Search Documents

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • SME
    Coal Industry Leaders Meet to Discuss Methane Issues

    By William R. Yernberg

    A conference on coalbed and coal mine methane was held March 27 and 28, 2000, in Denver, CO. The conference, organized by the Strategic Resource Institute, was attended by leaders in the coal mining a

    Jan 1, 2000

  • SAIMM
    Qualitative Analysis Of Fine Coals Obtained From Triboelectrostatic Separation ? Synopsis

    By S. O. Bada

    Coal samples taken from the No. 2 Seam and No. 4 Seam in a South African colliery were tested in a rotary triboelectrostatic separator. The two-stage triboelectrostatic separation results using the -1

    Jan 1, 2012

  • CIM
    An Expert System Supervisor of a Flotation Circuit

    By A. L. Mular, R. P. Edwards

    "The operation of flotation circuits is often regarded as a combination of art and science. Expert systems offer a method by which the art may be captured and supervisory control of flotation circuits

    Jan 1, 1991

  • SAIMM
    Development of a corrosivity classification for cement grouted cable strand in underground hard-rock mining excavations - Synopsis

    A systematic study of groundwater conditions at eight underground mine sites exhibiting a wide range of groundwater qualities throughout Australia has been completed at the WA School of Mines. This ha

    Jan 1, 2008

  • NIOSH
    RI 3184 Sanitary Surveys of the Coal-Minig, Metal-Mining & Smelter Towns of Utah

    By Arthur L. Murray

    "INTRODUCTION In compliance with those provisions of the organic act establishing the Bureau. of Mines which relate to improvement of health conditions of persons engaged in the mining, preparation, o

    Oct 1, 1932

  • SME
    Benefits Of The Pilot Tunnel On The Cumberland Gap Highway Tunnel Project

    By W. Randall, Robert M. Leary

    Twin 1250 m (4100 ft.) long highway tunnels through Cumberland Mountain near Middlesboro, Kentucky are planned to be completed in the early 1990's. The tunnels will be excavated in sandstones, li

    Jan 1, 1987

  • ISEE
    Overburden Blast Cast Designs, Factors Affecting Results and Economics

    By Connie Postupack

    The purpose of the workshop is to show the effect of various blasting factors on the overall results.

    Jan 1, 1994

  • CIM
    A Continuous Improvement Model Linking Planning and Operations

    By Paul Clark

    Generation - Profile l 9,726 megawatts (MW) of capacity l 46,877 gigawatt hours (GWh) produced at an average plant availability of 88.4% l 47 facilities in four geographies: Canada; the U.S.; Mexic

    May 1, 2004

  • SAIMM
    TBM cutting forces with particular reference to cutter and tunnel diameters

    By S. Okubo, K. Fukui

    Empirical equations established for estimating the rock strength of the working face based on the cutting forces of a tunnel boring machines (TBM) are further examined and discussed with respect to th

    Jan 1, 2003

  • SME
    Numerical Simulation Studies on Effects of Explosion Impact Load on Underground Mine Seal Mining, Metallurgy and Exploration (5cd6bb51-d24c-4ceb-bdd2-327b1ac6637a)

    By Congling Shi, Marek Borowski, Yue Wang, Jianwei Cheng, Xixi Zhang, Xuan Xu

    As the first barrier to prevent accidents caused by explosions in underground coal mines, the integrity and stability of mine seals have great effects on mine workers’ lives and underground production

  • SME
    Numerical Simulation Studies on Effects of Explosion Impact Load on Underground Mine Seal Mining, Metallurgy and Exploration

    By Congling Shi, Marek Borowski, Yue Wang, Jianwei Cheng, Xixi Zhang, Xuan Xu

    As the first barrier to prevent accidents caused by explosions in underground coal mines, the integrity and stability of mine seals have great effects on mine workers’ lives and underground production

  • AIME
  • SME
    Impact of deformable materials and convergence on the transverse load capacity of mine ventilation stoppings

    By T. J. Batchler

    Deformable materials are sometimes added to ventilation stopping constructions to prevent damage caused by convergence in coal mines. However, adding deformable materials can significantly reduce the

    Jan 1, 2009

  • NIOSH
    RI 5839 Bacteria In Mining And Metallurgy: Leaching Selected Ores And Minerals; Experiments With Thiobacillus Thiooxidans ? Summary

    By Joseph A. Sutton

    This study was undertaken by the Bureau of Mines to determine whether the sulfur-oxidizing bacterium Thiobacillus thiooxidans could use sulfur compounds to produce sulfuric acid in sufficient quantiti

    Jan 1, 1961

  • SME
    Signal Processing With Wavelet Transform For In-Seam Seismic Based Mine Void Detection Technique

    By M. Ge

    Signal processing is a major challenge for In-Seam Seismic (ISS) technique. Fourier Transform is an important tool for signal processing such as frequency analysis. However, for ISS signal, localized

    Jan 1, 2007

  • DFI
    Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel Approach

    By Aly M. Mohammad

    The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con

    Jan 1, 2009

  • AUSIMM
    Variation in the Composition of Seam Gases Issuing from Coal

    By Hargraves A. J, Smith J. W

    Experiments conducted at Tahmoor Colliery, Sydney Basin, have demonstrated the variability in chemical and isotopic composition of seam gases issuing from boreholes in the Bulli seam and desorbing fro

    Jan 1, 1987

  • SME
    Precious Metal Heap Leaching In A High Rainfall Alpine Setting At The Barrick Gold Pierina Mine In Peru

    By G. Bee, Z. Gavelan, R. Espinel, Y. Roditis, X. Ochoa

    In August 1996 Barrick Gold Corporation acquired the Pierina property, an advanced stage exploration project, high in the Andean Cordillera of Peru and in November 1998, in a record time of just over

    Jan 1, 2002

  • AUSIMM
    Is it so Hard? Getting the Balance Right

    Project approvals are the key mechanism to balance the environmental, social and economic aspects of a project. The assessment approaches vary significantly between states, with some having a strong e

    Jun 1, 2010