Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Injection Techniques for Cost-effective Stabilization of Brittle and Faulted Strata Zones
By Martin Bolesta
The use of strata injection as a means of stabilizing brittle and heavily stressed ground as well as faulted zones is now state-of-the art technology. Users are obliged to select the right combination
Jan 1, 2001
-
Site Characterization For Ultra-Close Multi-Seam Mining
By Yingxin Zhou
Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl
Jan 1, 1990
-
Remote Detection Of Abandoned Mine Workings Using Radio Imaging Method Techniques
By James G. Schotsch
Unmapped abandoned mines are hazards for under¬ground mines, surface mines and surface structures. The Radio Imaging Method (RIM) provides a cross borehole technique to remotely detect abandoned mine
Jan 1, 1990
-
Pillarless Longwall Mining For Multiple Seams
By Victor V. Nazimko
Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p
Jan 1, 1994
-
Investigation of Fully Grouted Roof Bolts Installed Under In Situ Conditions (8fabb507-7dbd-4e7d-b9c9-518c3be86281)
By Craig Compton
The The National Institute for Occupational Safety ane Health (NIOSH) Pittsburgh Research Laboratory (PRL) is continuing to investigate the behavior of fully grouted roof bolts in the weak roof rock o
Jan 1, 2005
-
Floor Failure Induced By Lateral Stress Ahead Of Longwall Supports
By J. A. Nemcik
Although floor failure at longwall faces has been traditionally associated with a soft floor, in many csses floor buckling has been observed just ahead of the longwall supports, despite the floor bein
Jan 1, 1995
-
Recent Innovations for Slope Development
By Tim Burgess
Patton Mining, LLC and J.H. Fletcher Company recently collaborated and mechanized the sometimes hazardous, and always labor intensive, process of installing standing steel supports during the construc
Jan 1, 2011
-
Study on Top-Coal Loss and the Optimum Drawing Interval of Longwall Top-Coal Caving Mining
By Qiang Fu
ABSTRACT This paper aims to identify the main issues concerning top-coal loss and the optimum drawing interval of LTCC (Longwall Top-coal Caving) mining by underground tests and DEM (Distinct Element
Jan 1, 2002
-
A Method For Establishing Site Specific Coal Pillar Design Guidelines
By Winton J. Gale
Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factors,
Jan 1, 1992
-
Investigation Of Blast Damage And Underground Stability
By S. Paul Singh
The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper
Jan 1, 1993
-
Economic Evaluation Of Subsidence Damage Mitigation Techniques
By David C. Johnson
Coal mining in Illinois has resulted in many structures being exposed to subsidence damage. Damage mitigation techniques (DMT) applied in the foundation design/construction have proven successful in m
Jan 1, 1993
-
Improvement in Pre-Tensioning of Strand Bolts in Australian Coal Mines
By Mietek Rataj
Installation of pre-tensioned Strand Bolts i.e. resin grouted cable bolts is very common now in Australian coal mines. A short historical development of this type of rock reinforcement is outlined Var
Jan 1, 2002
-
A New Rockbolt Axial Load Measuring Device
By Hani Mitri
A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a
Jan 1, 2001
-
Determination Of Plate Size Effect On Ultimate Bearing Capacity Of Weak Floor In Underground Coal Mines Using A Boundary Integral Approach
By Zhanjing Yu
In this paper, an equation is developed to characterize the relationship between the UBC and plate size using a boundary integral approach. The equation was validated by the results from mo& than seve
Jan 1, 1993
-
Effect Of Longwall Mining Subsidence On The Stability Of Surface Slopes
By John J. Bowders
The stability of surface slopes undergoing subsidence due to longwall mining was investigated to examine the effect the subsidence had on the stability of the slopes. Stability analyses were performed
Jan 1, 1988
-
SDPS For Windows: An Integrated Approach To Ground Deformation Prediction
By David Newman
The latest version of the Surface Deformation Prediction Software (SDPS) package is presented through its application to a number of case studies. The package now exploits all the benefits of the Micr
Jan 1, 2001
-
Chemical Destressing to Alleviate Rockbursts
By S. P. Singh
Destress blasting is commonly used in the mines to minimize the occurrence of rockbursts. The fracturing created by destressing in the vicinity of the face reduces the stress concentration by pushing
Jan 1, 1987
-
Effects of Longwall Mining on Streamflow in the Pittsburgh Seam Basin
By Kenneth L. Johnson
The effects of underground longwall coal mining on flow in perennial streams within the Pittsburgh seam basin were evaluated. Four streams above four different longwall mines were studied. Overburden
Jan 1, 1997
-
Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel Floor
By Hideki Shimada
In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior
Jan 1, 2002
-
Field Testing of the Fully Grouted Thrust Tensioned Bolts
By Kot Unrug
Fully grouted tensioned bolts provide a desirable compressive of laminated roof and bondage along the entire bolt length, at the same time the entire surface of the hole is protected against penetrati
Jan 1, 2002