Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approachesBy A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak
A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic
Jan 1, 2007
-
How much is TOO much? A statistical look at bench flotation data and re-circulating chemical concentrationsBy Thomas R. Larson
"Many concentrators use re-circulating “plant” water for dilution in their flotation circuits. However, if crusher dust suppressants, ball mill grinding aids, or even agitator bearing grease are intro
Jan 1, 2002
-
Low-Grade Geothermal Potential of the Regina - Moose Jaw Area, SaskatchewanBy L. W. Vigrass
Porous and permeable rocks deeply buried in sedimentary basins contain immense volumes of hot water with the potential to supply low-grade heat energy. A part of Canada with sizeable potential for low
Jan 1, 1979
-
An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 mBy Wendy L. Naysmith
This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to
Oct 1, 2010
-
Pilot Scale Testing of a Lead-Zinc Ore Aljustrel ProjectBy Jeffiey B. Austin, Maurice Tagami
"The ores of the Iberian Pynte Belt are typically massive sulphide ores with very fine grained mineral textures. EuroZinc Mining Corporation is currently evaluating one of the massive sulphide deposit
Jan 1, 2000
-
Necessity Driving Change and Improvement to the Cleaner Circuit at Lumwana Copper ConcentratorBy G. Cordingley, A. Mwanza
Lumwana is an open pit Copper mine located in the Northwestern Province of Zambia approximately 80 km west from the provincial capital of Solwezi, approximately 300 km northwest from the Copperbelt an
Jan 1, 2014
-
Environmental Factors Related to the Development of a New Uranium RefineryBy J. P. Jarrell
Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus
Jan 1, 1979
-
Selection of a Process Flowsheet to Treat Old Copper-Containing Tailings with the use of Process MineralogyBy S. V. Ulianov, A. Y. Senchenko, E. M. Kurchevskaya
"A process sample of old copper-containing tailings (-2.0+0 mm) from an iron-ore plant was tested in TOMS institute in order to develop a process for copper concentrate production. The study of tailin
Jan 1, 2016
-
Computer process control for the Kudremukh Iron Ore Company LimitedBy V. Balakrishnan, A. Hewitson
"The Kudremukh Iron Ore Company Limited, a government of India enterprise, has constructed iron ore mining, crushing, handling and concentrator facilities at Kudremukh, in southwest India. Concentrate
Jan 1, 1984
-
VXP2500 Stirred Mill Optimization at Casmyn Mining Turk MineBy D. Rahal, I. Shah, B. Hines, S. Reddick
"The development of stirred milling technology has proven to be an enabling technology in fine grained metallic deposits. The increased grinding efficiency allows for the economic size reduction requi
Jan 1, 2014
-
The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of CanadaBy Claude Deveau
"With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p
Jan 1, 2000
-
The use of wetlands for effluent polishing at Placer Dome, Campbell MineBy Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
Coarse Lead Flotation Practice at PolarisBy R. Simkus, J. K. Gowans
Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation
Jan 1, 1984
-
Is Your Management Control Loop FunctioningBy John D. Campbell
"IS YOUR MANAGEMENT CONTROLLOOP FUNCTIONINGMineral processors make use of hundreds of control circuits in their mills, process plants, smelters and refineries, to optimize throughput and recovery and
Jan 1, 1985
-
Base-Metal Deposits of the Bathurst-Newcastle District: Characteristics and Depositional ModelsBy Steven R. McCutcheon
ABSTRACT - The Bathurst-Newcastle district, a subcircular area approximately 50 km in diameter, contains 37 massive-sulfide Zn-Pb-Cu deposits that have defined tonnages, and has 58 additional signific
Jan 1, 1992
-
Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine CaseBy Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart
"Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi
Jan 1, 2015
-
Innovations in Gold and Silver Recovery: World OverviewBy Hans von Michaelis
"INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i
Jan 1, 1985
-
A regressive mode of highwall failure in coal strip minesBy B. Stimpson, K. Kosar, K. Barron
"A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t
Jan 1, 1986
-
Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problemsBy Stuart Elliot
Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over
Nov 1, 2011
-
Deep Bed Thickener Operation at the EKATITM Diamond MineBy T. G. Paradis, C. A. Mohns
"This paper summarizes the Wren CAT (Clarifier and Accelerated Thickener) deep bed thickener operation at the EKATITM Diamond Mine in Canada’s Northwest Territories. EKATITMs’ thickener project is pre
Jan 1, 2000