Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    History of Mineral Exploration in New Zealand

    In this address I look back over the past 40 years of mineral exploration in New Zealand û essentially the period since the Second World War (ie since 1945). It was the period of my personal involveme

    Jan 1, 1987

  • AUSIMM
    Taxation Neutrality in Mining

    The Government signalled its intention in the Economic Statement on 17 December 1987 to improve the fairness of the taxation system and to facilitate the process of economic adjustment by: removing t

    Jan 1, 1988

  • AUSIMM
    Enhancement of the Becher Process by Ball Milling

    Ilmenite (FeTiO3) is the primary global source of titaniumdioxide which is commonly used as a whitening agent in papermanufacture and a pigment in paint manufacture. In WesternAustralia ilmenite is pr

    Jan 1, 1997

  • AUSIMM
    Green Policies at Home and Abroad

    Green policies have gained momentum since the 1972 Stockholm, Environment Conference. The environmental movement has influenced political initiatives both in New Zealand and abroad. Governments and in

    Jan 1, 1990

  • AUSIMM
    Isaac River Cumulative Impact Assessment of Mining Developments

    By R Hardie, J Crerar, J Merritt, B Kirsch

    Longwall mining and related subsidence, and watercourse diversion for surface mining operations have the potential to impact on fluvial geomorphic processes and the health of river systems. This is ev

    Jan 1, 2009

  • AUSIMM
    Recycling of Process Water in Sulfides Processing and Flotation Selectivity

    Recycling of Process Water in Sulfides Processing and Flotation Selectivity

    Sep 13, 2010

  • AUSIMM
    Relationships of Intrusion, Wall-Rock Alteration and Mineralisation in the Batu Hijau Copper-Gold Porphyry Deposit

    By P Mitchell, J Proffett, I Munajat

    Batu Hijau is an island arc porphyry copper-gold deposit located in the southwest corner of Sumbawa Island in the Sunda-Banda archipelago of Indonesia. Southwest Sumbawa Island is underlain by Early T

    Jan 1, 1999

  • AUSIMM
    The Surface Plant at the Zinc Corporation Mine, Broken Hill

    (This paper reviews the reasons for and the principles followed in designing and constructing complete new surface works at the mine of the Zinc Corporation Limited, Broken Hill, New South Wales, and

    Jan 1, 1940

  • AUSIMM
    Copper Separation from Iron and Nickel-Iron Sulfide Concentrates by a Double-Roast, Acentonitrile Leaching Process

    By Parker A. J, Grimsey E. J

    Studies have been carried out on the dead roasting of a copper-iron and a copper-nickel-iron sulfide concentrate, followed by segregation roasting with coal and leaching with either curpric sulfate in

    Jan 1, 1983

  • AUSIMM
    The Reaction of Anfo Explosives with Mineral Sulphides

    Ammonium nitrate-fuel oil (ANFO) explosives are unstable in hot, reactive sulphide-rich ground at Mount Isa. Under certain conditions associated with background heat, moisture, and chemical impurities

    Jan 1, 1968

  • AUSIMM
    Paper No. 127. Presidential Address.

    Taking the Presidential chair of the Australasian Institute of Mining Engineers, my first duty is to thank you for the high honour and position you have conferred on me. A position entailing the highe

    Jan 1, 1903

  • AUSIMM
    A Beta-Gamma Counting Method for Radiometric Determination of Uranium

    A short account is given of the theory and practice of determining the true U3O8 content of ore samples by the determination of the beta and gamma activities separately, using the method of Eichholz a

    Jan 1, 1957

  • AUSIMM
    Inception and Evolution of Cenozoic Arc-Type Volcanism in Northern New Zealand

    By P M. Black, T Itaya

    Arc-type volcanic activity has been a major feature of the late Cenozoic geological evolution of the Pacific-Australian plate boundary in the northernNew Zealand region. The time/space distribution pa

    Jan 1, 1995

  • AUSIMM
    Bulk Sampling of Complex Gold Deposits - Material Characterisation and Program Design and Management

    By I M. Platten, Y Xie

    Complex gold deposits are generally characterised by variable geometries, strong structural controls on grade distribution and a high-nugget effect. The use of diamond drilling and fire assays in this

    Jan 1, 2008

  • AUSIMM
    Notes on the Metallurgical Design of Tungsten-Carbide Rock Bits

    A comparatively new and very promIsmg field for applying cemented tungsten-carbides is in the mining and quarrying industries. The economic advantages of this unique engineering material over the conv

    Jan 1, 1950

  • AUSIMM
    Mine Waste Risk Minimisation by Integrated Waste Management and Process Optimisation

    By D Brett

    "Mine waste storages including tailings dams and waste rock dumps represent arguably the biggest risk on a mine site from both physical and geochemical viewpoints, related firstly to structural stabil

    Jul 15, 2013

  • AUSIMM
    A Proposed Modification of the Square Set

    By A. J. MOORE

    When the writer first saw the square-set timbering, he was at once impressed with the fact that the frames made by the sets, along the lode and across it, were composed of panels with rectangular open

    Jan 1, 1912

  • AUSIMM
    Mining and Ore-Treatment at the Talisman Mine, Karangahake, NZ

    THE Talisman mine is situated on the Waitawheta (pronounced Wytaffetta) river just above its junction with the Chinemuri (pronounced Chinnemurre) river near Karangahake, NZ. The explored reef-bearing

    Jan 1, 1912

  • AUSIMM
    Auxiliary ventilation design – why and how mines waste so much power on inferior systems

    By D J. Brake

    There has been a strong trend over the past decade in hard rock mines towards the use of very high powered auxiliary (or secondary) fans; in many mines, the installed power for the secondary ventilati

    Aug 28, 2017

  • AUSIMM
    Gold Ore Treatment at Macraes Flat

    Macraes Mining Company Limited operates a 2.1 million tonnes per annum gold processing plant at Macraes Flat, Otago. This uses a conventional CIL route to treat oxide ore, and a flotation, grind, CIL

    Jan 1, 1992