Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Application Of GRP And Thin Spray Liner Support Products In A Typical Block Cave Mining Method To Enhance Safety And Productivity ? Synopsis
A typical sub-level block cave mining extraction method employs an undercut level to establish a cavity in hard rock, and as such requires special support methods and products to be installed during t
Jan 1, 2012
-
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses
By H. Jang, Y. Kawamura
Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter
Jan 1, 2015
-
Development Of A New Operator Visibility Assessment Technique For Mobile Equipment
By I. Bhattacherya
Over the last three decades, the mining industry has been moving towards underground mechanized mining methods and the number of load haul dump (LHD) vehicles utilized has increased. The growth of mec
Jan 1, 2006
-
Finite Element Modelling Of Electric Currents In Ac Submerged Arc Furnaces
By I. Mc Dougall
Finite element models were generated of two submerged arc furnaces of different geometries. A 48MW circular furnace and a 68MW 6-in-line rectangular furnace were studied. The electrodes, raw material,
Jan 1, 2007
-
Rock avalanche run out prediction: combined application of two numerical methods
By R. Poisel, C. Scavia, Preh A., W. Roth, M. Pirulli
ABSTRACT: Two methodologies for the three-dimensional simulation of the run out of rock avalanches are presented: one based on a granular approach and the other based on a continuum equivalent approac
Jan 1, 2003
-
Steel-Slag As Filler Material In Concrete
By H. Moosberg-Bustnes
In cement-based products, such as concrete and mortars, a balance between the particle sizes of the components must be kept in order to obtain the required material properties, such as workability and
Jan 1, 2004
-
The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium ? Synopsis
By W. S. Steinberg
In 1963, the full-scale engineering study for the development of an iron, steel, and vanadium plant was initiated. This was the birth of Evraz Highveld and its process flow as it is known today. Highv
Jan 1, 2011
-
Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor
By A. Bascetin
One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g
Jan 1, 2007
-
Engineering application of thrust block analysis in slope stability problems in open pit mines - Synopsis
By K. N. Karparov
The classical limit equilibrium methods are suspected to be ineffective in predicting the potential for highwall failure in many instances in coal mines around the world. Slope engineers have for many
Jan 1, 2009
-
Numerical Simulation Of Shear Fracture Evolution In Laboratory-Scale Samples ? Synopsis
By D. P. Roberts
This investigation aimed to simulate the experiments performed by Nic Gay (Gay, N.C. 1976. Fracture growth around openings in large blocks of rock subjected to uniaxial and biaxial compression. Intern
Jan 1, 2012
-
Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft
By K. Lombard
"‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof
Jan 1, 2015
-
Improving Financial Returns From Mining Through Geostatistical Simulation And The Optimized Advance Drilling Grid At El Tesoro Copper Mine ? Synopsis
By J. M. Ortiz
Grade control and short-term planning are usually based on the samples obtained from blastholes. These samples may carry a large sampling and sample preparation error. At El Tesoro copper mine in nort
Jan 1, 2012
-
Dealing with high-grade data in resource estimation
By O. Leuangthong, M. Nowak
"The impact of high-grade data on resource estimation has been a longstanding topic of interest in the mining industry. Concerns related to possible over-estimation of resources in such cases have led
Jan 1, 2015
-
-
Support system performance under different corrosion conditions - Synopsis
This paper reports on recent field observations on the performance of support systems under different corrosion environments in Canadian underground mines. Phenomenological data are used to gain a bet
Jan 1, 2008
-
The development of techniques to predict and manage the impact of surface subsidence
COALTECH 2020 initiated a research project to provide the coal mining industry with a modelling tool to determine the expected types of subsidence, risks and the investment required in post-closure fu
Jan 1, 2003
-
How Electronics Can Release the Imagination
By G. V. R. Landman
It is self-evident that economic pressure demands that today?s mines stay ahead and stay competitive. The challenge, however, isto find fresh approaches to the pursuit of efficiency and operational ef
Jan 1, 2010
-
Some Myths About DC Arc Furnaces ? Synopsis
By R. T. Jones
DC arc furnaces are widely used for steel scrap melting as well as for reductive smelting of ore fines. Industrial smelting applications include the smelting of chromite to produce ferrochromium, the
Jan 1, 2011
-
Reconstruction time of a mine through reliability analysis and genetic algorithms - Synopsis
By M. Kumral
A mining system consists of many sub-systems such as drilling, blasting, loading, hauling, ventilation, hoisting and supporting. During mining operation, these sub-systems may experience various probl
Jan 1, 2009
-
Equipment selection based on the AHP and Yager’s method
By M. Yavuz
One of the challenging problems for optimization in mining operations is to choose the best equipment among the alternatives. Equipment selection is an important task for mine management due to its op
Jan 1, 2015