Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotiveBy A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté
"A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr
Jan 1, 2004
 - 
                    
                Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field ControlsChoosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra
Jan 1, 1998
 - 
                    
                IC 8861 Alumina Availability - Domestic - A Minerals Availability System AppraisalBy Gary R. Peterson
In order to determine the potential availability of alumina to feed U.S. aluminum smellers, the Bureau of Mines evaluated 39 domestic mines and deposits of bauxite, alunite, and high-alumina clays and
Jan 1, 1981
 - 
                    
                IC 6879 Sand And Gravel Excavation: Part VI: Mining Methods ? IntroductionBy J. R. Thoenen
This circular is part 6 of the third paper (entitled "Excavation") of a series summarizing the technical problems involved in the production and preparation of sand and gravel. Part 1 discussed the us
Jan 1, 1936
 - 
                    
                IC 9224 Effects Of Environmental Stressors On Vigilance PerformanceBy J. C. Duchon
The U.S. Bureau of Mines is conducting human factors research for the purpose of reducing accidents and improving the person-machine interface found in surface and underground mining operations. Miner
Jan 1, 1989
 - 
                    
                Thickener Modelling - Incorporating Shear EffectsThickener Modelling - Incorporating Shear Effects
Sep 13, 2010
 - 
                    
                
             - 
                    
                Development of an Iron Ore Concentrate Fines Recovery Process from Copper TailingsBy Lutz Markworth, Fernando Parra, Wolfram Jaspers
"The worldwide demand of iron ore and the depletion of the high-purity deposits make it necessary to recover ores in increasingly fine size fractions or low Fe content in the feed material. Impurities
Jan 1, 2008
 - 
                    
                Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mineBy D. Ouellet, G. Gagnon, B. Simser, V. Falmagne
The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli
Jan 1, 2004
 - 
                    
                Fundamental Analysis Of The Interaction Between Overburden Behaviour And Snook Stability In CoalminesBy J. N. Van der Merwe
In the process of pillar extraction, pillars are seldom if ever extracted completely. The pillar remnants, or snooks, play an important role in the extraction process. At the working face, they need t
Jan 1, 2005
 - 
                    
                Monitoreo y control de sismicidad inducida en la U.M. El PorvenirBy Aquiles Vivar
Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución
Sep 9, 2007
 - 
                    
                The ANZAC Minerals Industry - What Future?The importance of the minerals industry to any economy is clearly demonstrable. Its raw materials and products are the foundation of modem society and they have shaped the history of mankind from preh
Jan 1, 2000
 - 
                    
                Deterministic Expert Systems : A New Planning Tool for Project DevelopmentProject developent proceeds by increasingly detailed studies addressing overall project returns through an analysis of the substance, risks and costs associated with the following elements: ò Reserv
Jan 1, 1989
 - 
                    
                Caving, Seismicity, and Mine Design in Four Utah MinesBy Hamid Maleki
Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in
Jan 1, 2006
 - 
                    
                The Framework Convention on Climate Change - Implications for the Minerals IndustryThe Framework Convention on Climate Change (FCCC) places serious obligations on New Zealand as a signatory nation. This paper examines the nature of the FCCC, New Zealand
Jan 1, 1994
 - 
                    
                Mining Schools in Relation to the Mining IndustryEARLY in 1911 the Public Service Board of New South Wales suggested the advisability of inaugurating a School of Mines at Broken Hill, arid made inquiries to determine how such an institution should b
Jan 1, 1912
 - 
                    
                Derivation Of Mineral Processing Environmental Sustainability Indicators Using A DEA Weight-Restricted AlgorithmBy I. Tsolas
This paper presents the use of non-parametric approach (i.e., data envelopment analysis, DEA) for the development of environmental sustainability indicators in mineral processing using environmental,
Jan 1, 2008
 - 
                    
                Methods Of Constructing Concrete Piles On Heavily Contaminated SitesBy N. C. Matheson
The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c
Jan 1, 1989
 - 
                    
                Stope Filling at North Mount Lyell MineIN the irregularly shaped ore-bodies of the North Mount Lyell mine by overhead stoping, the method of filling the is a special feature.The situation of the mine two miles from the smelter and mill at
Jan 1, 1927
 - 
                    
                Pit Wall Failures On ?Unknown? Structures (76621150-30cb-4052-b037-75f5ff3cf933)A number of impending and actual pit wall failures have been observed and documented, which have been interpreted to initiate on newly generated structural features. This infers failure through intact
Jan 1, 2006