Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Value Of Field Measurement In The Design And Construction Of Deep Foundations ? Synopsis

    By J. P. Burland

    The paper describes a number of recent case histories in the United Kingdom where field instrumentation and measurements have played a major role in the design and construction of excavations, piles a

    Jan 1, 2010

  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • DFI
    Installation Of Augered Cast-In-Place Piles

    By Michael Moran

    Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:

    Jan 1, 2005

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Non-Destructive Testing, Evaluation And Re-Use Of Deep Foundations Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2009

  • DFI
    Cooperative Effort Overcomes Problems With Pier And Cofferdam Construction Caused By Rock Slope

    By Herbert F. ?Buck? Darling

    A bridge replacement project in Rochester, NY, encountered difficulties when it was determined that rock below one pier was sloping downward toward the river at an angle of 42 degrees versus anticipat

    Jan 1, 2013

  • DFI
    Alameda Corridor-East: San Gabriel Trench Project

    By David Peterson, Terry Tucker, Rafael Serrano

    "The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin

    Jan 1, 2017

  • DFI
    Virginia Route 340 Bridges: Challenges in Karst Terrain

    By Chaz Weaver, James Sheahan, Michael Mo

    "The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto

    Jan 1, 2017

  • DFI
    Load Tests On Belled Piles With Polystyrene Foam Between The Shaft And The Base

    By José Carlos A. Cintra

    This paper addresses a new experimental procedure to measure the shaft friction and the base resistance of bored piles during static load tests. It is proposed that a set of polystyrene foam discs, pl

    Jan 1, 2002

  • DFI
    Center Rock Sets New Record on St. Louis Metro Project

    "The Metropolitan St. Louis Sewer District (MSD) in Missouri, the country’s fourth largest sewer system, is upgrading its storm and wastewater infrastructure in a 23-yearlong, $4.7 billion initiative

    Jan 1, 2017

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015

  • DFI
    Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)

    By Dinesh Hinduja, Pérez: Miguel

    "Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders

    Jan 1, 2015

  • DFI
    10th International Conference On Piling And Deep Foundations: Amsterdam 2006 - Title ? Table Of Contents - Welcome Address From The Mayor Of Amsterdam, Job Cohen

    It is my great pleasure as mayor of the city of Amsterdam to welcome you today to Amsterdam, and to the 10th International Conference on Piling and Deep Foundations. The history of Amsterdam has b

    Jan 1, 2006

  • DFI
    Application of Non-Destructive Testing to Drilled Shafts

    Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde

    Jan 1, 2004

  • DFI
    Ground Improvement By Means Of Stabilising Columns

    By Georg Breitsprecher

    The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen

    Jan 1, 2006

  • DFI
    Long Term Performance of Grouts and the Effects of Grout By-Products

    By Stephan A. Jefferis

    I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the

    Feb 10, 2003

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Piled Foundations for the New Wembley Stadium, London

    By Anthony L. Reynolds, Clifford J. Wren

    "The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable

    Jan 1, 2005

  • DFI
    Shoring Design of Historic LA Metro Station

    By Babak Mamaqani

    The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi

    Apr 1, 2022