Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Automation Of Pile Foundation Design Post-Processing To Produce Pile PlansBy Rajasekar Subbian, Jessica Oudhof
In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level
May 1, 2022
-
General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"By Tim Chapman
This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f
Jan 1, 2006
-
Deep Excavation for Loop PitBy Pathik Deb Mallik, Shyamal K. Mitra, Rajiv Kishore, Shuvranshu Rout, Manos De
"This paper presents a case study on the design and construction of a deep underground pit structure constructed inside almost a century old existing plant building. The complexity and challenge for t
Jan 1, 2015
-
Determination of Coefficient of Modulus of Sub-Grade Reaction for Free Head Short PileBy Sumit Kumar Biswas, Moyukh De, Sibapriya Mukherjee
"The piles often are also subjected to lateral (horizontal) forces and moments. In fact, there are some structures where the primary function of piles is to transfer lateral loads to the ground. Prope
Jan 1, 2015
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Workshop on Quality Assurance for Post-Grouted Drilled ShaftsBy Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016
-
Estimation & Comparison Of Axial Compression Capacity Of Bored Cast In-Situ Piles As Per Indian And International StandardsBy Sowmiyaa. V. S., Tiruvengala Padma
Axial compression capacities of bored cast in situ piles as per Indian and International Standards are compared in this paper. Bored cast in-situ piles resting on soil and rock are considered for capa
Sep 1, 2022
-
Prediction of Axial Geotechnical Resistance of Base Grouted Drilled ShaftsBy Emad Farouz, Ehab S. Shatnawi
"The increasing demand for small deformations and high-capacity drilled shafts without enlarging drilledshaft diameters has motivated the development and increasing use of a base grouting (BG) techniq
Jan 1, 2016
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
Non-destructive Testing Of Unknown Bridge Foundation Lengths Using Parallel Seismic TestingBy Chetan D. Savani, Mike K. Muchard
The necessity to evaluate undocumented foundation lengths is essential in assessing the useable life, need for scour protection, retrofitting, or full reuse of existing bridge foundations. For this pu
-
SR167/70th Avenue East Vicinity Bridge Replacement ProjectBy Reda Mikhail, M. Birkan Bayrak
The Washington State Department of Transportation (WSDOT) State Route (SR) 167/70th Avenue East Vicinity Bridge Replacement Design-Build project is located in Fife, Washington. This $40 million projec
Sep 8, 2021
-
Sustainability: A Role for Blended Cements and Industrial Byproducts in Soil Mixing, Grouting, and Slurry WallsBy Charles M. Wilk, Lori Tiefenthaler
"Information presented in this paper can be used to support deep soil mixing, subsurface grouting and slurry wall technology as sustainable construction technologies. Ordinary Portland Cement (OPC) is
Jan 1, 2017
-
Installation Of Drilled Piers In Shales ? SynopsisBy A. C. Ackenhell
The geologic environment of Pittsburgh, Pennsylvania is both inviting and challenging to drilled pier installation. The shales and clayey soil zone of the hills are favorable but the alluvial soils of
Jan 1, 2010
-
Dynamic Response of Short Piles under Lateral Transient LoadBy Ambarish Ghosh, Rituparna Dey, Indrajit Chowdhury
"In port and harbor facilities, jetties and cargo berth terminals are usually installed on piles that remain partially embedded in soil, while a part of it behaves as columns supporting top deck. Tech
Jan 1, 2015
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble DepositsBy Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019
-
Pressure-Grouting Improves Performance of Helical Piles: A Production Case History, Static Load Test Results, and Comparisons to Predicted Lateral Deflection and Axial ResistanceBy Karen J. Dawson, Francisco Johnson
"Pressure-grouted high strength helical displacement piles are a recently developed pile type that can be useful in conditions where noise or vibrations must be low or where access or clearance is lim
Jan 1, 2016
-
Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, CanadaBy Nadir Ansari, Brian W. Wilson, Marina S. W. Li
"A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B
Jan 1, 2017
-
High-Capacity Helical Piles for Drill Trestle SupportBy Matt Fenwick, Douglas R. Schwarm
Stringent underwater noise limits at the Fairview Ave. N. bridge replacement on Seattle's Lake Union required an innovative approach to supporting the 470-ft long drill trestle. Screw-in foundations
Sep 8, 2021
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
Repairs Of Diaphragm Walls, Lessons LearnedBy Raymond J. Poletto
This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal
Jan 1, 2011