region (9b865cd3-308f-4c90-b186-680dbd93823b)Large GDP increases in the Pacific Rim countries have been accompanied by similarly large increases in demand for oil products. In the case of residual fuels, this demand has been tempered by the subs
Jan 1, 1990
-
Post Closure Management of the Mt Leyshon Gold Mine - Water the IntegratorBy T Baumgartl, D Mulligan, R Haymont
Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the
Jan 1, 2006
-
Optimising Flow in the Mining Value ChainBy A Dunne, R Kruger, H Coleman, P G. Laurens
External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc
Jul 13, 2015
-
Carrapateena Crusher Station One – Optimisation and excavationBy A Mooney, G Balog, P Burns, R Brooks
This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as
Mar 15, 2021
-
Technology and Changes in Mines RescueAs the mining industry looks to new technologies for a safe work environment and increased production rates, so should emergency response teams when dealing with organisational incidents. Implementati
Jan 1, 2004
-
Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, AustraliaBy A R. McKinnon
The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner
Sep 20, 2017