Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Structural Underpinning an Airport Terminal to Mitigate Tunneling Risk—Atlanta Plane Train West Extension Project - RETC2023By John Murray, Ryan Smith, Daniel Ebin, Robert Gould, Thomas Hennings
The Atlanta Plane Train Tunnel West Extension was excavated at Hartsfield-Jackson Atlanta International Airport using Sequential Excavation Methods (SEM). At its shallowest point, tunnel cover to bott
Jun 13, 2023
-
Risk Baseline Report: An Innovative Risk Management Approach for a Complex Underground Project - RETC2023By David J. Hatem, K. Bhattarai
The increasing popularity of alternative methods in delivery of underground infrastructure projects has given rise to innovative and collaborative contracting strategies to allocate and manage the uni
Jun 13, 2023
-
New Diversion Hydropower Plant—Nedre Fiskumfoss - RETC2023By Mads Aniksdal
New Nedre Fiskumfoss is a construction project in North Trøndelag, Namsen River. The purpose of the contract is construction of a new hydropower plant, that will phase out the existing power plant in
Jun 13, 2023
-
A Case Study from India on TBM Driving Under Low Overburden - RETC2023By Debasis Barman
TBM (TBM) mining in urban areas particularly under low overburden is a big challenge to design and excavate. During excavation of the Lucknow Metro project, in Uttar Pradesh, India the metro authoriti
Jun 13, 2023
-
Mobile Solid-State Lidar for Construction Quality Assurance - RETC2023By Adam Saylor, Travis A. Shoemaker, Steve Miller
Lidar scanning has become an increasingly popular tool for documenting underground excavations; however, high costs of traditional mechanical electrical lidar hardware, software, and training have lim
Jun 13, 2023
-
Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty
The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste
Jun 13, 2023
-
New Water Supply—Oslo - RETC2023By Ingunn Opland, Silje M. Tinderholt
Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av
Jun 13, 2023
-
Innovative TBM Launching in Urban Areas - RETC2023By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
-
Project Clean Lake’s First Large Diameter EPB TBM in Cleveland, Ohio - RETC2023By Erica McGlynn, Brian Negrea, Lance Jackson
There was no need for the people of Cleveland to ask “Where does the raw sewage go? We want to know!” because it was clear. The raw sewage was being discharged into Lake Erie during heavy rainfall eve
Jun 13, 2023
-
Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan
The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J
Jun 13, 2023
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023
-
Development and Performance of Large Span Caverns at Depth for the LBNF Far Site Project - RETC2023By S. Pollak, J. Rickard
The Long Baseline Neutrino Facility Far Site in Lead, South Dakota is currently under construction and involves drill and blast excavation of the largest and deepest caverns in North America. This pap
Jun 13, 2023
-
A Case Study in Successful Progressive Design Build Tunneling - RETC2023By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and
Jun 13, 2023
-
Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani
The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P
Jun 13, 2023
-
Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu
The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo
Jun 13, 2023
-
Progressive Design-Build in the Tunneling/Underground Construction Industry—Perspective from the Private Sector - RETC2023By Carlos Tarazaga
Progressive Design-Build (PDB) is an emerging variation of alternative delivery programs in the underground construction industry. PDB refers to the way a construction project design is developed by t
Jun 13, 2023
-
Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski
High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode
Jun 13, 2023
-
Unique Umbilical Launch of a Slurry TBM in LA - RETC2023By Nick Karlin
Dragados USA is constructing the LA Effluent Outfall Tunnel, a 7-mile, 18 ft internal diameter effluent discharge tunnel, utilizing a 21.6 ft (6.585 m) Herrenknecht Mixshield TBM. This paper highlight
Jun 13, 2023
-
Spontaneous combustion of carbonaceous shale at an iron ore mine, South AfricaBy B. Genc, C. Gous
Spontaneous combustion during coal mining operations is a major problem that affects the health and safety of workers and causes environmental problems. The phenomenon is associated with the presence
Jun 5, 2023
-
Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case studyBy M. Z. Emad, N. Abbas, Y. Majeed
Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov
Jun 5, 2023