Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Economics of the Mineral Industry - Changing Conditions Compel New Concepts of Mineral EngineeringBy P. T. Allsman
INTRODUCTION The honor of being the recipient of the Mining Society's Daniel C. Jackling Award for 1966 imposes on me the responsibility to search for the subject that I would be best qualifie
Jan 1, 1967
-
The value proposition of circulating fluidized-bed technology for the utility power sectorBy N. J. Castilla, R. Giglio
"Circulating fluidized-bed (CFB) combustion technology has been around for over 40 years, but over the last 6 years it has been commercially demonstrated at the 500 MWe scale at the Lagisza plant loca
Jan 1, 2015
-
Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of DesignBy Jimmy Thompson
The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const
Jan 1, 2008
-
South 196th/200th Street Corridor And Bridge Crossing, Kent, WashingtonBy James Su
The Green River Valley in Kent, Washington, is a fast growing area containing retail facilities, warehouse factories and industrial businesses, including the Boeing Space Center. Traffic from Intersta
Jan 1, 1998
-
Geology, Ground Control, and Mine Planning at Bowie Resources, Paonia, COBy Collin Stewart
Bowie Resources maintains one of the most pro-active ground control programs in the U.S. mining industry today. Its guiding philosophy is that everyone in the organization, from the miners at the fac
Jan 1, 2006
-
150th Anniversary Victoria Bridge, 1859 - mid-December, first train; 1860 August, celebrationBy H. J. McQueen
ORDER OF PRESENTATION ?INTRODUCTION TO THE VICTORIA BRIDGE ?REASONS FOR A BRIDGE AT MONTREAL ?RAILROAD BRIDGE REQUIREMENTS ?IRON PRODUCTION CANADA / WORLD AL ?METALLURGICAL INDUSTRY CANADA ?FA
May 1, 2011
-
The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. LouisBy Dan A. Brown
The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia
Jan 1, 2011
-
Index (240e6e0a-3566-4b36-b9d6-27f0245c725b)Jan 1, 1963
-
Detoxification of Arsenic Bearing WastesBy E N. Sajin
The final arsenic bearing waste products at the majority of metallurgical and chemical enterprises are cakes in which arsenic is present in the form of calcium arsenate. Burial of cakes demands constr
Jan 1, 2002
-
Robust versus Flexible Open Pit Mine DesignStrategic planning in mining is an important value accretive process. One of the most important aspects during the planning phase is determining the correct mine and plant design. The traditional mine
Dec 6, 2010
-
Investigations on the Martha Hill Gold ProspectMining at Waihi on the Martha Hill commenced in 1878 and between 1892 and 1953 produced 35 million ounces of bullion from some 13.5 million short tons of ore from 40 named quartz reefs. The general g
Jan 1, 1979
-
Mine Stope Coverage Cuts Acid Mine DrainageBy Joseph J. Feiler
Historical mining operations in Colorado and other western states have resulted in thousands of remnant mine openings. Many are sources of metals loading and acid water generation in surface and grou
Jan 1, 2006
-
An algorithm for quantifying regionalized ore grades - SynopsisWe present a novel hybrid algorithm for quantifying the ore grade variability that has central importance in ore reserve estimation. The proposed algorithm has three stages: (1) fuzzy clustering, (2)
Jan 1, 2008
-
Excellence in Professional Training for the Mining Industry - A Challenge for Tertiary InstitutionsThe theme of the conference is "excellence", an epithet of special significance in tertiary education. It appears in the mission statements, goals and plans to achieve them of most, and quite possi
Jan 1, 1989
-
New Interactive Training Tools Available To Coal And Aggregate OperatorsBy Bill York-Feirn
The Colorado Mine Safety & Training Program (MSTP), in late 2005, completed and began distributing two new training tools; one geared to underground coal mine foremen and the other to surface aggregat
Jan 1, 2006
-
Planning Concept For U/G Works - Overall Planning Concepts Of The Underground Works - Park Station To Marlboro Portal - SummaryBy Philippe Dumont
?Lay out of the tunnel section ?General ?Geology ?Tunnels methods ?Stations constraints ?Impacts on tunnels ?Design ?Programs
-
Outburst Control in Underground Coal Mines,By Floyd D. Varley
Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause
Jan 1, 1986
-
ArriumÆs Iron Baron Hematite Beneficiation Plant - A Success from Start to FinishBy M Bannear, C Stanton
Since 2008, Arrium has been developing and commissioning a new low-grade hematite ore benefication plant (or OBP) at its Iron Baron mine site.The Iron Baron mine, which was closed in the 1990s, could
Aug 12, 2013
-
Notes on the Phillips River Gold and Copper FieldTHE Phillips River gold and 'copper field is situated on the south coast of Western Australia, about 200 miles east of Albany, 180 miles west of Esperance, and: 250 miles south of Southern Cross,
Jan 1, 1917
-
Globalization in the 21st Century Discussed at Colorado MPD MeetingBy Steve Kral
Globalization was the key word for the mining industry during the 1990s, just as productivity was the key word of the 1980s. And globalization will remain the key word as the industry enters the 21st
Jan 1, 1999