Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring
By Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006
-
Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension Problem
By Guy Reed, Russell Frith
"Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h
Jan 1, 2017
-
A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining
By Michael Amick
Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro
Jan 1, 2007
-
Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?
By Dan Payne
The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo
Jan 1, 2008
-
Roof Control Problems on Development and Longwall Gateroads at a South- western PA Coal Mine
By T. P. Mucho
Over the past several years, two types of roof control problems have been en- countered at Beth Energy's Eighty Four Complex mine in Southwestern Pennsylvania. These problems have been (1) poor r
Jan 1, 1986
-
High Horizontal Movements In Longwall Gate Roads Controlled By Cable Support Systems
By Dennis R. Dolinar
Controlling coal mine roofs subjected to high-horizontal stress conditions has always been difficult and uncertain. Traditional supports such as wooden cribs and posts, concrete donut cribs, and stand
Jan 1, 1996
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)
By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
Application Of A Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model For Subsidence Prediction
By Witold M. Pytel
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the thi
Jan 1, 1992
-
Regional Joint Patterns in the Appalachian Basin: Implications for Ground Control and Origin of "Hill Seams"
By Sandin Phillipson
During the course of ground control evaluations conducted by the Mine Safety and Health Administration's Roof Control Division, a number of surface and underground coal mines were visited that exhibit
Jan 1, 2010
-
Time-Dependent Behavior Of Rocks: Laboratory Tests On Hollow Cylinder
By Gilles Rousset
This paper presents laboratory experiments conducted on hollow cylinders samples. The advantage of such a geometry is to approach in situ conditions around cylindrical openings (lined galleries, boreh
Jan 1, 1989
-
Optimizing Secondary Tailgate Support Selection
A model was developed to facilitate secondary tailgate support selection based on analysis of over 100 case studies, compiled from two different surveys of operating longwall coal mines in the United
Jan 1, 1996
-
Classification Of Large Seismic Events At The Lucky Friday Mine
By J. K. Whyatt
The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of
Jan 1, 1996
-
Three-dimensional FEM analysis to sale field measurements from deep mine accessways
By M. J. Beus
A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair
Jan 1, 1989
-
Clay Veins: Their Physical Characteristics. Prediction, and Support
By Frank E. Chase
Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos
Jan 1, 1984
-
Geomechanic Monitoring And Distributed Information Systems
By G. I. Gritsko
In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t
Jan 1, 1996
-
Main Gate Roof Support Design and Management During Longwall Retreat in the Australian Coal Industry
By Rob Thomas
Main gate roof control during longwall retreat is subject to a significant increase in horizontal stress and risk. The implementation and management of an appropriate roof support design is as a resul
Jan 1, 2006
-
Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)
By Dennis Dolinar
Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins
Jan 1, 2009
-
A Case Study of Longwall Roof-Supports Interaction
By Y. H. Wang
During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research
Jan 1, 1986
-
The Load Transfer Properties of Post?Groutable Cable Bolts Used in the Australian Coal Industry
By Rob Thomas
Adequate load transfer is considered essential for optimum ground support and is increasingly important in weak roof and/or high stress environments. If adequate load transfer is achieved not only can
Jan 1, 2012
-
Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions
By Peter Zhang
Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess
Jan 1, 2007