Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Room-and-Pillar Mining at Devco?s Prince Mine

    By A. R. MacLean

    This mine is situated at Point Aconi, Cape Breton , Nova Scotia, and is a replacement for the 100-year-old Princess Collie ry. It is a slope mine which is the continuation of a s trip mine operation.

    Jan 1, 1978

  • CIM
    Wireless Networks What You Must Have to be SUCCESSFUL

    By Gary Anderson

    ??Privately Held Corporation ??Incorporated in Delaware, May of 2002 ??HQ in Malvern, PA (just outside Philly) ??Approx 40 employees ?9 Field Engineers ?MSHA Certified ?10 Development/NOC Enginee

    May 1, 2009

  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • CIM
    Accurassay Laboratories: State-of-the-Art Automation of the TSMC Iron Ore Lab

    By Brad McBain

    Agenda ? Accurassay Laboratories and Automation ? History and experience ? Features and benefits of automation in the lab ? Tata Steel Minerals Canada (TSMC) Iron Ore Laboratory ? State-of-the a

    Aug 1, 2013

  • CIM
    Les minéraux industriels au Québec

    By Henri-Louis Jacob et Marc Bélanger

    La province de Québec est un important producteur de roches et de minéraux industriels. En 1998, la valeur de cette production se chiffrait à 1,26 milliard de dollars canadiens (données préliminaires)

    Jan 1, 2001

  • CIM
    A practical solution to cable bolting problems at the Tsumeb Mine

    By W. H. Stheeman

    "The high rock pressures at the deeper levels of the Tsumeb Mine have necessitated the changing of the mining methods and the introduction of cable bolts. After two rockfalls in the cable-bolted stope

    Jan 1, 1982

  • CIM
    Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique

    By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen

    "In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c

    Jan 1, 2015

  • CIM
    Geology at the Argosy old Mine, Casummit Lake, Ontario

    By H. C. Horwood

    INTRODUCTION THE Argosy Gold Mines, Limited, which joined the ranks of active Ontario gold producers during the summer of 1936, holds a group of 21 claims on Casummit lake, in the Patricia portion,

    Jan 1, 1937

  • CIM
    A New Rheoforming Processing Of Semi-Solid Aluminum Alloys

    By J-L. Tang

    A new rhcoforming processing of Al alloys with component shaping systems apart from slurry preparation systems is experimentally exploited, using the reversible multilevel-speed electromagnetic stirre

    Jan 1, 2007

  • CIM
    Treatment and History of Arsenic Bearing Ores at Con Mine

    By Adrian Daniel

    "Dating back to 1934, Con Mine is located directly south to the city of Yellowknife in the NWT, Canada. With mill operations ceasing in 2004, a challenging surface remediation situation resulted which

    Jan 1, 2009

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Effect of Thermomechanical Processing on Microstructure and Mechanical Properties in an Al-Cu-Mg-Si Alloy

    By R. Holmestad, M. Gazizov, S. Wenner, R. Kaibyshev, J. K. Sunde

    "Mechanical properties and microstructure of an Al-4.7Cu-0.74Mg-0.51Si-0.48Mn-0.10Cr-0.09Ti-0.02Fe (wt. %) alloy subjected to various thermomechanical processing (TMP) have been investigated and compa

    Jan 1, 2018

  • CIM
    The U.S. Mineral Property Valuation Patchwork of Regulations and Standards (b596e322-36dd-40ba-820a-fc3646322652)

    By Trevor R. Ellis

    "The valuation of mineral properties in the U.S. is only partially regulated. The regulations which have jurisdiction or impact appear to have such mainly as a consequence of unintended fallout, since

    Jan 1, 2003

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Techno-economic evaluation of thiosalt treatment processes

    By K. G. Wheeland, J. E. Dutrizac, M. Wasserlauf, A. A. Condy

    Numerous processes for the treatment of thiosalts in base metal milling effluents have been examined in the past decade. Flowsheets for thirteen processes are outlined, and cost estimates are presente

    Jan 1, 1988

  • CIM
    Crushing and Grinding Practices at Brenda Mines Limited

    By G. P. Holmes

    "IntroductionThe copper-molybdenum property of Brenda Mines Ltd. is located 18 miles north west of Peachland in the Okanagan Valley of the Southern Central interior of British Columbia. The actual sit

    Jan 1, 1972

  • CIM
    Paracatu Gold Mine - Successful Processing of a Large Low-Grade Ore Body

    By Wayne Phillips, Anatalia Silva, Robert Henderson, Tondo. Luis

    "Kinross’ Paracatu Mine has 20 years of operational success as one of the lowest grade milloperated gold mines in the world. At year end 2005, Paracatu’s Proven and Probable Reserves were 1.18 billion

    Jan 1, 2007

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • CIM
    What are the Opportunities and Challenges for Women in Fly-in-fly-out (FIFO) Mining in Canada? An Exploratory Study

    By Costa

    The fly-in-fly-out (FIFO) mining model has significant implications for the industry as it plays an important role in fulfilling the economic, social and workforce needs of the contemporary mining ind

    May 1, 2006