Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Development and Commissioning of Ontario’s First Diamond Mine – The Victor Diamond Mine

    By Ian Holl, Adam Hempstock, Rickardo Welyhorsky, Niel Morrison

    "The Victor Diamond Mine is located in the James Bay lowlands, 90 km west of the First Nations village of Attawapiskat. The project was the first of its kind in northern Ontario and was completed appr

    Jan 1, 2010

  • CIM
    Microstructure and Mechanical Property of Al/Mg/Ti Laminated Composite Sheet Fabricated by Hot Roll Bonding

    By Guojun Wang, Zejun Chen, Wenchang Liu

    Al/Mg/Ti laminated metal composite sheet (LMCS) can combine the merits of each of metal components, and obtain excellent performances. It incorporates the advantages of high strength, light weight, ea

    Jan 1, 2015

  • CIM
    Obtaining metallurgical data from drill core samples using a mini pilot plant

    By Nilce Alves Santos, Vânia Lúcia de Lima Andrade, Keila Lane Carvalho Gonçalves, Harold Wyslouzi1

    "When confronted with the difficult decisions on advancing an exploration project to the feasibility and construction stages, it is important to know how various regions of the ore body will react in

    Jan 1, 2002

  • CIM
    Characterization of Nanometer and Ultrafine Diesel Aerosols in the Underground Mining Environment

    By Aleksandar D. Bugarski

    Despite extensive research efforts conducted in the past decades, occupational health risks associated with exposure to nano and ultrafine aerosols emitted by diesel power equipment are still not comp

    May 1, 2007

  • CIM
    Paste Production Storage Mechanism (PPSM), a Major Advance in Solids Concentration Technology

    By Rudy Tenbergen, Dick Farmery, Jim Naylor

    "Paste backfill has replaced cemented rock fill as one of the components to improve ground · control and mine safety at the Macassa Operation of Kinross Gold Corporation in Kirkland Lake, Ontario. It

    Jan 1, 1997

  • CIM
    The North American Iron Ore Industry A Decade into the 21st Century

    By J. D. Jorgenson

    ?? U.S. domestic production peaked at 120 Mt during years of the Korean Conflict120 Conflict ?? Pellet production increased, as highPellet high-grade ores decreasedores decreased ?? Until 1982 reces

    May 1, 2011

  • CIM
    Mechanical Integrity versus Process Safety Management Requirements

    By Hugo Julien

    According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,

    Jan 1, 2014

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • CIM
    A Review of Flotation Columns Application in Rougher Circuits

    By M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh

    "Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut

    Jan 1, 2011

  • CIM
    Ropes for Drum and Koepe Friction Hoists

    By H. Hitchen

    THE object of this paper is to present the various facts that l1ave been revealed during lengthy investigations into the performance of all types of ropes on different hoisting installations. It then

    Jan 1, 1963

  • CIM
    Technical Challenges in Laser Additive Manufacturing of Metallic Parts

    By J. Y. Hascoet, M. Marya, S. Marya

    Additive manufacturing (AM) brings disruptive changes over the ways parts and products are designed, tested, qualified, assembled, inspected and marketed. With these changes come real technical challe

    Jan 1, 2014

  • CIM
    Materials Requirements For Canada?s Nuclear Power Program

    By E. C. W. Perryman

    Materials research and development has played an important role in the commercial success of the CANDU- PHW nuclear reactor and in the production of heavy water. Both capital investment and energy con

    Jan 1, 1977

  • CIM
    Optimizing Grinding Circuits

    By James Anstey

    BHP Billiton?s Cannington facility is a mining and minerals processing plant near Mt. Isa in Central Queensland, Australia, producing silver, lead and zinc. Mine ore is processed in a concentrator, wh

    Apr 1, 2005

  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • CIM
    Design and Development of an LHD for Narrow-Reef Mining

    By Patrick F. R. Murphy

    The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a

    May 1, 2003

  • CIM
    Tendencies and Considerations for Energy Efficiency in Sag Mill Circuit Design from Recent Projects in Chile

    By C. Schuffeneger

    "The design of SAG milling circuits for mining projects requires the incorporation of the energy consumption considerations and the evaluation between different flexibility-adding options to absorb th

    Jan 1, 2012

  • CIM
    Practical rock engineering in the optimization of stope dimensions – application and cost effectiveness

    By J. W. Bawden, J. Nantel

    "The mine operator has two prime objectives when he operates a mine: (l) the mine must be safe, and (2) the mine must operate with the lowest possible costs. The operator constantly faces a dilemma; i

    Jan 1, 1989

  • CIM
    Real Time On-Belt Elemental Analysis Using PGNAA for Mineral Processing Plant Control

    This paper discusses how elemental analysis of conveyed bulk flows in real time using PGNAA (Prompt Gamma Neutron Activation Analysis) technology has resulted in significant improvements in advancing

    Jan 1, 2014

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits

    By M. Drozd, M. Somppi, Z. Yamak

    "Granular activated carbon is widely used in the gold mining industry for gold extraction from aurocyanide-containing slurry. The extraction process can employ carbon as part of the gold recovery oper

    Jan 1, 2017