    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved Hole

    By Wu Jian-tao, LI Guo-wei

    "The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen

    Jan 1, 2015

  • DFI
    Nicholson In The Neighborhood: Virginia’S North Hill Project

    By Dominic Ammon, Mark Rothbauer, Paul Landers P. E.

    Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct

    Oct 1, 2022

  • DFI
    Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology

    By A. Rod Kern, Michael A. McNicholas, Yaser Taheri

    Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing

    Jan 1, 2019

  • DFI
    Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface Challenges

    By Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo

    Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue

    Jan 1, 2019

  • DFI
    Creative Solution For Sydney Data Centre

    By M. Krzaninski, Y. Zou, A. Frost

    The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support

    Nov 1, 2022

  • DFI
    Water Powered Percussive Downhole Hammers – Energy Savings And Productivity

    By Shyam Chengalath, Johan Jeansson, Magnus Hörman

    Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm

    Sep 1, 2022

  • DFI
    Value Engineering Through Systematic Site Investigation and Design Optimization – A Case Study

    By Lu Yitan, Frances Badelow, Manish Tiwari

    "Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r

    Jan 1, 1900

  • DFI
    Assessment Of Impacts And Challenges Of Existing Codes Of The Bi-Directional Static Load Test (Bdslt)

    By Danielle Nhanqulumanga, Pranith Bhatt, Snehal Patel, Khadeeja Priyan

    The Bi-Directional Static Load Test (BDSLT) is a test that determines the capacity of piles when loaded under bi-axial static compression. In recent years the BDSLT has seen an increase in demand due

    Sep 1, 2022

  • DFI
    Emergency Stabilization to Maintain CN Rail Service

    By Rick Deschamps

    "Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site

    Jan 1, 2017

  • DFI
    Horseshoe Secant Compression Shoring System For Tunnel Repair

    By Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari

    A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten

    Oct 1, 2022

  • DFI
    The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling

    By Frank J. Purcell

    “Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou

    Nov 1, 2022

  • DFI
    Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff Wall

    By Gene Bryant, Wesley Schmutzler, Matteo Bertoni

    The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00

    Jan 1, 2019

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower

    By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich

    "The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element

    Jan 1, 2017

  • DFI
    Excavation Risks Adjacent to Existing Structures in Illinois and Urban Environments - Identifying and Managing Technical and Legal Issues

    By James P. Chivilo, Gregory R. Meeder, Scott J. DiFiore, Matthew H. Johnson

    New construction in metropolitan areas has direct impacts on immediate neighbors and abutters. While noise and dust are generally nuisance concerns, demolition, vibrations, excavation, and dewatering

    Jan 1, 2019

  • DFI
    Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction Fatigue

    By Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam

    Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions

    Jan 1, 2019

  • DFI
    Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur Metro

    By Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam

    Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria

    Sep 1, 2022

  • DFI
    An Analysis of LRFD for Helical Anchors

    By Ronaldo Luna, Donald Deardorff

    "The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963

    Jan 1, 2009

  • DFI
    Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile Foundations

    By Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi

    The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading

    May 1, 2022