Horizontal Stress and Coal Mines: Twenty-Five Years of Experience and Perspective
By G. J. Hasenfus
Although theoretical and conceptual knowledge regarding the impact of horizontal stress on underground coal mining excavations have existed since at least the mid-1900s, it wasn?t until the late 1970?
Jan 1, 2006
-
Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)
By David Newman
Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to
Jan 1, 2009
-
A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face
By H. C. Li
Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid
Jan 1, 1992
-
Evaluation of a Multiple Seam Interaction Coal Pillar Bump
By Michael Gauna
An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta
Jan 1, 2008
-
Subsidence and Ground Deformation Prediction in North America-A Case Study and New Method Developments
By Karsten Zimmermann, Peter Cain
"To receive regulatory approval for a new coal mining operation in North America, extensive investigations of feasibility and potential environmental impacts, including ground deformations, are requir
Jan 1, 2016
-
Weightings And Water Inflows During Longwall Working
By I. W. Farmer
Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are
Jan 1, 1996
-
Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress report
By Y. L. Sun
The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the
Jan 1, 1989
-
Geometrical Description of Gateroad Roof Sag
By Zbigniew Lubosik, Stanislaw Prusek
"The main elements of hard coal extraction systems in the Polish mining industry, including the characteristics of gateroads, are described, followed by several dozen underground measurements of gater
Jan 1, 2010
-
Stress Variation on Longwall Powered Supports in Upper Seam due to the Presence of Old Mined Out Workings in Lower Seam
By Vedala Sastry
Longwall mining for coal extraction in deeper deposits is gaining momentum in India, due to the increasing stripping ratios and depletion of shallow deposits amenable for surface mining. In longwall
Jan 1, 2007
-
An Assessment of Coal Pillar System Stability Criteria Based on a Mechanistic Evaluation of the Interaction between Coal Pillars and the Overburden
By Guy Reed, Russell Frith, Kent Mctyer
"Coal pillar design has historically been based on assigning a design factor of safety (FoS) or stability factor (SF) to coal pillars according to their estimated strength and the assumed overburden l
Jan 1, 2016
-
Letter Of Nomination
By Dr. Daniel W. H. Su
t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving
Jan 1, 2006
-
Work Practices to Manage Bump Prone Ground
By Floyd Varley
In deep and highly-stressed coal mining, advanced design practices are used to minimize the potential for damaging events to occur. Despite these design efforts, the hazard of coal mine bumps can not
Jan 1, 2008
-
Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts
By Damon P. Vandermaat
Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa
Jan 1, 2012
-
Tensioned Point Anchor Resin System Versus Non-Tensioned Fully Grouted Rebar - Two Case Studies
By John C. Stankus
Jennmar Corporation. in an effort to improve mine roof control, has conducted extensive study and research comparing tensioned point anchor resin systems versus the use of non-tensioned fully grouted
Jan 1, 1990
-
Indian Experiences Of Mechanised Coal Pillar Extraction (b04565f5-fd0b-4a80-a8aa-fcb98125fe52)
By Arun Kumar Singh
Wide variation in the nature of the coal seams and the surrounding rock mass of the Indian coalfields and very little information about the associated stress fields were observed to be the major hurdl
Jan 1, 2009
-
Computer Modeling Of Rock Mass Geomechanic State In Longwall Design
By V. D. Jalevsky
A new methodology of an experimental-analytical approach has been developed. It is used in building an information geomechanic monitoring system for the modeling of geomechanic processes during coal s
Jan 1, 1996
-
Field Verification of the Roof Fall Risk Index: A Method to Assess Strata Conditions
By Anthony T. Iannacchione
The Roof Fall Risk Index (RFRI) is a new method introduced by the National Institute for Occupational Safety and Health (NIOSH) to assist the underground stone mine operator in 1) assessing defects t
Jan 1, 2006
-
Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner
By Sanjay Kumar Singh
The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas
Jan 1, 2012
-
Caving, Seismicity, and Mine Design in Four Utah Mines
By Hamid Maleki
Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in
Jan 1, 2006
-
A Simple Tool to Measure Stress in Mine Backfill
By A. MacG. Robertson
A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro
Jan 1, 1986