Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Improving mining and minerals plant performance: operations and maintenance working together using new information technology

    Operations and maintenance departments have had a long-standing adversarial relationship. The widespread evolution and adoption of modern management techniques, such as reliability centered maintenanc

    Jan 1, 2009

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Gravity Concentration of Gold from Base Metal Flotation Mills

    By M. Ounpuu

    "Gold, because of low head grade and recovery, is usually of minor importance in the economics of base metal flotation mills. Because of the above little metallurgical attention is usually provided to

    Jan 1, 1992

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Ore Processing Business Experiences in Russia 2005-7

    By John Starkey

    "During the period June 2007 to March 2007, John Starkey of Starkey & Associates (Starkey) worked in Russia for High River Gold, supervising the engineering design work that was being done at the IRGI

    Jan 1, 2008

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance (1255a8ec-f486-4f0e-a99f-bee3df1f60e5)

    By P. H. Oliver

    "The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row del

    Jan 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003

  • CIM
    MAC and the AFN: Taking Up the Corporate Challenge

    Taking Up the AFN Corporate Challenge ?? About MAC ?? ?Towards Sustainable Mining? ??Mining and Aboriginal Peoples Framework ?? AFN-MAC Relationship ?? A New MAC Northern Initiative ??Social and

    May 1, 2009

  • CIM
    Switched Reluctance Drive: The Ideal Feeder Drive

    By Svato Prochazka

    Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?

    May 1, 2010

  • CIM
    Experimental Investigation of a Heap Leaching Process on Montauban Gold Tailings

    By J. Dionne

    "Next to the actual mine of Les Explorations Muscocho Ltée in Montauban, Quebéc, you could find a total of 364 000 tons of flotation tailings assaying 1.4 Au g/t et 82 g Ag/t to the south of the munic

    Jan 1, 1987

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Improving Fine Lead and Silver Flotation Recovery at BHP-Billiton’s Cannington Mine

    By Glenn Clarke, Ben Holloway, Barry Lumsden

    "BHP-Billiton’s Cannington mine in Northwest Queensland produces a silver-rich lead concentrate and a zinc concentrate. The plant has the capacity to treat 3.1 mta and for the year to June 2006 mean f

    Jan 1, 2008

  • CIM
    Flotation Circuit Analysis at Zinifex Century Mine

    By Dan Alexander, Ivan Crnkovic, Sarah Schwarz

    "Several plant studies have been conducted at the Zinifex Century Mine over the past 5 years. For each of the plant studies, surveys of the zinc primary circuit were conducted, characterisation measur

    Jan 1, 2008

  • CIM
    The Red Dog VIP mill optimization project. Part B: An integrated approach to modelling and design of the flotation plant

    By B. K. Gorain, A. W. Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2003

  • CIM
    A New Curriculum Prepares Future Engineers in Mineral Processing and Extractive Metallurgy at Laval University

    By Daniel Hodouin, Claude Bazin, René del Villar

    "A traditional linkage has long been established at Laval University's Department of Mining & Metallurgy between the Mineral Process (MP) and the Mining Exploitation (Min) on one hand, and between the

    Jan 1, 1999