  • NIOSH
    RI 8134 Laser Alinement Sensor for Continuous-Mining Machines

    By Merle L. Bowser

    An alinement (steering) sensor for continuous mining machines has been developed under a Bureau of Mines contract. A laser source in the entry projects a beam parallel to the centerline of the entr

    Jan 1, 1976

  • CIM
    High Pressure Washing Technology “Hydro-Clean”

    By Sam Palombo, James José Varela

    "Washing can be defined as the process used to eliminate or reduce the dirt (presence of fines or slimes) of one material. It is also the basic and oldest process applied to ore preparation for furthe

    Jan 1, 2009

  • AUSIMM
    The Taranaki Oil-Field

    THE Taranaki oil-field is situated on the western side of the North Island of New Zealand, at about its widest part, and may be said to be the most compact and fertile part of the Dominion, for, with

    Jan 1, 1912

  • CIM
    Acid mine drainage prevention and control options

    By N. Kuyucak

    "Acid mine drainage (AMD) is one of the most significant environmental challenges facing the mining industry worldwide. It occurs as a result of natural oxidation of sulphide minerals contained in min

    Jan 1, 2002

  • SME
    John O. Marsden: An interview with the 2014 SME President

    We have lived through a period of strong metal pricing during the past eight to 10 years. Copper has been hovering in the range of $3-$4/lb during much of the past eight years, averaging close to $3.3

    Mar 1, 2014

  • NIOSH
    OFR-76-84 Methodology Development For Mine Life Safety System Evaluation

    By Nutter R. S.

    A methodology has been developed for qualitative safety hazard evaluation and quantitative reliability analysis of mine monitoring and control systems. Detailed application of these techniques were ma

    Jan 1, 1982

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • AIME
    Institute of Metals Division - Tensile Flow and Fracture Temperature Dependence of Some Iron-Base Alloys

    By John Nunes, Frank R. Larson

    Temperature-dependent functions of various ten-sile flour stress and fracture parameters were investigated on iron and low composition alloys of Fe-C, Fe-Cr, Fe-Mn, and Fe-Ni. Data were obtained over

    Jan 1, 1963

  • AUSIMM
    Development of Longwall Mining Technology

    Longwall mining originated in the early 18th century in the county of Shropshire in England, where it was known as the longway method. Its name implies the extraction of the seam over a long continuou

    Jan 1, 1991

  • ISEE
    Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control

    By Peter Moser, Mark Ganster, Andreas Gaich

    Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr

    Jan 1, 2007

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • SME
    Drilling And Lining Of The Ocean Shafts - Seabrook Power Project

    By B. J. Dave, Ashok J. Desai, Allen J. Hulshizer

    This paper presents various design and construction considerations involved in developing an underwater installation of lined, large diameter shafts not known to have been previously accomplished for

    Jan 1, 1976

  • NIOSH
    IC 6866 Recent Trends In Design And Construction Of Copper Concentrators In The Southwest ? Introduction

    By C. E. Rork

    This paper discusses various mechanical improvements that have been gradually incorporated in the copper-willing plants of the Southwest daring the past 14 years, power plants for concentrators, use o

    Jan 1, 1935

  • SME
    New XRF Analyzer For Elemental Analysis Of Sample Streams

    By C. Bachmann, M. J. Laurila, A. J. Widenman, A. Klein

    Elemental analysis of slurry streams using X-ray fluorescence (XRF) has long been employed. However, detector technology has limited the application of XRF devices. Using detector technology employed

    Jan 1, 1999

  • AIME
  • NIOSH
    OFR-103(3)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume III

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • ISEE
    Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field Controls

    Choosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra

    Jan 1, 1998

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • SAIMM
    Ferrochrome Smelting And Smelting Capacity Investment In Zimbabwe

    By J. Chirasha

    Keywords: Pyrometallurgy, ferrochrome, smelting, investment, Zimbabwe Four smelting plants currently make up the ferrochrome smelting capacity in Zimbabwe. Zimbabwe Alloys and Zimasco represent m

    Jan 1, 2011

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed