Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Applicability of Low-Temperature Reduction to Certain Ontario Iron OresBy J. R. Gordon
I-Introduction The possibility of adapting low-temperature reduction methods to the treatment of iron ores has been suggested on numerous occasions. Papers published on the subject include, notably,
Jan 1, 1933
-
Evaluation of the Tower Mill as Regrind MachineBy J. M. Menacho, J. M. Reyes
"Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te
Jan 1, 1989
-
Namew Lake Mill ProjectBy K. Hoover, G. Labarre, S. Rantanen
"As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan
Jan 1, 1990
-
The Application of the Stackcell Technology for Fine Coal RecoveryBy E. S. Yan, R. Graley
"The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell
Jan 1, 2013
-
Millerite and Its Impact on Cu/Ni SeparationBy F. D. Ford, Z. Dai
"Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6
Jan 1, 2011
-
Laboratory Testwork of Mixed Xanthates for the Raglan OreBy Norman O. Lotter, Simon Yu, Tony Deng, Antonio Di Feo
"Xstrata Nickel’s Raglan operation, northern Québec, achieved paymetal recovery gains in 2007 by switching the collector from potassium amyl xanthate to sodium isobutyl xanthate. To follow on from tha
Jan 1, 2010
-
Detection of Kaiser Effect in Marbles Under Tensile StressesBy Xie Qiang
It is known that the stress state inside rock discs under Brazilian tests is neither simple compression nor tension, but a complex combination of both stress types, as well as for a beam subjected to
May 1, 2009
-
Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)By C. S. Maggs, L. Shwydiuk, H. W. Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
Jan 1, 2003
-
Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mineBy U. Olsson, M. Ramström
"The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen
Jan 1, 2005
-
Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface LayersBy Martin Kesting
The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco
Oct 1, 2009
-
Grinding media evaluation at Brunswick MiningBy R. Grant, C. Bazin
"Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t
Jan 1, 1994
-
Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)By Dayang Datu Khalil, Charle Amoah, Fred Kock
Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe
Jan 1, 2012
-
Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication BackboneBy Christoph Mueller
Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi
May 1, 2006
-
Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”By Robert E. McIvor
"“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g
Jan 1, 2013
-
Mine Planning Guidelines for Developing Sustainable Closure Drainage SystemsBy Leslie F. Sawatsky
Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie
May 1, 2004
-
National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should KnowBy Tony Lipiec, Greg Gosson
"When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun
Jan 1, 2010
-
Processing of Calcium CarbonatesBy David R. Skuse, Jacek A. Kostuch, Steven M. Fortier
"Particulate ground calcium carbonate (GCC) is used as a filler and coating pigment in a wide range of applications including papers, paints, plastics and films. In this paper we will overview the req
Jan 1, 2004
-
New Technology Provides Expanded Mine Design OptionsBy Michael J. Kelly
IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re
Oct 1, 2010
-
Chemical Additives for Improving the Wet Grinding of OresBy R. Samuels, R. Klimpel
"IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou
Jan 1, 1979
-
Huckleberry Mines Ltd. Process Design and Project StartupBy Greg Rasmussen
"Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b
Jan 1, 1998