Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    A Case History of Computer-Aided Lineament Analysis for Ground Control Planning

    By C. D. Peters

    The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu

    Jan 1, 1986

  • SME-ICGCM
    Tension-Torque Relationship For Mechanical Anchored Roof Bolts

    By H. N. Maleki

    Tension-torque relationships were investigated *n a coal mine for bath standard 5/8 in. (16 mm) bolts and a vibrating wire instrumented bolt, using conventional and controlled installation techniques.

    Jan 1, 1984

  • SME-ICGCM
    Resupporting High Roof Falls

    By Nicholas Chlumecky

    One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is

    Jan 1, 1981

  • SME-ICGCM
    Study Of Quantitative Impacts To Ground Water Associated With Longwall Coal Mining At Three Mines Sites In The Northern West Virginia Area

    By Denise Y. Dixon

    The objectives of this study were to (1) document the hydrologic impacts of longwall mining on ground water, (2) identify the factors which affect the extent of dewatering, and (3) develop empirical t

    Jan 1, 1988

  • SME-ICGCM
    Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western China

    By Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li

    "The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat

    Jan 1, 2017

  • SME-ICGCM
    High Performance Longwall Production Based on Rag Experience in German Coal Mines

    By Bolger Witthaus

    "High performance production under challenging geological conditions is a product of several parameters. Main factors are the technical equipment and the knowledge in processing. The design and the su

    Jan 1, 2010

  • SME-ICGCM
    Application of New Void Detection Algorithm for Analysis of Feed Pressure and Rotation Pressure of Roof Bolters

    By Eric Keller, Jamal Rostami, Wenpeng Liu

    "Roof and rib instability is an important issue in underground mining. To optimize ground support design, enhance ground stability, and reduce the possibility of roof or rib failure with minimal use o

    Jan 1, 2016

  • SME-ICGCM
    Comparison of Closure Measurements with Finite Element Model Results in an Underground Coal Mine in Central Utah

    By Jessica M. Wempen, William G. Pariseau, Michael K. McCarter

    "Quantitative analysis of mine-wide subsidence at the kilometer scale and details of stress distribution about an advancing longwall face are estimated using an adaptation of the finite element method

    Jan 1, 2018

  • SME-ICGCM
    Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal Mining

    By Brian Daniels, James Farroni

    "Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains

    Jan 1, 2010

  • SME-ICGCM
    Roof-Pillar Interface Affecting the Pillar Behavior

    By Andre Cezar Zingano

    "The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng

    Jan 1, 2016

  • SME-ICGCM
    A Comparison Between ARMPS and the New ARMPS?LAM Programs

    By Peng Zhang

    In previous research, the laminated overburden model from the LaModel program was effectively integrated with Analysis of Retreat Mining Pillar Stability (ARMPS) through ARMPS-like input to create a l

    Jan 1, 2014

  • SME-ICGCM
    Performance Characteristics for Large Sections of Welded Wire Screen With Multiple Pull Patterns

    By Timothy J. Matthews, Timothy J. Batchler, Ted M. Klemetti

    "From 2011–2016, there were 1,511 documented injuries, including 7 fatalities, from ground falls in underground coal mines in the United States. The majority of these ground-fall injuries were not cau

    Jan 1, 2018

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    Optimization Research on Flexible Shield Supports Mining Method in Steeply Coal Seam

    By Bingjie Huo

    "China is a major coal producer and consumer. It is necessary to mine the steeply pitching coal seams due to development of the coal industry to meet the increasing needs for coal. Flexible shield sup

    Jan 1, 2010

  • SME-ICGCM
    Longwall Shield Recovery, Using Phenolic Foam Injection for Gob Control As An Alternative to Recovery Mesh

    By James D. Pile

    Following a methane ignition in the active panel of a longwall coal mine, the affected panel was successfully isolated from the rest of the mine. This allowed for the remainder of the mine to return t

    Jan 1, 2013

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    The Study on the Overlying Strata Movement Features and Development Characters of the "three Zones" in Ultra-Thick Coal Seams

    By Xuexin Ding, Weijie Wei, Jinwang Zhang, Yi Chen, Shengli Yang

    "Many ultra-thick coal seams exist in Xinjiang and the northern part of the Inner Mongolia. These coal seams are more than 30-40m thick. This kind of the thick coal seam is too difficult to extract in

    Jan 1, 2016

  • SME-ICGCM
    Vertical Load Capacities of Roof Truss Cross Members

    By David F. Gearhart, Khaled M. Mohamed

    "Trusses are primarily used as passive roof supports in coal mines. They are constructed of three main parts: two grouted bolts installed at opposing forty-five degree angles into the roof so that the

    Jan 1, 2015

  • SME-ICGCM
    Subsidence Over Room and Pillar Retreat Mining in a Low Coal Seam

    By Andre Zingano, Anderson Weiss

    "The objective of this paper is to study the behavior of a low thick and low depth coal seam and the overburden rock mass. The mining method is room and pillar in retreat and partial pillar recovery.

    Jan 1, 2018