Search Documents

  • AUSIMM
    Smelting Reduction and Direct Reduction of Iron Ores VAI Technologies for Scrap Substitutes (COREX«, FINMET«, FINEX«)

    By Bohrn W, Milionis K, Tessmer G, Reidetschlager J

    The share of electric arc furnace based steel production is increasing - New technologies for the production of virgin raw materials for EAF production are under development and on the market - VAI

    Jan 1, 1999

  • AUSIMM
    Tecnical note-lineament guidelines to mine development: a continuing case history, northeastern Queensland

    LANDSAT imagery has renewed interest in linear features first recognised by E. S. Hills in a physiographic model of Australia. Certain of these lineaments are aligned with structures which control min

    Jan 1, 1986

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • SME-ICGCM
    Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)

    By Gabriel Esterhuizen

    The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal

    Jan 1, 2007

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • AUSIMM
    Statistical Analysis of Sampling and Assaying Results, Drilling Campaign, King Island Scheelite Mine, Tasmania

    During the drilling campaign conducted between October, 1942; and May, 1943, to prove the extent of the scheelite deposit worked by King Island Scheelite N.L. at Grassy, King Island, Tasmania, 35 hole

    Jan 1, 1950

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • TMS
    Rheological Characterization Of Viscoelastic Composite Systems Used In Oil Industry

    By Sayavur Bakhtiyarov

    Keywords: Rheology, Viscoelastic, Oil In this paper we present the results of the rheological property measurements on viscoelastic composite materials used in oil industry. Laboratory experiment

    Jan 1, 2005

  • AUSIMM
    Nature Conservation and the Minerals Industry

    This paper examines the reform of mining legislation over recent years, the establishment of new Crown land management agencies, and the role of the Crown and environmental groups in nature conservati

    Jan 1, 1995

  • SAIMM
    Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces

    By I. Mc Dougall

    Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,

    Jan 1, 2007

  • TMS
    Preparation Of Mono-Dispersed Cobalt Oxide Particles By Homogeneous Precipitation With Urea

    By Qing Bo

    In this study, the cobalt oxide precursor was prepared in open-style reactor in the condition of high reactant concentration, and then the precursor was decomposed to obtain the cobalt oxides (Co3O4).

    Jan 1, 2006

  • AUSIMM
    Towards the Martha Mine - The Long March

    With a price slowly rising above US$35 per ounce gold became a mineral worthy of prospecting and mining endeavour in the early to mid 1970s. Fortune therefore appeared to smile onNew Zealand with its

    Jan 1, 1986

  • SME
    Santa Fe Pacific Gold Targets Million Ounces/Year Production

    By William R. Yernberg

    Santa Fe Pacific Gold, headquartered in Albuquerque, NM is expanding its operation at the Twin Creeks Mine in Nevada. The $250-million sulfide expansion project, including the Sage Mill, is under con

    Jan 1, 1996

  • AUSIMM
    The Determination of Certain Curves and Their Application to the Desilverisation of Lead by the Parkes Process

    WHILE in the employ of the Broken Hill Associated Smelters and the Electrolytic Zinc Oompanies at their South Melbourne Research Station, the writer was detailed to investigate the principles underlyi

    Jan 1, 1925

  • AUSIMM
    A Glossary of Terms Used in Mining-Geology

    When perusing articles which treat of mining geology, and when talking with miners on the field, one is at times unable to follow the exact thoughts intended to be expressed, owing to the introduction

  • AUSIMM
    Pneumatic Stowing of Mill Residues in Underground Stopes, Broken Hill South Limited

    Two of the problems long associated with the complete extraction of level pillars in the wide ore bodies of Broken Hill have been: (1) The high cost of maintaining level gangways through areas of slow

    Jan 1, 1941

  • CIM
    The Real Cost of Material Handling Problems – And How to Avoid Them

    By T. Holmes

    Investigations reveal that the throughput difference between a perfect production day and the average is often on the order of 40%, and that bulk solids handling system deficiencies are the largest (>

    Jan 1, 2019

  • AUSIMM
    Study on Flotation of the Low-Grade Magnesite Ore

    Study on Flotation of the Low-Grade Magnesite Ore

    Sep 13, 2010

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • AUSIMM
    Process Options for Difficult Arid-Region Nickel Laterites

    Process Options for Difficult Arid-Region Nickel Laterites In the absence of the discovery of significant nickel sulfide deposits, the future of Australia's nickel industry will increasingly dep

    Sep 13, 2010