Jolu Gold Mine Low Cost Gold Recovery ConfigurationBy J. Kazakoff
"The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This
Jan 1, 1990
-
Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper ConcentratorBy M. Massinaei, S. Abasi, M. Oliazadeh
Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o
Jan 1, 2019
-
Some Crushing and Grinding Considerations in Plant DesignBy H. A. Steane
"This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i
Jan 1, 1976
-
Link Between Parameters in Rock Mass ClassificationBy Doug Milne
Linking Classification Systems with each other Similar Parameters between systems Different Rock Mass Properties Rock Mass Classification parameters and geology Different sources of data Co
May 1, 2013
-
Fine Grinding of a Sparsely Disseminated Sulphide OreBy Augustine O. Orumwense, Micheline Boisclair
"The use of stirred mill to complement tumbling mills in grinding fine grained minerals is increasingly becoming an attractive processing option. Parameters such as agitation speed, grinding media typ
Jan 1, 2008
-
Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant OperationsBy Euler De Souza
The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice
May 1, 2009
-
Enhanced Oxygen Transfer in Gold CyanidationBy Ralph Harris, Xia Qi, Frank Komsic
"Gold cyanidation kinetics which are often limited in commercial operations by the rate of oxygen dissolution from gas bubbles into the slurry, are discussed. Emerging technologies for improving the r
Jan 1, 1996
-
Estimation of liberationBy T. Yalcin
"This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,
Jan 1, 1985
-
From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles ConcentratorBy Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin
"North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part
Jan 1, 2003
-
Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral ProcessingBy R. W. Lawrence
"In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc
Jan 1, 2007
-
Safety Lessons Learned Building two Diamond MinesBy D. L. Putnam
Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile
May 1, 2008
-
Environmental Relevance of the Leachate Potential for Dry Storage of Delayed CokeBy Joseph L. Fournier
Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading
May 1, 2011
-
Sampling and assaying of coarse gold at La Herradura–Minera Penmont S. de R.L. de C.V., MexicoBy S. Cossio, J. L. Noyola, R. Espinosa
"Minera Penmont’s La Herradura is a joint venture between Industrias Peñoles, S.A. de C.V. and Newmont Mining Corporation. The mine is located in the northern Mexican state of Sonora. La Herradura con
Jan 1, 2004
-
Concepts for Remote Mineral ProjectsBy L. J. Vincze
The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a
Jan 1, 1980
-
The Determination of Selection Elements and Lumped Parameters for Grinding MillsBy A. L. Mular
This paper provides a worthwhile contribution to the knowledge needed for calculating and using mathematical models of grinding circuits. The computer search algorithm proposed should remove much of t
Jan 1, 1970
-
Future of Oxygen Steelmaking: Myths and RealityBy R. J. Fruehan
Oxygen steelmaking (OSM) is not only the dominant steelmaking process but defines the structure of the industry. There are a number of myths regarding the future of OSM, which are false. These myths i
Jan 1, 2004
-
Mine Reclamation in a Changing Regulatory EnvironmentBy David H. Searle
This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well
May 1, 2006
-
Dust Control at Granisle CopperBy L. W. Hamel
"DUST CONTROL - GRANISLE COPPER LIMITEDINTRODUCTIONGranisle. Copper Limited is located in the north-central region of the Province of British Columbia, approximately 200 road miles north-west of Princ
Jan 1, 1976
-
Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )By D. Ingram
"PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it
Jan 1, 1976
-
Nickel production from low-iron laterite ores: Process descriptionsBy R. A. Bergman
"Process descriptions are provided for the following ten plants that treat high-magnesia lateritic nickel ores (saprolite) by pyrometallurgical means: PT Aneka Tambang; Cerro Matoso S.A.; Falconbridge
Jan 1, 2003