Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Effects of Longwall Mining on Streamflow in the Pittsburgh Seam BasinBy Kenneth L. Johnson
The effects of underground longwall coal mining on flow in perennial streams within the Pittsburgh seam basin were evaluated. Four streams above four different longwall mines were studied. Overburden
Jan 1, 1997
-
Pillar SizingBy Marek J. Mrugala
Coal strength based on scaled uniaxial compressive strength from the laboratory and back calculations from in-mine observations of pillar stability indicate that material strength scaling rules are op
Jan 1, 1989
-
Analysis of Roof Falls at and Recommendation of Roof Control Plansfor Rofomex Posphate MineBy Jinsheng Chen
For underground openings, many factors can cause roof failure and thus roof falls. The most common factors related to Mother Nature are weak roof lithology, geological structures, and an abnormal in-s
Jan 1, 2011
-
A Novel Ground Control Program at Plateau Mining CompanyBy Hamid Maleki
A novel ground control program has been developed at Plateau Mining Company through five years of geotechnical investigations. The study was initiated to determine the causes for roof stability proble
Jan 1, 1987
-
Application of Stress, Geologic, and Support Design System (Sgssm) to Ground Control for Mine Slope EntriesBy John Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a mine slope entry, the problem becomes more complicated because a slope trans
Jan 1, 2011
-
Stereological Sampling And Analysis For Characterizing Discontinuous Rock MassesBy J. K. Owens
As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I
Jan 1, 1994
-
Topography and Coal Seam Initial Stress Estimation: a Sensitivity StudyBy Jeffrey K. Whyatt
Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv
Jan 1, 2011
-
Mechanics of Rib Deformation—Observations and Monitoring in Australian Coal MinesBy Yvette Heritage
"The risk of fatalities from rib failure is still prevalent in the coal mining industry. This risk has prompted further research to be conducted on rib deformation in order to understand the mechanism
Jan 1, 2018
-
Analysis of Alternatives for Using Cable Bolts as Primary Support at Two Low–seam Coal MinesBy Gabriel S. Esterhuizen
"Cable bolts are sometimes used in low-seam coal mines to provide support in difficult ground conditions. This paper describes cable bolting solutions at two low-seam coal mines in similar ground cond
Jan 1, 2015
-
The Effects of a Passing Longwall Face on the Roadway, Pillars, and Standing Supports in Northern West VirginiaBy David Gearhart, Peter Zhang, Gabriel Esterhuizen
"Researchers from the National Institute for Safety and Health (NIOSH) installed instruments in the track entry and in the pillars of a northern West Virginia longwall coal mine between two planned pa
Jan 1, 2018
-
An Alternative for More Productive Rib Bolting in Underground Mining ApplicationsBy Joe E. Bryan, John P. McDonnell
"Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib
Jan 1, 2015
-
Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical ModelsBy R. Kaund
"Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m
Jan 1, 2018
-
Calibrating LaModel for SubsidenceBy Keith A. Heasley, Jian Yang
"LaModel uses a laminated overburden boundary-element model and can calculate not only seam-level stresses and displacements but also surface subsidence for thin tabular deposit such as coal seams (He
Jan 1, 2016
-
Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled StopeBy Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen
"As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.
Jan 1, 2018
-
Understanding the Connection between Blasting and Highwall StabilityBy R. Quentin Eades, Kyle Perry
"Surface mines continue to implement highwalls for several reasons, such as increasing recovery, improving margins, and justifying higher stripping ratios. Highwall stability is a complex issue that i
Jan 1, 2018
-
Ground Control Design Considerations for Reducing Longwall?Induced Stress and Seismicity Associated with Massive Sandstone under Deep CoverBy Daniel W. H. Su
Thick, massive sandstone present in close proximity of the mining horizon can create difficult longwall caving issues, which may lead to severe face loading and subsequent face roof control problems.
Jan 1, 2014
-
Stability Control of Clusters of Deep Openings Around Shaft Bottom and Theory of Rock DeformationBy Yanfa Gao
Clusters of underground openings were developed around the shaft bottom of Tangshan Mine. They were deep and located in soft rock strata. After development, those openings have been subjected to consi
Jan 1, 2002
-
Prognosis And Control Of Mining Induced Surface Subsidence And Ground Movements In The German Hardcoal Sector, Case StudiesBy Axel Preusse
This paper shows basic considerations about the prognosis and prediction of surface subsidence and other ground movements in the German hardcoal industry. The following case studies describe experienc
Jan 1, 2000
-
A New Rock Bolting Concept For Underground RoadwaysBy G. Skybey
The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the resi
Jan 1, 1992
-
Methods Of Controlling Thick And Strong Roof In Longwall MiningBy Deren Zhu
The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat
Jan 1, 1990