Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Understanding the Relationship: Bitumen Production and the Athabasca River

    Overview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P

    May 1, 2009

  • CIM
    Recycling of Sm and Co from Magnetic Scraps

    By I. P. Barbosa, P. S. M. Soares, I. O. C. Masson

    "Permanent magnets have been applied extensively to several electronic products such as printers, TV sets, microphones, microcomputers and headphones, presently manufactured in large scale by industri

    Jan 1, 1997

  • CIM
    Narrow vein mine design at the Hoyle Pond mine

    By John G. Henning

    The Hoyle Pond underground mine is located in the Porcupine Gold Camp, 18 km east of downtown Timmins. Since the initiation of production in 1985, the operation has produced in excess of 1.9 million o

    Oct 1, 2004

  • CIM
    Characterization of red mud aggregate populations generated under shear conditions

    By G. Simard, M. J. Gagnon, A. Charette, G. Péloquin

    "In the Bayer process, flocculants are introduced in the feed well to enhance the aggregation of red mud particles. To gain a better understanding of the flocculation process taking place in the feed

    Jan 1, 2002

  • CIM
    Human Aspects of Automation - The Diamond Drilling Case Study

    By Helen Francis

    Over the last decade, lower ore grades and deeper mine environments have demanded that mining companies develop new technologies (tools and processes) to ensure a mine?s economic sustainability. At In

    May 1, 2002

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)

    By W. Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t

    Jan 1, 2006

  • CIM
    Kiruna mineral processing starts underground — Bulk sorting by LIF

    By Å. Kruukka, H. F. Broicher

    The iron ores of the Kiruna mine in Sweden are of exceptional quality except for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low

    Jan 1, 2002

  • CIM
    The Brewery Creek Heap Leach Project.

    By Brad Thrall

    "Viceroy Resource Corporation of Vancouver, B.C. has recently developed the Brewery Creek Mine, an open pit heap leach gold mine 55km East of Dawson City in Yukon, Canada. Mineable reserves are 17.1 m

    Jan 1, 1997

  • CIM
    Water Utilization by Oil Sands Mines in Alberta

    By Leslie F. Sawatsky

    Raw water import requirements for oils sands mines depends mainly on factors such as ore processing rate, ore material characteristics, tailings processing technology, tailings storage systems, proces

    May 1, 2004

  • CIM
    A western Canadian coal producer's viewpoint

    By G. Capobianco

    "The coal industry is an important part of Canada's economy - as an energy source, employer, and generator of export earnings. Coal comprises 71% of our fossil energy and with rapidly advancing h

    Jan 1, 1988

  • CIM
    Welding developments for Arctic structures

    By J. G. Price

    "The paper reviews state-of-the art welding processes and consumables for structural and pressure equipment applications in offshore environments, particularly the Arctic. Optimum selection of consuma

    Jan 1, 1987

  • CIM
    Achieving a Great Start-Up: Action Plan to Maximise Your Chances of Success

    By S. Bellec, P. Champagne, J. Châteauneuf, A. Berton, S. Fortier

    "The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well

    Jan 1, 2016

  • CIM
    Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold Climates

    By T. R. Wildeman

    "At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,

    Jan 1, 1992

  • CIM
    Mechano-Column Flotation

    By Turgut Yalcin

    "High-grade concentrates are achieved in flotation columns primarily due to the use of thick froth layers and wash water, both of which facilitate the drainage of hydrophilic minerals from the froth.

    Jan 1, 1997

  • CIM
    Spray Drying of Mineral Concentrates

    By R. J. MacLeod

    "INTRODUCTIONThe removal of water or liquid from slurries and solutions is a procedure generally present in many process industries. This has prompted the development of many mechanical and thermal de

    Jan 1, 1972

  • CIM
    Documented Fortran programs for ball-mill modeling

    By D. Laguitton, D. Hodouin, V. K. Gupta, R. Spring

    "The CANMET SPOC project aims at inducing progress in process evaluation and optimization by developing user oriented software based on state-of-the-art theory. The present work is the result of a joi

    Jan 1, 1984

  • CIM
    Control of Size Distribution of the Ore Feeding a Semi Autogeneous Grinding Mill

    By Claude Bazin, François Robichaud

    "The control of the operation of semi autogeneous grinding (SAG) mills is mainly achieved through adjustments of feed rate, water addition and speed of rotation. With the introduction of image based s

    Jan 1, 2013

  • CIM
    Use of Thickening for Sustainable Management of Mine Tailings

    By Catherine N. Mulligan

    Thickening of mine tailings is a relatively new concept for their sustainable management. Removal of water from the tailings to form a paste instead of slurry disposal decreases environmental and geot

    May 1, 2007

  • CIM
    Treatment of Talcose Molybdenite Ores

    By G. I. Mathieu, R. W. Bruce

    Flotation schemes for the separation of molybdenite from other minerals are based on utilizing the Inherent hydrophobicity of molygdenite (Fuerstenau1). This natural floatability was attributed to the

    Jan 1, 1974