A More Holistic View of Mill Liner ManagementBy N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor
The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin
Oct 29, 2012
-
Behavior of Minor Elements in the Roasting of Zinc ConcentrateBy Kato T, Eguchi M, Seino T, Itagaki K, Kimura T, Muto T, Shimizu T, Kobayashi T
Behaviour of minor elements in the dust collecting system connected with fluidized bed roaster for zinc concentrate was investigated by use of the bench scale experimental appara- tus. The dust col
Jan 1, 1980
-
Inrushes and SubsidenceBy S Harvey
An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu
Jan 1, 1998
-
Application of enterprise optimisation considering ultra high intensity blastingBy J Pan
This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl
Nov 21, 2018
-
Flotation Optimisation Studies of the Perilya Broken Hill Lead CircuitBy B Kilgariff
Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at
Jan 1, 2005
-
Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek ProjectBy J Edman, RáBeamish, G Cambourn, B Beamish
Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola
Jul 1, 2013
-
Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to productionBy H Wright
Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp
Mar 29, 2023
-
Algebraic optimisation of excavation alignment using the stress tensorBy P B. Hills
A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T
Nov 29, 2022
-
Platinum Mining and Sustainability - Understanding the Environmental Costs of Future TechnologiesBy G M. Mudd
The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain
Jan 1, 2009
-
Contract Mining Lihir Gold MineLihir Gold Mine is situated in a dormant volcanic caldera on a small island off PNG. Not æextinctÆ but dormant. Current ground temperatures are up to 150 degrees Celsius with active geysers in the wor
Jan 1, 1999
-
Project Controls for Large Mining Projects - The Client's PerspectiveControl of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf
Jan 1, 1993
-
TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment ManufactureBy J M. Shekiro
In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most
Oct 5, 2011
-
Investigating industrial feasibility of utilising magnetising roasting for goethite oreBy N Esmaeili, M Saghaeian, L Hosseini, V Sheikhzadeh, R Hejazi
Ore roasting has long been used for beneficiation and assay upgrading of different ores. In this process, which is mainly used for sulfide ores, the ore is heated to a high temperature. More specifica
Aug 24, 2022
-
The CSA ventilation upgrade – geotechnical challenges and learningsBy T M. Brettell, D Sidea
The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre
Oct 16, 2017
-
Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai MineBy D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah
Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected
Aug 24, 2015
-
Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust ControlBy H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim
An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi
Aug 24, 2015
-
Investigation of silica reduction effects on HPGR operation condition in case of iron ore increasing specific surface areaBy M Saghaeian, M Zare, V Sheikhzadeh, R Hejazi
High-Pressure Grinding Roll (HPGR) is one of the efficient methods for increasing the specific surface area (SSA) of iron ore concentrate for pellet feed production. HPGR grinding mechanism implies th
Aug 24, 2022
-
Didipio - Learning the Lessons, Adapting and Getting Ready for ProductionBy R Redden
"The Didipio Gold-Copper project in the Philippines has been a well-defined reasonably high gold grade porphyry for almost two decades. OceanaGold are now bringing the project into production in late
May 24, 2012
-
Adaptation of an Open Pit Optimiser for Underground Strategic PlanningBy M Bloss, B Roberts
BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so
Nov 24, 2014
-
Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn DepositBy B Armstrong
The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value
Sep 5, 2011