Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Managing SOE Construction Risk through Design-Build Systems

    By Rob Jameson

    "The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,

    Jan 1, 2017

  • DFI
    Construction And Instrumentation Of A Deep Foundation ? Synopsis

    By Y. K. Wong

    This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment

    Jan 1, 2010

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    An Unusual Permanent Shoring Job

    By Gordon Demetrick

    3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi

    Jan 1, 1987

  • DFI
    Are Specifications for Deep Foundation Concrete Up-To-Date?

    By Karsten Beckhaus

    "Abstract Tremie concrete for special geotechnical works needs special properties, especially during the casting process. Today’s execution standards for bored piles and diaphragm walls, EN 1536 and E

    Jan 1, 2014

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    Preserving The Foundations Of Some Of Boston?s Oldest Buildings

    By Michael J. Atwood

    Many buildings in Boston are founded on untreated wood piles, which can deteriorate and lose their structural capacity if groundwater levels are lowered below the tops of the piles, exposing the wood

    Jan 1, 2011

  • DFI
    Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill Dam

    By Eric M. Klein

    As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad

    Jan 1, 2006

  • DFI
    Thornton Road, Listerhills, Bradford

    By B. C. Slocombe

    A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces

    Jan 1, 1989

  • DFI
    Compressibility Behavior Of Tropical Peat Reinforced With Cement Column

    By Y. Duraisamy

    This paper presents the compressibility of tropical peat reinforced with cylindrical cement column. When a cement column installed vertically in peat, its compressibility was reduced because of the ha

    Jan 1, 2007

  • DFI
    Design Parameter For Jacked Pile

    By Sugie Prawono

    Jacked pile is the only piling system in which the load capacity of the pile, at any penetration depth, could be monitored directly during its installation process. Each installed pile could have a gr

    Jan 1, 1999

  • DFI
    Structural And Geotechnical Aspects Of Long Driven Piles For Urmiyeh Lake Causeway Bridge

    By Mohammad Eslami

    The Tabriz-Urmiyeh Highway shortens the distance of north-western cities of Iran by about 130 km, resulting in improved access and efficient transit between Iran and Europe through Turkey. The highway

    Jan 1, 2010

  • DFI
    Pittsburgh Steelers Stadium - Deep Foundations Case Study

    By Larry Rayburn

    In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified

    Jan 1, 2001

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • DFI
    Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.

    By Alexander J. Verstraeten

    The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev

    Jan 1, 1987

  • DFI
    Retrofitting Drainage Systems with Pressed-in Sheet Piles in Very Hard Soil in Southern California

    By Takefumi Takuma, Masashi Nagano, Christopher DellAringa

    Multiple agencies in Southern California are retrofitting and upgrading their levees to catch up with ever-advancing urbanization affecting the requirements for existing channels and levees in this se

    Jan 1, 2018

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997