Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The coarse particle recovery process

    By G. S. Hill, B. J. Huls

    This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate ana

    Jan 1, 2006

  • CIM
    Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation Method

    By G. Zhu

    The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist

    May 1, 2008

  • CIM
    Precipitation of Crystalline Svabite (Ca5(AsO4)3F) and Svabite/Fluorapatite (CA5(ASO4)X(PO4)3-XF) Compounds and Evaluation of their Long-Term Arsenic Fixation Potential

    By M. -C. Noël, G. P. Demopoulos

    In this work the formation and environmental stabilization potential of arsenate-containing fluoroapatites is considered. In particular in this research various compounds were precipitated from synthe

    Jan 1, 2014

  • CIM
    High Pressure Grinding of Gold Ore HPGR Demonstration at Newmont’s Lone Tree Mine

    By Polysius AG

    "The Lone Tree demonstration was an important milestone in bringing High Pressure Grinding Roll (HPGR) technology into hard rock applications in the mining industry. HPGRs have become standard equipme

    Jan 1, 2005

  • CIM
    Chemistry of paste backfill

    By Jacques Ouellet, Ferri Hassani

    "Within the mining industry paste backfill technology has evolved over the last two decades. This technology aims at producing safe and cost effective backfill of high strength. When used as cemented

    Jan 1, 2002

  • CIM
    A Focus on Variability within the Orebody for Improved Design of Flotation Plants

    By Glenn Kosick, Roger Amelunxen, Glenn Dobby

    "The variability in flotation response within an orebody is often a significant problem to address during the design phase of a flotation circuit. In addition, for existing operating plants, the reaso

    Jan 1, 2002

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    Development and Testing of a More Effective Froth Handling Pump

    By R. J. Visintainer, W. L. Whitlock

    "Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre

    Jan 1, 2012

  • CIM
    Automatic Sorting of Minerals: Current Status and Future Outlook

    By T. P. R. de Jong, H. Harbeck

    "This contribution reports recent mineral sorting experience and lists the opportunities of the newest generation of automatic sorters with a special focus on electromagnetic detection and Xray transm

    Jan 1, 2005

  • CIM
    Reducing CIP Tails Solution Losses at Goldcorp’s Campbell Processing Facilities

    By Monique Pharand, Jeet Basi, Simon Hille

    "High quality activated carbon is essential in the recovery of gold in Carbon-in-Leach (CIL), Carbon-in-Pulp (CIP), and Carbon-in-Column (CIC) circuits. Goldcorp’s Campbell complex at Red Lake Gold M

    Jan 1, 2016

  • CIM
    Iron and steel making in the third millennium

    By J. P. Sancho, L. F. Verdeja, J. I. Verdeja

    "This paper analyzes the present state of the different processes competing to keep their market shares within the future iron and steel business sector.The continuous transformations in the steel mak

    Jan 1, 2002

  • CIM
    Tunnelling in Horizontally Laminated Ground

    By Matthew A. Perras

    With growing populations, infrastructure projects are utilizing underground space to expand transportation networks, water supply and sewer disposal systems and hydropower facilities. These new projec

    May 1, 2009

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016

  • CIM
    Adaptive control in mineral processing

    By K. Najim, D. Hodouin

    "The raw ores which are processed in mineral processing plants exhibit very strong variations of their physical and chemical properties. As a consequence, the performances of the comminution and separ

    Jan 1, 1992

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    A Contribution for the Improvement of a Rotary Sample Divider for Iron Ore Concentrates Sampling.

    By M. Poirier, J. H. Mbouche

    "The research question of the present work is the following: at which speed should a rotary sample divider operate in order to produce representative samples of iron ore concentrate? In order to solve

    Jan 1, 2016

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options

    By Deon van Tonder, Chuck Edwards

    "Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco

    Jan 1, 2013

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Residual Effects of Lognormality in Concentrator Data

    By Norman O. Lotter, André R. Laplante

    "The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim

    Jan 1, 2005