Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The safety imperative—transforming the workplace to protect people (06bb12c8-6d2f-4f7c-beb1-5bcbdcf9392b)By G. Winkel
"Safety conditions in industry have greatly improved over time. However, around the world, in Canada, and in each province or territory, people are still the victims of serious industrial accidents. T
Jan 1, 2004
-
Rock Mass Characterisation and Stope DesignBy Karina Forster
Rock mass characterisation is a critical component of effective stope design. Unexpected excessive stope dilution or uneconomic stope sizes can be the result of rock mass characterisation that is not
May 1, 2006
-
Continuous Training – Insurance for Sustainable OperationBy Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala
Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co
Jan 1, 2019
-
Stochastic Simulation of Open Pit Pushbacks with a Production SimulatorMaterial scheduling, sequencing planning and execution are the core tactical mine plan for achieving production targets that maximize the objective function of any mine production entity. This objecti
May 1, 2004
-
Space Technology Solutions: An Opportunity for the Mining IndustryBy Bob Robinson
In 1990, the European Space Agency (ESA) initiated a technology transfer program to stimulate the wider use of technology developed by the European and Canadian space communities. This paper focuses o
May 1, 2001
-
A review of binder materials used in stabilized backfillsBy J Petrolito
"To improve the economic and environmental performance of underground mining operations, it is common practice to return the metallurgical waste material underground as backfill. This is called hydrau
Jan 1, 2005
-
Multiparameter Petrophysical Characterization of an Orebody: An Exploration Case HistoryBy E. Bongajum
We present results from petrophysical studies to characterize a Zn-Pb-Ag deposit in Nash Creek, New Brunswick. The measurements are part of an integrated study that includes geological and geophysical
May 1, 2009
-
Emperical Design of Stopes for the Lower Rodeo OrebodyBy Denis Thibodeau
The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the
May 1, 2002
-
Innovative Partnerships that Improve IT Support for Mine Planning and Management ProcessesBy Rick Moignard
Relationships between Information Technology providers and their clients are often segmented according to job specific tasks. As a consequence, technology providers tend to focus on automating repetit
May 1, 2006
-
A Two-Phase Backfill Approach to Dilution Control at the Doyon MineBy Emilie S. Williams
The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping
Oct 1, 2004
-
Flowsheet Design Using Flotation Rate, Selectivity and RTD DataBy Manqiu Xu, Peter Wells, Gord Bacon
"A methodology is proposed for milling flowsheet design using flotation rate, selectivity and residence time distribution data. The flotation rate data and the difference in flotation rates between th
Jan 1, 2005
-
Estimation of Iron Ore Resources Integrating Diamond and Percussion DrillholesBy Jacques Deraisme
The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be
Oct 1, 2009
-
How to be a SurvivorBy W. G. Johnson
"As we move into 1983, Canada is not only in a deep recession, there are major changes taking place.International competition is growing fiercer.Major core industries such as automobile, steel, mining
Jan 1, 1983
-
Flin Flon MineBy Geology Staff, C. H. Stockwell
"The Flin Flon base metal mine, owned and operated by the Hudson Bay Mining and Smelting Company, is on the Manitoba-Saskatchewan interprovincial boundary at a point 400 miles north of the Internation
Jan 1, 1954
-
Talc Problems Encountered in the Mining and Milling of Kanichee Nickel-Copper OreBy F. M. Makarinsky
"SynopsisThe Kanichee open pit mine and milling complex is situated approximately four air miles north-west of Ternagami, Northern Ontario, in Strathy Township. Mining and milling production commenced
Jan 1, 1975
-
A New Rheoforming Processing Of Semi-Solid Aluminum AlloysBy J-L. Tang
A new rhcoforming processing of Al alloys with component shaping systems apart from slurry preparation systems is experimentally exploited, using the reversible multilevel-speed electromagnetic stirre
Jan 1, 2007
-
Mines Business Planning at the Vale Inco Ontario OperationsBy Richard Jundis
At the Vale Inco Ontario Operations, the working environment is rapidly evolving with organizational changes, new business systems and software tools. These changes are required in order to meet today
May 1, 2009
-
An international review of the use and testing of the wire ropes used in mine hoistingBy J. E. Udd
"In early 2000, CANMET-MMSL was engaged by the Ontario Ministry of Labour (OMOL) to conduct an international study of the practices, in several key mining jurisdictions, of determining the criteria th
Jan 1, 2004
-
The Role of Oxygen Demand in the Flotation of a Complex Sulphide Ore (7422717d-0c76-4628-a6fb-8038409d5379)By C. Carlson, W. Muir
"The oxygen demand of the complex lead-zinc-iron feed at the Cyuro Anvil concentrator was determined denendent on the cyanide ion con-contration of the pulp. By redistribution of the cyanide [ ] the g
Jan 1, 1976
-
Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper MineBy M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh
"The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.
Jan 1, 1999