Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Use of Anchored Gaskets in Segmented Bored TunnelsBy A Roseman, T Gruber
Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation
Sep 17, 2014
-
Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing IndustryThe An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i
Jan 1, 2009
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022
-
The Structural and Tectonic Development of the Frieda River Mineral District, NW Papua New GuineaBy Hill KC, Foster DA
Methods for ore reserve estimation are classified. The amount of information needed to asses ore reserves is analysed. Reference is made to gold sampling. Consideration is given to nugget effects a
Jan 1, 1997
-
Increasing Production Control Through Reliable Geological Predictive TechniquesBy English W, Poppit I
COALEX Pry Limited operates two underground steaming coal mines on the western edge of the Sydney Basin near Lithgow, New South Wales. Baal Bone Colliery uses longwall technology for an output of over
Jan 1, 1991
-
Delay Variability: Effect and Design to Minimise these EffectsThe statistical nature of the variability in detonation times of pyrotechnic delays is discussed, and how to evaluate the probability of required detonation intervals is shown. Some methods (analytica
Jan 1, 1992
-
The Mt Kasi high sulphidation Au system, FijiBy Taylor GP
Mt Kasi in Fiji is a high sulphidation style of gold deposit exposed at a high crustal level. Individual alteration centres are localised at the intersection of cross structures within a through-going
Jan 1, 1994
-
The Composition of the Peko Copper Orebody, Tennant CreekThe Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.
Jan 1, 1955
-
Sensitivity Analysis and the Mine Development DecisionTraditionally, the development of a mineral resource project goes through a fairly set pattern of decisions from what commodities to search for; where to look; how to locate; what are the reserves
Jan 1, 1983
-
Stope-Survey Practice at Mount LyellBy Coulter L. J
THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved
Jan 1, 1915
-
Gippsland Basin South Platform: Unprospective or Underexplored?I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r
Jan 1, 1992
-
Shifting the comminution workload from the primary ball mill to TowerMill circuitBy H Ishikawa, R Halomoan, S Palaniandy
The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,
Aug 29, 2018
-
Methods and Approach to Exploration for Hard Rock and Alluvial Gold in IndonesiaBy Dods G. H, Hewitt W. V
Ashton Mining Limited is currently one of the active companies undertaking gold exploration in Indonesia. Presently 7 Contract of Work areas are being explored for hard rock and alluvial gold. Hard
Jan 1, 1991
-
Terranes, Tectonics and the Pacific RimThe movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th
Jan 1, 1990
-
Practical Implicit Geological ModellingBy H J. Ross, R K. Beatson, T J, W R. Fright
Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be
Jan 1, 2003
-
Particle Size Distribution Effects that Should be Considered when Performing Flotation Geometallurgical TestingBy K C. Runge, E Tabosa, A Jankovic
Flotation recovery in geometallurgical modelling is usually predicted based on relationships developed from batch flotation testing of different ore types. These batch flotation tests are usually perf
Sep 29, 2013
-
Potential for Future Developments Outside of Existing Fields in the Gippsland BasinBy MacLean L
In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate
Jan 1, 1982
-
Carburisation and melting of hot compacted iron in a coke bedBy M Kim, J Park, I-K Suh, E Kim, J Lee
One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp
Aug 21, 2024
-
Paper No. 162. The Refining of Base Bullion at Port Pirie, and Treatment of By-Products.The article, as written, represents a short account of the treatment of the base bullion from the Broken Hill ores, as carried on at Port Pirie, for the recovery of lead, silver, and gold, and for the
Jan 1, 1907
-
The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South LimitedIn this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan
Jan 1, 1935