                The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? SynopsisBy J. P. Burland
The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a
Jan 1, 2010
 - 
                    
                Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? SynopsisBy Y. Z. Wang
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2
Jan 1, 2010
 - 
                    
                Installation Of Augered Cast-In-Place PilesBy Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
 - 
                    
                Automated Pile Load Test MonitoringBy Joel L. Volterra
Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site
Jan 1, 2008
 - 
                    
                Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2009
 - 
                    
                Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock SlopeBy Herbert F. ?Buck? Darling
A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat
Jan 1, 2013
 - 
                    
                Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
 - 
                    
                Virginia Route 340 Bridges: Challenges in Karst TerrainBy Chaz Weaver, James Sheahan, Michael Mo
"The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto
Jan 1, 2017
 - 
                    
                Load Tests On Belled Piles With Polystyrene Foam Between The Shaft And The BaseBy José Carlos A. Cintra
This paper addresses a new experimental procedure to measure the shaft friction and the base resistance of bored piles during static load tests. It is proposed that a set of polystyrene foam discs, pl
Jan 1, 2002
 - 
                    
                Center Rock Sets New Record on St. Louis Metro Project"The Metropolitan St. Louis Sewer District (MSD) in Missouri, the country’s fourth largest sewer system, is upgrading its storm and wastewater infrastructure in a 23-yearlong, $4.7 billion initiative
Jan 1, 2017
 - 
                    
                Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank ErosionBy Brandon Smith, William Bohlen
Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al
Jan 1, 2019
 - 
                    
                Bertha Rescue Shaft – SR99 TunnelBy Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
 - 
                    
                Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
 - 
                    
                10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job CohenIt is my great pleasure as mayor of the city of Amsterdam to welcome you today to Amsterdam, and to the 10th International Conference on Piling and Deep Foundations. The history of Amsterdam has b
Jan 1, 2006
 - 
                    
                Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
 - 
                    
                Ground Improvement By Means Of Stabilising ColumnsBy Georg Breitsprecher
The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen
Jan 1, 2006
 - 
                    
                Long Term Performance of Grouts and the Effects of Grout By-ProductsBy Stephan A. Jefferis
I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the
Feb 10, 2003
 - 
                    
                Pile Foundations General - .1 Equipment informationBy Bengt H. Fellenius
.1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1
Jan 1, 1991
 - 
                    
                Piled Foundations for the New Wembley Stadium, LondonBy Anthony L. Reynolds, Clifford J. Wren
"The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable
Jan 1, 2005
 - 
                    
                Shoring Design of Historic LA Metro StationBy Babak Mamaqani
The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi