Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Applicability of Low-Temperature Reduction to Certain Ontario Iron Ores

    By J. R. Gordon

    I-Introduction The possibility of adapting low-temperature reduction methods to the treatment of iron ores has been suggested on numerous occasions. Papers published on the subject include, notably,

    Jan 1, 1933

  • CIM
    Evaluation of the Tower Mill as Regrind Machine

    By J. M. Menacho, J. M. Reyes

    "Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te

    Jan 1, 1989

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • CIM
    The Application of the Stackcell Technology for Fine Coal Recovery

    By E. S. Yan, R. Graley

    "The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell

    Jan 1, 2013

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    Laboratory Testwork of Mixed Xanthates for the Raglan Ore

    By Norman O. Lotter, Simon Yu, Tony Deng, Antonio Di Feo

    "Xstrata Nickel’s Raglan operation, northern Québec, achieved paymetal recovery gains in 2007 by switching the collector from potassium amyl xanthate to sodium isobutyl xanthate. To follow on from tha

    Jan 1, 2010

  • CIM
    Detection of Kaiser Effect in Marbles Under Tensile Stresses

    By Xie Qiang

    It is known that the stress state inside rock discs under Brazilian tests is neither simple compression nor tension, but a complex combination of both stress types, as well as for a beam subjected to

    May 1, 2009

  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • CIM
    Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mine

    By U. Olsson, M. Ramström

    "The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen

    Jan 1, 2005

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • CIM
    Grinding media evaluation at Brunswick Mining

    By R. Grant, C. Bazin

    "Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t

    Jan 1, 1994

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication Backbone

    By Christoph Mueller

    Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi

    May 1, 2006

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    Mine Planning Guidelines for Developing Sustainable Closure Drainage Systems

    By Leslie F. Sawatsky

    Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie

    May 1, 2004

  • CIM
    National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should Know

    By Tony Lipiec, Greg Gosson

    "When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun

    Jan 1, 2010

  • CIM
    Processing of Calcium Carbonates

    By David R. Skuse, Jacek A. Kostuch, Steven M. Fortier

    "Particulate ground calcium carbonate (GCC) is used as a filler and coating pigment in a wide range of applications including papers, paints, plastics and films. In this paper we will overview the req

    Jan 1, 2004

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Huckleberry Mines Ltd. Process Design and Project Startup

    By Greg Rasmussen

    "Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b

    Jan 1, 1998