Search Documents

  • NIOSH
    IC 8202 Sand And Gravel Operations And Costs, Concrete Materials And Construction Division, Martin Marietta Corp., West Des Moines, Iowa

    By L. G. Marshall

    This report describes dredging and processing of sand and gravel from a glacial-fluvial deposit in the Raccoon River valley near West Des Moines, Iowa. Preliminary cleaning and separation of the sand

    Jan 1, 1963

  • SME
    Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan Operations

    By A. Koski

    A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U

    Jan 1, 2007

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • SME
    Helping Banks To Manage Mineral Land Trusts

    By S. M. Pickering

    Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties

    Jan 1, 2002

  • NIOSH
    RI 4366 Flake-Graphite And Vanadium Investigation In Clay, Coosa, And Chilton Counties, Ala.

    By Hugh D. Pallister

    Alabama probably has the most extensive deposits of high-grade flake graphite in the United States and was the largest producer during World War I. Therefore, with the outbreak of World War II, users

    Jan 1, 1948

  • NIOSH
    OFR-5-79 Design And Testing Of A Continuous Excavator For Surface Coal Mining

    By Jules Gordon

    Presents the results of mining tests conducted on a forward rotating bucket wheel excavator designed to continuously mine coal at 1080 tons/hour, Goals of the program are to determine the feasibility

    Jan 1, 1977

  • SME
    Development described for fluidized bed combustion at TVA’s 20-MW pilot plant

    By James W. Bass

    Introduction Atmospheric fluidized bed combustion (AFBC) is an improvement over coal-fired boiler design. It offers several advantages over conventional boilers. AFBC can meet sulfur and nitrogen oxi

    Jan 4, 1986

  • CIM
    Selective Extraction and Recovery of Gold, Copper, and Other Base Metals from Mine Leach Cyanide Solutions Using Molecular Recognition Technology (MRT)

    By Ronald L. Bruening

    IBC has developed a cost effective MRT process for the selective extraction and recovery of gold, copper, and a mixture of other base metals from mine leach cyanide solutions. This is a two-stage syst

    Oct 1, 2003

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • AUSIMM
    The Mechanism of Xanthate Adsorption on Pyrite

    By Fuerstenau DW

    The flotation of pyrite in ethyl xanthate solutions is presented along with electrokinetic results. The results have been analysed in view of recently published thermodynamic calculations as well a

    Jan 1, 1993

  • NIOSH
    Dangers of Toxic Fumes from Blasting

    By Richard J. Mainiero, James H. Rowland III, Marcia L. Harris

    This paper reviews the potential hazards posed by the toxic fumes produced by detonating explosives in surface mining and construction operations. Blasting operations produce both toxic and nontoxic g

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • NIOSH
    OFR-3(2)-80 The Development of A Cross-Pit Overburden Handling System - Volume II - Appendix

    By J. Ritchey

    This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport sp

    Jan 1, 1976

  • ISEE
    Innovative Blasting Mine Life Extension at a Coal Mine in Australia

    By R. Bitmead, R Barker, A. Drake

    The opencut coal mine is located about 50 km west of Brisbane, the capital city of Queensland in Australia and produces about 140 000 tonnes per annum of high grade steaming coal utilising a small tea

    Jan 1, 2002

  • SME
    The Characterization Of Frothers And Frother Blends Based On Dynamic Surface Tension Measurements

    By B. Comley, M. C. Harris

    There is as yet no accepted method of predicting flotation frother performance in plant processes based on laboratory scale characterisation techniques. This paper investigates the use of dynamic surf

    Jan 1, 2001

  • NIOSH
    IC 8088 Coal-Mine Hazards Caused By Electrolysis ? Introduction

    By Clyde L. Brown

    The ignition source of fires and explosions in coal mines is sometimes difficult to explain because resulting widespread destruction often erases valuable evidence that might reveal the cause. However

    Jan 1, 1962

  • NIOSH
    Methods Of Analyzing And Testing Coal And Coke

    THIS bulletin presents all analytical and lest methods regularly used by Bureau of Mines laboratories for characterizing coal and coke. To provide better service to coal producers and consumers, the s

    Jan 1, 1967

  • SME
    Large Excavator Cuts Operating Costs at Alabama Coal Mine

    By Bill Elverman

    Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations

    Jan 1, 2005

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • SME
    Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill Grout

    By Lorenzo Pellegrini

    The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and