Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Indusmin Limited Dust Abatement

    By D. E. Gorse, R. G. Anderson

    "Indusmin's history dates back to 1937 when they developed the Blue Mountain Nepheline Syenite deposit at Nephton, Ontario, and began supplying material for the glass, fiberglass, paint, ceramics and

    Jan 1, 1980

  • CIM
    Improving the Material Flow in the Fox Mine Concentrate Bins

    By J. Chlopas, D. J. Barratt, M. V. Sharp

    "This paper describes the modifications made to the Fox Mine copper concentrate bin in order to obtain a continuous flow condition. The design of these modifications is based on test results obtained

    Jan 1, 1978

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • CIM
    Borehole seismic survey for mineral exploration: Case histories from Norman West and Halfmile Lake

    By G. Bellefleur, K. Stevens, E. Adam, D. Synder, G. Perron, C. Müller

    The Downhole Seismic Imaging consortium was initiated by the Geological Survey of Canada and three Canadian mining companies to assess the usefulness of borehole seismic techniques for the exploration

    Jan 1, 2004

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Utilizing Strain Criteria to Predict Highwall Stability Performance

    By H. Warren Newcomen

    Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents

    May 1, 2004

  • CIM
    The identification of mineralized granitoid plutons from ore-element distribution patterns in regional lake sediment geochemical data

    By P. H. Davenport

    "The ore-element patterns in regional lake sediment geochemical survey data from four areas of Newfoundland containing granite-related mineralization reveal characteristics which can be used to identi

    Jan 1, 1982

  • CIM
    Goldcorp Inc., Red Lake Mine Design and Commissioning

    By R. Tyreman, G. Ritson

    "The Red Lake Mine is situated in Balmer Township, Red Lake area in northwestern Ontario. It is an underground mine that has been in production since 1948. The property was originally known as the Dic

    Jan 1, 2001

  • CIM
    Sustainable Geothermal Energy Recovery from Mines

    By Charlie Graham, Helen Shang, Ashley Scott, Andrew Hall

    "Approaches to Energy Recovery• Upgrading for electricity generation - steam turbines• Direct extraction- process improvement or space heating- support medium for animal or plant growth– fish or micro

    Jan 1, 2012

  • CIM
    Comparison of Flotation Grade Dynamics Enabled By Real-Time Measurement

    By F. E. du Plessis

    "The distinction between data suitable for process control and data subject to aliasing only becomes quantifiable with the availability of rapid real-time measurements. Expecting the dynamics of flota

    Jan 1, 2012

  • CIM
    Process design considerations for the fluidized bed technology applications in the nickel industry

    By K. Adham, C. Lee

    Over the last forty years, a number of specific fluidized bed applications in nickel extraction have been developed for commercial use. Five important processes have gained particular acceptance, name

    Jan 1, 2004

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009

  • CIM
    Experimental and Numerical Investigations of the Fluid Flow in a Hydrocyclone in the Absence of an Air Core

    By J. R. Kadambi, E. Kucukal, J. Furlan

    "Hydrocyclone separators are used in various industrial applications, including mining milling and tailings systems, in order to separate or classify solid particles and liquid droplets from multiphas

    Jan 1, 2016

  • CIM
    Milling at Agnico-Eagle Gold Mines Limited

    By K. Mikulash

    "Agnico-Eagle Mines Limited is located at Joutel in North-Western Québec. The mine is about four miles north-west from the town on the left bank of the Harricana River. The present mining is 1,800 fee

    Jan 1, 1976

  • CIM
    Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration

    By J. Asfahani

    "The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration

    Jan 1, 2009

  • CIM
    Mining Operations and Slurry Pipelines Update and Future

    By R. A. Hill, J. D. Pitts

    "Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio

    Jan 1, 1978

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal Characteristics

    By Derek H. C. Wilton, David T. W. Evans

    "Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc

    Jan 1, 2000

  • CIM
    Advances in the Use of Thin, Spray-on Liner Systems

    By James F. Archibald

    In historic mining practice, typical thin liner support systems have been considered to comprise non-reinforced or mesh-reinforced shocrete linings. In the early 1990?s, development of alternate forms

    May 1, 2002