Search Documents

  • DFI
    Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits

    By Franklin M. Grynkewicz

    As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc

    Jan 1, 1992

  • NIOSH
    Three-dimensional time-lapse velocity tomography of an underground longwall panel

    By Kray Luxbacher, Mario Karfakis, Erik Westman, Peter Swanson

    Three-dimensional velocity tomograms were generated to image the stress redistribution around an underground coal longwall panel to produce a better understanding of the mechanisms that lead to ground

  • CIM
    A Protocol for Conducting Plant Trials Testing Grinding Media to Determine Recovery Improvements: The Ernest Henry Mine Plant Trial

    By Allen Chung, John Twomey, Christopher J. Greet

    "It is widely accepted that the type of grinding media has an impact on the grinding chemistry and subsequent flotation behaviour of the sulphide minerals being separated. There are countless laborato

    Jan 1, 2011

  • AUSIMM
    An Investigation of Factors Affecting the Long-term Reliability of Extraction Level Pillars in Deep Block and Panel Caves

    By P Duplancic and C R Lilley, R Hudson, D Beck

    For deep block and panel caving mines, undercut or extraction level instability can have as much impact on overall recovery as underbreak or the premature ingress of waste. If the area of the mine aff

    May 9, 2016

  • AIME
    Drilling – Equipment, Methods and Materials - Laboratory Studies of Formation Damage in Sands Con...

    By A. E. Anderson, H. J. Hilll

    Laboratory data for 155 field muds and 77 .shales have been used to develop correlations to estimate the net streaming potential component of the SP. Analysis of these data and comparison with field t

  • CIM
    Hydromet Piloting: What the Mineral Processor can expect

    By Ronald Molnar

    "High demand for metals is driving the exploitation of lower grade and more complex orebodies. These projects are often the initiatives of junior mining companies with limited financial resources. In

    Jan 1, 2006

  • SME
    New Developments In Flow And Pipe Management Capabilities Through New Velocity Profile Measurement And Pipe Wall Wear Monitoring Instrumentation - Preprint 09-006

    New developments in the non-invasive and real-time measurement of the velocity profile of slurry flow in horizontal pipes will be described. This information can be used to determine the approach and

    Jan 1, 2009

  • AUSIMM
    Automation for efficient separation with the Outotec SLon® vertically pulsating high gradient magnetic separator

    By I Sherrell, R Jain, P Jansson

    With the depleting iron reserves and difficult market conditions, precision in separation efficiency is of utmost importance. Classical local control options are predominant in the industry, but their

    Jul 24, 2017

  • AUSIMM
    Failure of Aluminum to Prevent Experimental Silicosis

    By King E. J

    Department of Pathology, British Post-graduate Medical School, London:The experiments here recorded were devised and carried -out during the last two years in an attempt to corroborate the important w

    Jan 1, 1945

  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • SME
    Design and Startup of Cortez Gold Mine’s Pipeline Mill

    By Randy N. Powell

    The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas

    Jan 1, 1999

  • SME-ICGCM
    Longwall Shield Recovery Using Mobile Roof Supports (64264c53-830d-4e84-b91e-78532103884a)

    By Frank Chase

    Longwall mining has gained the reputation as being the safest extraction method in underground coal mines. However, one of the most difficult tasks associated with longwall mining is moving the face

    Jan 1, 2007

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • SAIMM
    Theory And Application Of Magnesia Ramming Material In Ferroalloy Refining Furnaces

    By Y. Jin

    Magnesia ramming materials have been widely used in China instead of magnesia bricks as furnace lining materials of ferroalloy refining furnace. The paper introduces the development of the ramming mat

    Jan 1, 2004

  • AUSIMM
    The Mineral Potential of the Hauraki Goldfield

    By R J. Merchant

    The Hauraki goldfield is located east of Auckland in the North Island of New Zealand. It includes Great Barrier Island, the Coromandel Peninsula and the Coromandel and Kaimai Ranges as far south as th

    Jan 1, 1984

  • CIM
    Enhancement of Flow Dynamics of Existing Flotation Cells

    By Timo Niitti, Antti Rinne, Janne Turunen, Sami Grönstrand

    "This paper describes novel methods to enhance the flow dynamics of a mechanical flotation cell that can be applied to an existing installation. There are several reasons to alter the flow dynamics. T

    Jan 1, 2006

  • CIM
    Propriétés des roches et réponse du massif lors du minage sous contrainte modérée à élevée Partie A - Historique des travaux

    By Denis Labrie

    Le minage en profondeur sous contrainte modérée à élevée présente de nombreux défis aux opérateurs et aux ingénieurs de mine notamment au niveau du contrôle de terrain et de l?environnement minier sou

    May 1, 2002

  • SME
    Design Evaluations for the San Vicente Pipeline Tunnel

    By Zach Ahinga, Mike McRae, Dave Hopkins, Steve Klein

    The San Vicente Pipeline project involves the construction of an 8-1/2 foot diameter water pipeline in an 11 mile long tunnel in San Diego, California. The tunnel will be excavated in extremely variab

    Jan 1, 2005

  • CIM
    High Strength Aerated Cement Bulkheads for Target Gold Mine, South Africa

    By D. J. R. Ras

    A sub-level open stoping method is being used to mine the massive deposits at TARGET Gold Mine which uses cemented tailings to backfill the stopes. This requires the construction of bulkheads to conta

    May 1, 2007

  • AIME
    Part II – February 1968 - Papers - The Silver-Rich Solid Solutions in the System Silver-Magnesium: II) Short-Range Order

    By Amitava Gangulee, Michael B. Bever

    The order-disorder transition in Ag-Mg alloys in the range 17 to 26 at. pct Mg was investigated and some thermodynamic, electrical and mechanical properties of ordered Ag-Mg alloys were measured. A mo

    Jan 1, 1969