Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants

    By Tim Hughes, Steve Gannon, Jennifer Abols

    "In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal

    Jan 1, 2007

  • CIM
    Structure, Stratigraphy, U-Pb Geochronology and Alteration Characteristics of Gold Mineralization at the Detour Lake Gold Deposit, Ontario, Canada (7fbdd5b5-ed88-46a3-b280-65b8ab04c5b6)

    By B. Dubé, R. Friedman, J. Oliver, R. Aubertin, M. Burson, G. Panneton, M. Hamilton, J. Ayer

    "Abstract — The Detour Lake gold deposit is located within the northwestern limit of the Archean Abitibi Subprovince of the Superior Province. Mineralized zones are hosted by a sequence of pillowed an

    Jan 1, 2012

  • CIM
    Effect of Fraction Solid and Shear Rate on the Viscosity of Conventionally Cast Semi-Solid A356 Al-Si Alloy

    By O. Lashkari, A. Charette, R. Ghomashchi

    Conventional casting at low pouring temperature was employed to produce semisolid metal, SSM, billets of A356 Alloy. The deformation behavior of the as-cast SSM billets was studied using parallel plat

    Jan 1, 2006

  • CIM
    Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce Costs

    Mining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins

    May 1, 2013

  • CIM
    Basic Refractories in Canada, 1914 and 1939

    By F. E. Lathe

    RECENT events have emphasized with renewed force the well known fact that war greatly intensifies the demand for certain metals, particularly for iron, copper, and zinc. Any increase in the use of iro

    Jan 1, 1940

  • CIM
    Consideration of Post-Peak Response of the Pillar-Rock System in Sill Pillar Design

    By Omkar N. S. Beruar

    Extraction of sill pillars has always been problematic because of high risk of seismicity and rockburst. Depending on a number of factors, a sill pillar can undergo different failure modes and cause p

    Aug 1, 2013

  • CIM
    The Schaft Creek Porphyry Cu-Mo-(Au) Deposit, Northwestern British Columbia

    By J. E. Scott, L. M. Heaman, R. A. Creaser, G. S. Salazar

    "Schaft Creek is a calc-alkaline porphyry Cu-Mo-(Au) deposit located in northwestern British Columbia. The deposit formed in a volcanic arc setting, likely on a back-arc rifted continental fragment. I

    Jan 1, 2008

  • CIM
    Modelling of the Dry Magnetic Separation Process at Rio Tinto Fer et Titane

    By Carl Bertrand, Patrice Nadeau, Claude Bazin

    "Rio Tinto Fer et Titane processes the ore extracted from the Lac Tio orebody to concentrate the hemo-ilmenite (FeO.TiO2-Fe2O3) mineral that is subsequently smelted to produce pig iron and titanium ox

    Jan 1, 2011

  • CIM
    Effects of Hydraulic Fracture Crossing Natural Fractures: Numerical Study using Hybrid Discrete-Continuum Modeling

    By B. Damjanac, S. Maxwell, D. Chorney, M. Grob, F. Zhang, J. Hazzard

    "A hybrid discrete-continuum numerical scheme is developed to study the behavior of hydraulic fractures crossing natural fractures. The fully coupled hybrid scheme utilizes a discrete element model fo

    Jan 1, 2015

  • CIM
    On the Use of Large OK-16 Flotation Machines at the Concentrators of Outokumpu Oy

    By Tapio Leskinen

    "In the 1960’s, when large flotation machines appeared on the market, this was a part of a world-wide trend towards the use of ever larger machine units.One factor that has played a decisive part in t

    Jan 1, 1976

  • CIM
    Improving Column Flotation Cell Operation in a Copper/Molybdenum Separation Circuit

    By Jose R. Hernandez-Aguilar, Jeet Basi

    "The study evaluated the impact on overall circuit metallurgy of improving the performance of the two flotation columns that make up the final Mo cleaning stage in the Cu/Mo separation circuit at High

    Jan 1, 2009

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    Applications of Mineral Fillers in the Paint and Plastics Industries

    By Kurt F. Weitz

    "The number of materials that can be classified as fillers covers an extremely wide range: this paper outlines those fillers of the industrial mineral type that find extensive application in the paint

    Jan 1, 1970

  • CIM
    Influence of Finger Configuration on Degradation of Ore Pass Walls

    By K. Esmaieli

    This paper addresses issues associated with ore pass degradation caused by material impact. A series of numerical experiments, using the particle flow code, were undertaken to investigate the influenc

    May 1, 2009

  • CIM
    Making it Happen at DeBeers Canada

    By Ingrid Hann

    The Triple Bottom Line ? Economic Sustainability ? Creation of Joint Venture companies ? Planned evaluation of other kimberlites ? Social Sustainability ? Impact Benefit Agreement and Participati

    May 1, 2008

  • CIM
    Inorganic Chemistry of the Platinum-Group Elements

    "2.1. General Considerations and Properties2.1.1. IntroductionOur present knowledge of the platinum-group elements (POE) is extensive, the reason being two-fold. The elements have many uses and, moreo

    Jan 1, 1979

  • CIM
    The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central America

    By Paul Hosford, Tim Haldane

    "The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate

    Jan 1, 2002

  • CIM
    Quantitative characterization of the REE minerals by QEMSCANTM from the Nechalacho Heavy Rare Earth Deposit, Thor Lake Project, NWT, Canada

    By Tassos Grammatikopoulos, Sarah Prout, William Mercer, C. Gunning

    "The Nechalacho rare metal deposit is located in NWT, Canada. Avalon Rare Metals Inc. is now evaluating processing techniques for recovery of REE to be used in the industry. QEMSCANTM analysis coupled

    Jan 1, 2011

  • CIM
    Geology of New Brunswick potash deposits

    By Paul W. Kingston

    In New Brunswick, during the 1970's, rocks of the Lower Carboniferous Windsor Group in the Moncton Basin of the Fundy Epieugeosyncline have been the target of intense exploration and drilling pro

    Jan 1, 1979

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016