Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Elimination of Environmental Footprint: LVCC Expansion - Foundation InstallationBy Zachary Q. Maassen
Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio
Jan 1, 2019
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case StudyBy Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In China (325b7cc0-aff5-4a88-9f69-cd3dc2f57f1d)By Han Jie
The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with
Jan 1, 1991
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
Vancouver Island Conference Centre Cutter Soil Mixer Technology Transforms SiteBy Brian Wilson, John Scholte, Megan Atkinson
"In November 2004, the residents of the City of Nanaimo, B.C., Canada voted to approve a new conference centre as the centrepiece of a proposed revitalization project for the city’s historic downtown
Jan 1, 2008
-
Digitalization in Reverse Circulation Drill RigsBy N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case StudyBy P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)By Jeffrey M. Taylor, Arturo Ressi di Cervia
"Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con
Jan 1, 2004
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
A Study On Performance Of Piles Based On Methods Of InstallationBy Babu K. V., Samyukta P.
The energy demand in India is expected to show increasing growth in the next few decades. The oil companies in India are revamping the existing oil refineries as well as constructing new refineries ac
Sep 1, 2022
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Dam Wall Toe Stabilisation Using Mass Soil Mixing TechniquesBy David W. Martel, Tom George
"As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac
Jan 1, 2015
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way LimitsBy Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
Structural Evaluation of Thermal Integrity Profile Results of Transmission FoundationsBy Ryan Weaver, Travis Coleman
The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b
Jan 1, 2019
-
New Developments of Jacked PilesBy Victor Li, Joley Lam
"INTRODUCTIONJacked piles are piles that are pressed into the ground, usually by hydraulic jacks. For this reason, jacked piles are also known as pressed in piles. Jacked piles are mainly used for the
Jan 1, 2004
-
Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity ProfilingBy Garland Likins, Gray Mullins, George Piscsalko
"Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or
Jan 1, 2016
-
Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in RomeBy Bruno Vingiani, Alessandro Bertero
"The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t
Jan 1, 1900
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Performance Of Open And Close-End Screw Piles In Bearing LayerBy Faisal Shalzad, Adnan Anwar Malik, Tadashi Maejima, Jiro Kuwano
Single helix screw piles carry most of the structural load through end-bearing if the helix is embedded in the dense bearing layer. The tip condition of the central shaft of the screw pile can be clos
Oct 1, 2022