Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground

    By K. Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 1, 2024

  • ISEE
    Quantifying Shovel Performance Through Blast Pattern Boundaries

    By K. Taylor

    In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera

    Jan 1, 2024

  • ISEE
    Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry

    By R L. Mayville

    The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse

    Jan 1, 1984

  • ISEE
    Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management

    By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus

    Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan

    Jan 21, 2025

  • ISEE
    Economic and safety benefits of StratablastTM for steeply dipping coal seams - a case study

    By Tapan Goswami, Brent Geoff

    Mining multiple steeply sloping coal seams introduces challenges in terms of safety and productivity. Work on steeply sloping surfaces for the processes of bench preparation, mark-out, drilling, loadi

    Jan 1, 2010

  • ISEE
    Blasting Versus Non-blasting Related Sounds in a House Near Surface Blasting

    By Braden Lusk

    A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav

    Jan 1, 2011

  • ISEE
    A New Method of Reactive Ground Testing

    By Gary Cavanough

    The spontaneous exothermic reaction of ammonium nitrate explosives with sulphide-containing rocks, commonly referred to as reactive ground, is a site-specific condition that can lead to spontaneous de

    Feb 6, 2023

  • ISEE
    Controlled Blasting in Natural Geotechnical Structures (cavities) at the Hierro Mine - Brazil

    By Sérgio Augusto Ferreira, Alan Gerson Diaz Butron, Carlos E. Arroyo, Marcus Neves, Jorhs Enrique Casimiro Huayhua, Dieggo Santos, Eventomar Junior

    The presence of natural underground cavities is normally a characteristic of iron ore deposits, specifically in tropical deposits. Brazil and the United States are the only countries that have a legis

    Feb 6, 2023

  • ISEE
    Journal: 100 Years / Scientific American New York December 2, 1911 The First National Mine Safety Demonstration Study Of A Real Mine Explosion By Charles L. Wright, Fuel Engineer, Bureau Of Mines

    By Robert Hopler

    THE work that is being done by the Government to reduce the dangers of mining was brought out strikingly in the First National Mine-Safety Demonstration which occurred at Pittsburgh, Pa., on October 3

    Jan 1, 2012

  • ISEE
    Drilling Cost Optimization by Using a Water-Powered Drilling Technique at an Underground Sublevel Stoping Operation

    By Alexandra Yuyali

    The objective of this research work is to increase the drilling ratio represented in tons per drilled meter (ton/m) to reduce mining costs. One of the key characteristics of this research is the use o

    Jan 21, 2025

  • ISEE
    Advance Blasting using Drone Mapping and AI for Comprehensive Blast Performance Analysis

    By Dr. Anurag Agrawal, Fathur Rozaq, Nella Lubis, Relinda Sanistya, Herry Saputra, Rudolf Sitorus

    In mining operations, basic drone applications such as pre- and post-blast photo comparisons, blast video recordings, and sample-based fragmentation analysis are often used to assess blast performance

    Jan 21, 2025

  • ISEE
    Valdez, Alaska Glacier Point Quarry – One Shot / One Chance for Success

    By Billy Rosseau, Mike Cammack, Richard O’Meara, Gustavo Azpilcueta

    During the summer of 2014, the U.S. Army Corps of Engineers (USACE) sought proposals to vastly improve and expand the small boat harbor in Valdez, Alaska. It would be a multi-year project, and constru

    Jan 1, 2017

  • ISEE
    An Empirical Method of Comparing Brisance of Various Bulk Explosives

    By Neal Lee, Braden T. Lusk, Brendan McCray

    "Selection of a blasting agent for optimum performance is based on many variables. Often, a decision is made with regard to product cost and field testing. Defining optimum performance can be difficul

    Jan 1, 2017

  • ISEE
    Using New Technologies to Achieve Customer Tailored Fragmentation

    By Felix Degold, Mark Ganster

    Achieving a customer optimized fragmentation by using robust data from new technologies e.g. GPS positions of boreholes, fragmentation analysis to calibrate the geology and fragmentation prediction mo

    Feb 1, 2020

  • ISEE
    Automatic 3D Fragmentation Analysis from Drone Imagery

    By Andreas Gaich

    A new 3D fragmentation analysis method for muck piles is presented. It works with aerial imagery from UAVs (drones) and handles entire muck piles with minimum user intervention.

    Feb 1, 2020

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Median and Mean in the Kuz-Ram Model

    By CVB Cunningham

    "The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion

    Jan 1, 2016

  • ISEE
    Preventing the next Terrorist Attack is a Shared Responsibility

    By Joseph Kennedy

    How do terrorists and other criminal bombers acquire explosives to be used in an attack against U.S property and/or citizens? The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) with nearly

    Jan 1, 2010

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004