Predication Of Heave For Deep Excavation With Irregular Plane Shape
By Zhang Jiaju
For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method
Jan 1, 1991
-
Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge
By Jacob Chacko
The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new
Jan 1, 2002
-
History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982
By Bruce Haldeman
Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th
Jan 1, 1984
-
Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In Marl
By Gregory J. Canivan
Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and
Jan 1, 2002
-
Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:
By Alun J. Davies
This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co
Jan 1, 2000
-
Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving
By Hodjat] [Shiri
A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in
Jan 1, 2006
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation
By Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991
-
Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)
By Richard J. Finno
This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti
Jan 1, 2010
-
Skirt Suction Foundation - Application To Strait Crossings -
By Takashi Saito
Since early 1970?s skirt suction foundations (skirted foundation / bucket foundation) have been used as support for large fixed substructures or anchors for floating structures in offshore hydrocarbon
Jan 1, 2013
-
EFFC-DFI Geotechnical Carbon Calculator Project
By Vincent Joannes, Marine Lasne, Luca Brenelli, Colin Serridge, Inge van Baardwijk, Martin Stanley, Anthony Fisher, Mary Ellen Bruce, Tony Suckling, Pedro Avellanosa
"Abstract The European Federation of Foundation Contractors (EFFC) and Deep Foundations Institute (DFI) developed a sector-specific carbon accounting methodology and associated “carbon calculator” for
Jan 1, 2014
-
Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985
By Donald J. Murphy
Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in
Jan 1, 1986
-
Untangling The Octopus" Bored-In Pile Construction - On Nysdot Project D256424 Ithaca, New York - Executive Summary - Bored-In Pile Construction
By Andrew L. Peterson
CATOH Inc. of Weedsport, New York recently completed a very challenging Bored-In Pile project which features unique construction techniques in the installation and load testing of 45 and 100 ton capac
Jan 1, 1997
-
Underwater Concrete - Mix Design And Construction Practices
By Sam X. Yao
The underwater concrete technology has historically evolved largely through a trial-and-error process of constructing marine works. Many outstanding examples exist of high quality concrete placed unde
Jan 1, 2013
-
Evaluating Geotechnical Resiliency Solutions in New York City
By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
When selecting a solution for improving resiliency at facilities, such as airports, utility and transit sites, there are many options to protect structures and equipment against potential flooding. Ea
Jan 1, 2018
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication
By Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Identification and Quantification of Pile Relaxation
By Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019
-
Experimental And Theoritical Studies On Pile Capacity - Synopsis
By K. Rambha Devi
The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s
Jan 1, 1996
-
Analysis Of The Settlement Of A Single Axially Loaded Soil-Cement Pile
By Jiwei Duan
The deformation and load transfer behavior of a single soil-cement column are studied with the finite element method. The results show that there is an effective length for a soil-cement column. Beyon
Jan 1, 2002
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)
By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Design Of Drilled Shafts Supporting Sound Walls
By Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007