Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult GeologyBy A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
Creative Solution For Sydney Data CentreBy M. Krzaninski, Y. Zou, A. Frost
The foundation solution for a data centre building in Sydney, Australia comprised two alternatives, the first of which incorporated the use of CFA piles founded in rock at approx. 27m depth to support
Nov 1, 2022
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Value Engineering Through Systematic Site Investigation and Design Optimization – A Case StudyBy Lu Yitan, Frances Badelow, Manish Tiwari
"Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r
Jan 1, 1900
-
Assessment Of Impacts And Challenges Of Existing Codes Of The Bi-Directional Static Load Test (Bdslt)By Danielle Nhanqulumanga, Pranith Bhatt, Snehal Patel, Khadeeja Priyan
The Bi-Directional Static Load Test (BDSLT) is a test that determines the capacity of piles when loaded under bi-axial static compression. In recent years the BDSLT has seen an increase in demand due
Sep 1, 2022
-
Emergency Stabilization to Maintain CN Rail ServiceBy Rick Deschamps
"Fountain Slide is located approximately 10 mi (16 km) northeast of Lillooet, British Columbia, Canada, within the Coastal Mountain Range, and has been locally active since the 1970s. The project site
Jan 1, 2017
-
Horseshoe Secant Compression Shoring System For Tunnel RepairBy Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari
A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten
Oct 1, 2022
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont TowerBy Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich
"The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element
Jan 1, 2017
-
Excavation Risks Adjacent to Existing Structures in Illinois and Urban Environments - Identifying and Managing Technical and Legal IssuesBy James P. Chivilo, Gregory R. Meeder, Scott J. DiFiore, Matthew H. Johnson
New construction in metropolitan areas has direct impacts on immediate neighbors and abutters. While noise and dust are generally nuisance concerns, demolition, vibrations, excavation, and dewatering
Jan 1, 2019
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur MetroBy Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam
Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria
Sep 1, 2022
-
An Analysis of LRFD for Helical AnchorsBy Ronaldo Luna, Donald Deardorff
"The use of load and resistance factor design (LRFD) is well documented since the 1960s for structural applications when it was first adopted into the American Concrete Institute Building Code in 1963
Jan 1, 2009
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile FoundationsBy Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022